Appendix J - HJB 229 Instructions.pdf

PDF 54 KB Posted

Attached to
Protective Coatings
Solicitation number
W911S820B0002
Issued by

About this file

This document provides instructions for completing and submitting the JBLM Construction and Demolition (C&D) Diversion - Disposal Transaction Report Summary (HJB Form 229). The form is used to report data on C&D material generated from construction, renovation, repair or demolition projects at Joint Base Lewis-McChord (JBLM). Contractors and government organizations must submit the form on a quarterly basis, with deadlines of January 15, April 15, July 15, and October 15. The form requires project information including the calendar year, project number, contract/task order number, project name and location. It also requires reporting quantities in tons of diverted asphalt/brick/concrete, land clearing debris, metal, other recyclables, specialty materials, wood, and disposed materials. The top three destinations for each material must be listed. The instructions provide guidance on completion requirements and submission procedures.

View the file

Other files

File Type Posted
Amendment W911S820B0002-0004.pdf PDF
Enclosure 1 - Government Responses v1 28April2020.pdf PDF
Attachment 4 - General Decision Number WA20200018 06MAR2020_Thurston.pdf PDF
Attachment 9 - Tech Spec 04 01 40 - Historic Structures.pdf PDF
Evaluation Factors for Award_20April2020.pdf PDF
Attachment 1 - Statement of Work_22April2020.pdf PDF
EXHIBITS AND ATTACHMENTS_22April2020.pdf PDF
Attachment 11 - Technical Specification 09 90 00 - Paint and Coatings.pdf PDF
Attachment 6 - General Decision Number WA20200029 13MAR2020_Jefferson.pdf PDF
Instuctions to Bidders_20April2020.pdf PDF
Attachment 10 - Technical Specification 09 67 23.13 - Standard Resinous Flooring.pdf PDF
Attachment 8 - Technical Specification 02 83 00 - Lead Remediation.pdf PDF
Attachment 3 - General Decision Number WA20200013 06MAR2020_Pierce.pdf PDF
Enclosure 1 - Government Responses.pdf PDF
Attachment 5 - General Decision Number WA20200020 13MAR2020_Yakima.pdf PDF
Attachment 7 - Technical Specification 02 82 14.00 10 - Asbestos Hazard Control Activities.pdf PDF
Amendment W911S820B0002-0003.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1_22April2020.xlsx XLSX spreadsheet
Amendment W911S820B0002-0002.pdf PDF
Amendment W911S820B0002-0001.pdf PDF
Appendix H - Task Order SOW.docx DOCX document
Appendix I - Proposal Tech Review.xlsx XLSX spreadsheet
Appendix D - Eng Form 4025-R.pdf PDF
Appendix J - HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
Attachment 3 - General Decision Number WA20190013 22NOV2019_Pierce.pdf PDF
Appendix F - Sustainable Acquisition Exception Form - HJB 225.pdf PDF
Appendix A - AF Form 3065 Invoice.xls XLS spreadsheet
Appendix E - Daily Contract Inspection Report.pdf PDF
Appendix B - Project Schedule Example.xlsx XLSX spreadsheet
Invitation for Bid_W911S8-20-B-0002.pdf PDF
Appendix G - Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Appendix C - DA Form 5479 - CDR.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1.xlsx XLSX spreadsheet
Attachment 4 - General Decision Number WA20190018 22NOV2019_Thurston.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HJB Form 229 Instructions 1 Rev 2: 6/1/2015

Instructions for Completing and Submitting HJB Form 229 (Construction &

Demolition Reporting)

The following provides guidance for completing and submitting the JBLM Construction and Demolition (C&D) Diversion - Disposal Transaction Report Summary (HJB Form 229). Submittal of this form is mandatory under Department of the Army and JBLM policies.

“C&D material” means material generated from construction, renovation, repair or demolition of structures. The Secretary of the Army Net Zero C&D diversion goal is 60% by the year 2015. The IMCOM C&D diversion requirement is 60% by 2015, with an additional 1% every year thereafter.

