Appendix I - Proposal Tech Review.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Protective Coatings
Solicitation number
W911S820B0002
Issued by

About this file

This spreadsheet template is for tracking and resolving issues related to a protective coatings contract proposal. It includes columns for listing line items from the contractor's proposal that are contentious, issues to be addressed, responses from both the contractor and government, and whether items require further negotiation. Added sections capture any line items the contractor included in a revised proposal in response to the technical review, along with government feedback and notes on needed negotiations. The spreadsheet aims to provide a reference to easily review discussions and justify revisions to the proposed work. It appears to support negotiations on a solicitation from the Department of the Army for a protective coatings contract at Joint Base Lewis-McChord, WA. The solicitation seeks a contractor to provide all labor, materials, equipment and management to complete a range of maintenance, repair and minor construction tasks involving protective coatings through the issuance of individual task orders over the contract period.

View the file

Other files

File Type Posted
Amendment W911S820B0002-0004.pdf PDF
Enclosure 1 - Government Responses v1 28April2020.pdf PDF
Attachment 6 - General Decision Number WA20200029 13MAR2020_Jefferson.pdf PDF
Attachment 4 - General Decision Number WA20200018 06MAR2020_Thurston.pdf PDF
Attachment 9 - Tech Spec 04 01 40 - Historic Structures.pdf PDF
Evaluation Factors for Award_20April2020.pdf PDF
Attachment 1 - Statement of Work_22April2020.pdf PDF
EXHIBITS AND ATTACHMENTS_22April2020.pdf PDF
Attachment 11 - Technical Specification 09 90 00 - Paint and Coatings.pdf PDF
Instuctions to Bidders_20April2020.pdf PDF
Attachment 10 - Technical Specification 09 67 23.13 - Standard Resinous Flooring.pdf PDF
Attachment 8 - Technical Specification 02 83 00 - Lead Remediation.pdf PDF
Attachment 3 - General Decision Number WA20200013 06MAR2020_Pierce.pdf PDF
Enclosure 1 - Government Responses.pdf PDF
Attachment 5 - General Decision Number WA20200020 13MAR2020_Yakima.pdf PDF
Attachment 7 - Technical Specification 02 82 14.00 10 - Asbestos Hazard Control Activities.pdf PDF
Amendment W911S820B0002-0003.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1_22April2020.xlsx XLSX spreadsheet
Amendment W911S820B0002-0002.pdf PDF
Amendment W911S820B0002-0001.pdf PDF
Appendix F - Sustainable Acquisition Exception Form - HJB 225.pdf PDF
Appendix A - AF Form 3065 Invoice.xls XLS spreadsheet
Appendix H - Task Order SOW.docx DOCX document
Appendix D - Eng Form 4025-R.pdf PDF
Appendix J - HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
Appendix J - HJB 229 Instructions.pdf PDF
Attachment 3 - General Decision Number WA20190013 22NOV2019_Pierce.pdf PDF
Appendix E - Daily Contract Inspection Report.pdf PDF
Appendix B - Project Schedule Example.xlsx XLSX spreadsheet
Invitation for Bid_W911S8-20-B-0002.pdf PDF
Appendix G - Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Appendix C - DA Form 5479 - CDR.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1.xlsx XLSX spreadsheet
Attachment 4 - General Decision Number WA20190018 22NOV2019_Thurston.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tech review

IJO # - Title of Project w/ Building Number
Technical Review of
Contractor ProposalDated _______
Government Representatives:Contractor Representatives:
DPW PM:__________PM:__________
MICC CA:__________
MICC KO:__________
ROW #Bid Item #Item DescriptionIssues of Contention of Contractor's Proposal dated ______KTRs Response to Tech Review dated _______Gov't Response to Revised Proposal dated _____.Neg?
Exterior Paint - Bldg XXXX
24Bulk Asbestos Removal, boiler insulation, incl. disp. Tools & 4 suits & resp./day/workerThis line item and explanation states that 50SF of boiler gaskets will be abated. Considering this is for the boiler gaskets contractor to verify 50SF of 3"-4" gaskets.Ex: re-examined site and QTY changed to 25SF.Ex: Gov't Concurs - change confirmed in revised proposal
47Bulk Asbestos Removal, pipe fitting insulation, up to 4" diameter pipe, incl.disp. Tools, & 4 suits & resp/day/worker.This line item is already accounted for in previous boiler gasket line item. Recommend removal of line item.Ex: believes this is the best fit line item for asbestos removalEx: Gov't disagrees - this line item for insulation, not gaskets - request negotiations over line item.

Instructions:

Column A: The row number, based off the contractor's proposal(PDF version), in which the contentious line item is located.

Column B: The Bid Item from Technical Exhbiit #1

Column C: The line item description as it appears in RS Means.

Column D: The specific issue with the contentious line item for the contractor to comment on.

Column E: This will be left blank for the contractor to fill out in response to the government's comments in Column E.

Column F : This column will be filled out by the Government upon receipt of the Contractor's response to the Government's Comments in Column E

Column G: This column will be filled out in conjunction with the Government's comments in Column G; This will dictate what, if anything, needs to be negotiated; notated with a "Y" corresponding to the need to negotiated or an "N" corresponding to the acceptance of the line item revision.

You may label different section corresponding to the Contractor's proposal or keep all together - prerogative of Project Manager

All highlighted cells require input and removal of highlights

Note: The intent of this document is to create areference where at any point MICC & DPW can go back and look through what was discussed and the justification for what and why something was added, removed, or kept as is.

Example verbiage added to columns in RED.

**This instruction text box should be deleted before being sent to Contracting**

Contractor Added Line Items Contractor added Items for Revised Proposal dated _______

ROW # Bid Item # Item Description Justication for Add - Contractor's Revised Proposal dated _________ Gov't Response to Added Items Neg?

Instructions:

This page is added to the spreadsheet for the contractor to add in what they have added in their proposal due to the tech review. This is to allow the tracking of any changes to any sections of the propsal.

Columns A-D: These columns will be filled out by the contractor to correspond to any added proposal line items.

Columns E: The government shall fill out this column with their response to the Contractor's added line items.

Column F: This column will be filled out in conjunction with the Government's comments in Column G; This will dictate what, if anything, needs to be negotiated; notated with a "Y" corresponding to the need to negotiated or a "N" corresponding to the acceptance of the line item revision.

Note: The intent of this spreadsheet is to capture any contractor-added line items to expedite the review of the revised proposal. Example verbiage added to columns in RED.

**This instruction text box should be deleted before being sent to Contracting**

File details come from the government source that posted it. Updated .