Appendix E - Daily Contract Inspection Report.pdf

PDF 222 KB Posted

Attached to
Protective Coatings
Solicitation number
W911S820B0002
Issued by

About this file

The document contains a daily contract inspection report template for use on a protective coatings contract. The template requires reporting of contract details including number, specifications, name, contractor, dates, weather, work descriptions and locations, personnel and equipment on site, instructions, difficulties encountered, safety observations, percent and date of completion, and signatures. It also contains guidance to print the completed form to a non-fillable PDF before sending to the government quality assurance representative.

A related federal contract opportunity provides information on a solicitation for protective coatings work at Joint Base Lewis-McChord and supported satellites in Washington. Under the contract, the Army Materiel Command Mission and Installation Contracting Command will issue task orders to the contractor as needed for a range of maintenance, repair, and minor construction work involving protective coatings applications. The contractor must furnish all materials, equipment, and personnel to manage and accomplish the required performance.

View the file

Other files

File Type Posted
Amendment W911S820B0002-0004.pdf PDF
Enclosure 1 - Government Responses v1 28April2020.pdf PDF
Instuctions to Bidders_20April2020.pdf PDF
Attachment 10 - Technical Specification 09 67 23.13 - Standard Resinous Flooring.pdf PDF
Attachment 8 - Technical Specification 02 83 00 - Lead Remediation.pdf PDF
Attachment 3 - General Decision Number WA20200013 06MAR2020_Pierce.pdf PDF
Enclosure 1 - Government Responses.pdf PDF
Attachment 5 - General Decision Number WA20200020 13MAR2020_Yakima.pdf PDF
Attachment 7 - Technical Specification 02 82 14.00 10 - Asbestos Hazard Control Activities.pdf PDF
Attachment 4 - General Decision Number WA20200018 06MAR2020_Thurston.pdf PDF
Attachment 9 - Tech Spec 04 01 40 - Historic Structures.pdf PDF
Evaluation Factors for Award_20April2020.pdf PDF
Attachment 1 - Statement of Work_22April2020.pdf PDF
EXHIBITS AND ATTACHMENTS_22April2020.pdf PDF
Attachment 11 - Technical Specification 09 90 00 - Paint and Coatings.pdf PDF
Attachment 6 - General Decision Number WA20200029 13MAR2020_Jefferson.pdf PDF
Amendment W911S820B0002-0003.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1_22April2020.xlsx XLSX spreadsheet
Amendment W911S820B0002-0002.pdf PDF
Amendment W911S820B0002-0001.pdf PDF
Appendix B - Project Schedule Example.xlsx XLSX spreadsheet
Appendix H - Task Order SOW.docx DOCX document
Appendix I - Proposal Tech Review.xlsx XLSX spreadsheet
Appendix D - Eng Form 4025-R.pdf PDF
Appendix J - HJB-229 Construction And Demolition Disposal Transaction.pdf PDF
Appendix J - HJB 229 Instructions.pdf PDF
Attachment 3 - General Decision Number WA20190013 22NOV2019_Pierce.pdf PDF
Appendix F - Sustainable Acquisition Exception Form - HJB 225.pdf PDF
Appendix A - AF Form 3065 Invoice.xls XLS spreadsheet
Invitation for Bid_W911S8-20-B-0002.pdf PDF
Appendix G - Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Appendix C - DA Form 5479 - CDR.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1.xlsx XLSX spreadsheet
Attachment 4 - General Decision Number WA20190018 22NOV2019_Thurston.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DAILY CONTRACT INSPECTION REPORT

1. CONTRACT NUMBER

2. SPECIFICATION NUMBER

Task Order #

5. NOTICE TO PROCEED DATE

6. ACTUAL DATE STARTED

Company #Emp Trade Total Hours

Equipment Data O / R Hours Used Hours Standby HRS THIS DATE

PREVIOUS HRS

TOTAL HOURS

8b. NUMBER OF WORKERS ON JOB

11.GOVERNMENT REPRESENTATIVE COMMENTS (comments to items 8,9, and 10) Was site inspection performed of any work? Date of inspection.________________ No NA

13. CONTRACT COMPLETION DATE

19. DATE OF REPORT (S)

REV. 11-22-05

AM

Work Performed

14. PERCENT COMPLETE

8c. NAME OF CONTRACTOR'S REPRESENTATIVE

15. QUALITY CONTROL SIGNATURE AND DATE

(i.e. materials received, off site activities, three phase meetings-inspections) 9. CONTRACTOR INSTRUCTIONS GIVEN/RECEIVED

12. SAFETY OBSERVATIONS

Contractor Verification: The above report is complete and correct. All material, equipment used, and work performed

16. QUALITY ASSURANCE SIGNATURE AND DATE

during this reporting period are in compliance with the contract documents except as noted above.

10. CONTRACTOR DESCRIBE DIFFICULTIES ENCOUNTERED (INCLUDE DELAYS, DESCRIBE WORK NOT PERFORMED IN ACCORDANCE WITH SPECIFICATIONS, CORRECTIVE ACTIONS Etc.)

17. PROJECT MANAGER REVIEW

18. CONTRACTING ADMINISTRATOR'S SIGNATURE AND DATE 20. REPORT SERIAL NUMBER

4. NAME OF CONTRACTOR (COMPANY NAME)

7. WEATHER AND TEMPERATURE

8a. CONTRACTOR DESCRIBE WORK BEING PERFORMED (INCLUDE LOCATION OF WORK)

PM

3. ABBREVIATED CONTRACT NAME

Block 1 Government contract number (Stays the same for all remaining reports).