HJB Form 229 contains the following required reporting elements:

Project Information

1. Calendar Year Being Reported: Indicate the year in which the work being reported was accomplished.

2. Project Number (IJO): Provide the numeric number that identifies the project. If the work request originated through JBLM Public Works (DPW), provide the IJO (job order) number that DPW assigned for tracking purposes.

3. Contract / Task or Work/Service Order Number: Provide the number that identifies the contract vehicle or internal work/service number assigned to the project, or the task order(s) against which the work is being performed. Multiple task orders can be assigned to a project.

4. Project Name / Site Location: Provide the project name and the work location or address

(building number and street name, or nearest cross streets or grid coordinates for non- facility work).

5. Contractor or Organizational Signature and Date: By signing the report, the contractor or

Government C&D employee validates the data provided. The contractor is required to submit project C&D reports on the following submittal deadlines:

• Projects of less than six months duration will report at end of contract.

• Contracts that exceed six months will report quarterly by the following suspense dates:

1st quarter: 15 January; 2nd Quarter: 15 April; 3rd Quarter: 15 July; 4th Quarter: 15 October.

Government C&D projects shall submit reports by the 15th day following the calendar year quarter being reported. If encountering obstacles to the tracking and measurement of quantities, contact usarmy.jblm.imcom.list.dpw-cd-reporting@mail.mil.

6. PM / COR or Shop Supervisor Signature and Date:

Project Manager/Contracting Officer’s Representative (PM/COR): The Government PM or COR will sign and date the very last block on the C&D form as review and acceptance (quality assurance) of the Contractor's submittal.

Government Shop Supervisor: The Shop Supervisor or equivalent will sign and date the very last block on the C&D form as review and verification (quality control) of the submitted data.

Note: Reports that are not signed by a government representative will not be accepted, contractors shall only submit reports to PM/COR.

HJB Form 229 Instructions 2 Rev 2: 6/1/2015

Diversion Disposal Data

Quarterly reports for the following categories;

a. Asphalt / Brick / Concrete: Report all diverted asphalt, brick and concrete in tons.

Includes: Concrete Block Unit Stone, and other C&D masonry/asphalt. List the top three destinations (site or company name) where this material was hauled.

b. Land Clearing: Report all diverted Land Clearing Debris in tons. Includes: rocks, soil, vegetation / timber (tree trunks and limbs) and other Land Clearing Debris.

List the top three destinations (site or company name) where this material was hauled.

c. Metal: Report all diverted Metal in tons. Includes: aluminum, copper, mixed metal, steel, and other C&D Metal. List the top three destinations (site or company name) where this material was hauled.

d. Other Recyclables: Report all diverted source-separated or commingled recyclables in tons that are not included in other recycling categories. List the top three destinations (site or company name) where this material was hauled.

e. Specialty Materials: Report all diverted Specialty Materials in tons. Includes:

ceiling tile, composition roof, doors, windows, stairs, cabinets, glass, gypsum/plaster, insulation, paper, plastic, and siding. List the top three destinations (site or company name) where this material was hauled.

f. Wood: Report all diverted Wood in tons. Includes: finished, structural, treated, and other C&D Wood. List the top three destinations (site or company name) where this material was hauled.

g. Disposal: Report all land filled tonnages. Includes the land filling or incineration of

C&D waste not otherwise divertible/recyclable. List the top three destinations (site or company name) where this material was hauled. If nothing is landfilled, write “None” in this column.

The C&D Diversion - Disposal Transaction Report Summary (HJB Form 229) is available for download from the Public Works Design Standards website:

http://www.lewis-mcchord.army.mil/designstandards/pdf/0229_Construction_And_ Demolition_Disposal_Transaction.pdf

Please submit completed reports by email to the COR/PM (contract work) or Shop Supervisor (government work) by the submittal deadline reflected in paragraph 5 above.

http://www.lewis-mcchord.army.mil/designstandards/pdf/0229_Construction_And_Demolition_Disposal_Transaction.pdf

File details come from the government source that posted it. Updated .