Appendix J - HJB-229 Construction And Demolition Disposal Transaction.pdf

PDF 232 KB Posted

Attached to
Protective Coatings
Solicitation number
W911S820B0002
Issued by

About this file

This document contains a construction and demolition disposal transaction report template. The template requires reporting of C&D materials diverted from landfills and disposed of in tons on a quarterly basis, including categories such as asphalt, brick, concrete, land clearing debris, metal, wood, and other recyclables. It provides Department of Defense and Army sustainability diversion rate targets through 2020. Contractors must submit completed reports to the contracting officer's representative, and government personnel must submit to supervisors who then report to the Directorate of Public Works Environmental division.

The second document is a solicitation for a protective coatings contract at Joint Base Lewis-McChord in Washington state. The contractor will be required to provide all labor, equipment, materials except as specified, and perform maintenance, repair, and minor construction work involving various protective coatings applications. The government will issue individual task orders which the contractor must complete, furnishing all required resources. Task orders will vary in size and disciplines. The period of performance and response date are not specified.

View the file

Other files

File Type Posted
Amendment W911S820B0002-0004.pdf PDF
Enclosure 1 - Government Responses v1 28April2020.pdf PDF
Attachment 6 - General Decision Number WA20200029 13MAR2020_Jefferson.pdf PDF
Attachment 4 - General Decision Number WA20200018 06MAR2020_Thurston.pdf PDF
Attachment 9 - Tech Spec 04 01 40 - Historic Structures.pdf PDF
Evaluation Factors for Award_20April2020.pdf PDF
Attachment 1 - Statement of Work_22April2020.pdf PDF
EXHIBITS AND ATTACHMENTS_22April2020.pdf PDF
Attachment 11 - Technical Specification 09 90 00 - Paint and Coatings.pdf PDF
Instuctions to Bidders_20April2020.pdf PDF
Attachment 10 - Technical Specification 09 67 23.13 - Standard Resinous Flooring.pdf PDF
Attachment 8 - Technical Specification 02 83 00 - Lead Remediation.pdf PDF
Attachment 3 - General Decision Number WA20200013 06MAR2020_Pierce.pdf PDF
Enclosure 1 - Government Responses.pdf PDF
Attachment 5 - General Decision Number WA20200020 13MAR2020_Yakima.pdf PDF
Attachment 7 - Technical Specification 02 82 14.00 10 - Asbestos Hazard Control Activities.pdf PDF
Amendment W911S820B0002-0003.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1_22April2020.xlsx XLSX spreadsheet
Amendment W911S820B0002-0002.pdf PDF
Amendment W911S820B0002-0001.pdf PDF
Appendix F - Sustainable Acquisition Exception Form - HJB 225.pdf PDF
Appendix A - AF Form 3065 Invoice.xls XLS spreadsheet
Appendix H - Task Order SOW.docx DOCX document
Appendix I - Proposal Tech Review.xlsx XLSX spreadsheet
Appendix D - Eng Form 4025-R.pdf PDF
Appendix J - HJB 229 Instructions.pdf PDF
Attachment 3 - General Decision Number WA20190013 22NOV2019_Pierce.pdf PDF
Appendix E - Daily Contract Inspection Report.pdf PDF
Appendix B - Project Schedule Example.xlsx XLSX spreadsheet
Invitation for Bid_W911S8-20-B-0002.pdf PDF
Appendix G - Eng Form 4288 Submittal Register.xlsx XLSX spreadsheet
Appendix C - DA Form 5479 - CDR.pdf PDF
Attachment 1 - Statement of Work.pdf PDF
Attachment 2 - Price List-Technical Exhibit 1.xlsx XLSX spreadsheet
Attachment 4 - General Decision Number WA20190018 22NOV2019_Thurston.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

Construction and Demolition (C&D) Diversion / Disposal Transaction Report Summary Project Information Diversion and Disposal Data Enter data for each destination IN TONS. Attach additional sheets if more room is required. All reports must include landfill tons or provide justification for not supplying data. Likewise, submission of blank forms must be justified (e.g., "no activity for quarter.") Asphalt Brick Concrete (see note 3) Land Clearing (see note 4) Metal (see note 5) Other Recyclable (see note 6) Specialty Materials (see note 7) Wood (see note 8) Disposal (see note 9) 1st

QTR

(see note 2) 2nd

QTR

(see note 2) 3rd

QTR

(see note 2) 4th

QTR

(see note 2) Contractors: Submit completed form and supporting information to the COR or Government Project Manager.

Government Construction / O&M Personnel: Submit completed form and supporting information to your Shop Supervisor or equivalent.

PM / COR and Shop Supervisors: Submit completed form to usarmy.jblm.imcom.list.dpw-cd-reporting@mail.mil.

1. C&D materials are those generated by construction, renovation, repair, and demolition activities. 2. Destination is the name of the facility to which C&D materials were transported. 3. Asphalt/Brick/Concrete includes diverted concrete masonry units and other C&D masonry/asphalt. 4. Land Clearing includes diverted rocks, soil, vegetation/timber (trunks and limbs), and other land clearing debris. 5. Metal includes diverted aluminum, copper, mixed metal, steel and other C&D metal. 6. Other Recyclables include diverted source separated or commingled recyclables that are not included in other recycling categories. 7. Specialty Materials include diverted ceiling tile, composition roofing, doors, windows, stairs, cabinets, glass, gypsum/plaster, insulation, paper, plastic and siding. 8. Wood includes diverted finished, structural, treated, and other C&D wood. 9. Disposal includes any C&D waste that is landfilled or incinerated. If no quantities were disposed during the quarter or project duration, indicate "NONE" in this column. IMCOM Net Zero Waste Diversion Rates: 56% (2013), 58% (2014), 60% (2015), 68% (2016), 76% (2017), 84% (2018), 92% (2019), 100% (2020).

HJB Form 229, May 2015 Directorate of Public Works, Environmental (IMLM-PWE) Previous Editions Are Obsolete Adobe LiveCycle Designer ES3 v10.0.2 9.0.0.2.20120627.2.874785

CalendarYearBeingReported:
ProjectNumber:
Contract-TaskorWork-ServiceOrderNumber:
ProjectName-SiteLocation:
ContractororOrganizationalSignature:
ContractororOrganizationalDate:
PM-CORorShopSupervisorSignature:
PM-CORorShopSupervisorDate:
Destination:
AsphaltBrickConcrete:
LandClearing:
Metal:
OtherRecyclable:
SpecialtyMaterials:
Wood:
Disposal:
SubmittoDPW:
SaveButton:
PrintButton:

File details come from the government source that posted it. Updated .