Block 2 Government Task Order number (Stays the same for all remaining reports).

Block 3 Contract name (shorten with abbreviations if needed and Stays the same for all remaining reports).

Block 4 General Contractor Name (Stays the same for all remaining reports).

Block 5 Notice to proceed date (Stays the same for all remaining reports).

Block 6 should stay blank until the first day of site work then that date (Stays the same for all remaining reports).

Block 7 add approximate temp to description and you are good, nothing needed on no work days unless the weather is the cause for the no work.

Blocks 8a – 8c covers Number of workers and company they work for, plus equipment on site and hours, (note check your contract and umbrella contract for required information).

Block 11 is for government comments.

Block 12 I think you understand.

Block 13 is the Legal completion date for the contract, and can change if there is an extension to the contract by the contracting officer.

Block 14 percent complete based on entire contract; please note contracts can have multiple jobs (Contract Line Item Number, CLIN percentage is based on entire task order).

Block 15 is your QC signature (who checks them and sends them to the Government QAR, please check them completely to avoid revised reports).

Blocks 16-18 is for government use.

Block 19 is the date of the report being filed.

Block 20 is the serial number of the reports for the project.

peter.subitch Typewritten Text When completed print to a PDF prior to sending the daily to your QAR and only send the now non-fillable version.

peter.subitch Typewritten Text

PWDAYL

1 CONTRACT NUMBERRow1:
2 SPECIFICATION NUMBER:
Task Order:
3 ABBREVIATED CONTRACT NAMERow1:
4 NAME OF CONTRACTOR COMPANY NAMERow1:
7 WEATHER AND TEMPERATURE:
5 NOTICE TO PROCEED DATERow1:
6 ACTUAL DATE STARTEDRow1:
AM:
PM:
8a CONTRACTOR DESCRIBE WORK BEING PERFORMED INCLUDE LOCATION OF WORK:
CompanyRow1:
EmpRow1:
TradeRow1:
Total HoursRow1:
Work PerformedRow1:
CompanyRow2:
EmpRow2:
TradeRow2:
Total HoursRow2:
Work PerformedRow2:
CompanyRow3:
EmpRow3:
TradeRow3:
Total HoursRow3:
Work PerformedRow3:
CompanyRow4:
EmpRow4:
TradeRow4:
Total HoursRow4:
Work PerformedRow4:
CompanyRow5:
EmpRow5:
TradeRow5:
Total HoursRow5:
Work PerformedRow5:
CompanyRow6:
EmpRow6:
TradeRow6:
Total HoursRow6:
Work PerformedRow6:
CompanyRow7:
EmpRow7:
TradeRow7:
Total HoursRow7:
Work PerformedRow7:
CompanyRow8:
EmpRow8:
TradeRow8:
Total HoursRow8:
Work PerformedRow8:
CompanyRow9:
EmpRow9:
TradeRow9:
Total HoursRow9:
Work PerformedRow9:
CompanyRow10:
EmpRow10:
TradeRow10:
Total HoursRow10:
Work PerformedRow10:
CompanyRow11:
EmpRow11:
TradeRow11:
Total HoursRow11:
Work PerformedRow11:
Work PerformedHours Standby:
Equipment DataRow1:
O RRow1:
Hours UsedRow1:
Hours StandbyRow1:
Work PerformedRow13:
Equipment DataRow2:
O RRow2:
Hours UsedRow2:
Hours StandbyRow2:
Work PerformedRow14:
Equipment DataRow3:
O RRow3:
Hours UsedRow3:
Hours StandbyRow3:
Equipment DataRow4:
O RRow4:
Hours UsedRow4:
Hours StandbyRow4:
8b NUMBER OF WORKERS ON JOBRow1:
8c NAME OF CONTRACTOR S REPRESENTATIVERow1:
ie materials received off site activities three phase meetingsinspections 9 CONTRACTOR INSTRUCTIONS GIVENRECEIVEDRow1:
10 CONTRACTOR DESCRIBE DIFFICULTIES ENCOUNTERED INCLUDE DELAYS DESCRIBE WORK NOT PERFORMED IN ACCORDANCE WITH SPECIFICATIONS CORRECTIVE ACTIONS EtcRow1:
11GOVERNMENT REPRESENTATIVE COMMENTS comments to items 89 and 10 Was site inspection performed of any work Date of inspection No NA:
Date of inspection:
undefined: Off
No: Off
NA: Off
12 SAFETY OBSERVATIONS Contractor Verification The above report is complete and correct All material equipment used and work performed during this reporting period are in compliance with the contract documents except as noted above:
13 CONTRACT COMPLETION DATERow1:
14 PERCENT COMPLETERow1:
15 QUALITY CONTROL SIGNATURE AND DATERow1:
16 QUALITY ASSURANCE SIGNATURE AND DATE:
17 PROJECT MANAGER REVIEW:
18 CONTRACTING ADMINISTRATORS SIGNATURE AND DATERow1:
19 DATE OF REPORT SRow1:
20 REPORT SERIAL NUMBERRow1:

File details come from the government source that posted it. Updated .