Appendix G - Eng Form 4288 Submittal Register.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Protective Coatings
- Solicitation number
- W911S820B0002
About this file
This document contains a submittal register for a protective coatings contract at Joint Base Lewis-McChord in Washington. The register outlines various pre-construction submittals required from the contractor, including a list of personnel, submittal register, accident prevention plan, activity hazard analysis, quality control plan, waste management plan, hazardous waste management plan, environmental protection plan, and work plan. It requires the contractor to submit electronic copies of these documents prior to beginning work for review and approval by the government. The related federal contract opportunity is solicitation number W911S820B0002 for protective coatings work at JBLM and supported satellites. The contractor will be required to provide all materials, equipment, and personnel to complete various protective coatings applications on a task order basis, with task orders varying in size and potentially including other incidental disciplines.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| ENG FORM 4288 SUBMITTAL REGISTER | |||
| (ER 415-1-10) | TBD | ||
| TITLE AND LOCATION | |||
| Protective Coatings, JBLM, WA | CONTRACTOR |
TBD
| TYPE OF SUBMITTAL | CLASSI - | ||||||||||||||||||||||||||
| FICATION | CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | GOVERNMENT ACTION | ||||||||||||||||||||||||
| TRANS MITTAL NO | ITEM NO | SPECIFICATION SECTION NUMBER | SECTION PARAGRAPH NUMBER | DESCRIPTION OF ITEM SUBMITTED | DATA | DRAWINGS | INSTRUCTIONS | SCHEDULES | STATEMENTS | REPORTS | CERTIFICATES | SAMPLES | RECORDS | INFORMATION ONLY | GOVERNMENT APPROVED | REVIEWER | SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | CODE | DATE | SUBMIT TO GOVERNMENT | CODE | DATE | REMARKS | ||
| PRE-CONSTRUCTION SUBMITTALS | All pre-construction submittals must be approved before the start of work. | ||||||||||||||||||||||||||
| LIST OF ALL CONTRACTOR PERSONNEL (INCLUDES ALL SUBCONTRACTORS) | X | X | Submit one electronic copy; after approval, include in QC plan. | ||||||||||||||||||||||||
| SUBMITTAL REGISTER | X | X | Submit one electronic copy (to be updated per task order). | ||||||||||||||||||||||||
| ACCIDENT PREVENTION PLAN (SAFETY PLAN) | X | X | Included with base contract submittals, amend per TO. (Site specific) | ||||||||||||||||||||||||
| ACTIVITY HAZARD ANALYSIS (SAFETY/HEALTH PLAN) | X | X | Included with base contract submittals, amend per TO. (Site specific) | ||||||||||||||||||||||||
| QUALITY CONTROL PLAN | X | X | Included with base contract submittals, amend per TO. (Site specific) | ||||||||||||||||||||||||
| WASTE MANAGEMENT PLAN | X | X | Submit one electronic copy; includes all recycled materials, solid waste, etc. May be included with EPP. | ||||||||||||||||||||||||
| HAZARDOUS WASTE MANAGEMENT PLAN | X | X | Submit one electronic copy for approval. If there are not any hazardous chemicals or solvents, then submit a letter to that effect. May be included |
with EPP.
| ENVIRONMENTAL PROTECTION PLAN | X | X | Included with base contract submittals, amend per TO. (Site specific) |
| WORK PLAN | X | X | Submit one electronic copy per task order. |
File details come from the government source that posted it. Updated .