This is an Addendum to construction contract documents for Project 518-22-700 Bedford EHRM, issued by Triple C – The A&E Group on April 13, 2026. The addendum clarifies the electrical metering scope in response to six technical questions posed during the bidding process.
The key clarifications address metering requirements, specifications, and system integration. All Uninterruptible Power Supplies (UPS) and Power Distribution Units (PDU) provided under the contract must include monitoring and metering capabilities. The new Main Control Room (MCR) Main Distribution Panel (MDP) requires metering for four circuits: Control Room (CR), Load Shedding (LS), Equipment (EQ), and Network Protection (NP). Meter specifications are referenced in sections 23 09 23, 25 10 10 Part 2.6, 26 26 00, 26 33 53.10, and 27 11 26. The head-end server shall be located in the MCR with local LAN connections at each Transformer Room (TR) and the MCR. Data collection requirements are detailed in Specification 25 10 10 Part 2.6.D, 26 26 00, 26 33 53.10, and 27 11 26. The addendum also includes a complete revised specification book incorporating previous addenda (1, 2, 3) with numerous specification section changes, primarily updates to align with Technical Information Letter (TIL) 04-2026, plus removal of steam and water metering requirements from Section 25 10 10. No drawing changes were made.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRIPLE C – THE A&E GROUP
OUR REASONABLE SERVICE - TO PROVIDE YOU WITH EXEMPLARY SERVICE
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
ADDENDUM-04
Project: 518-22-700 Bedford EHRM
Date: 04/13/2026
Summary of Clarifications
Triple C has revised the final construction drawing documents for project 518-22-700, per request of the VA. See the following responses to Technical Questions regarding electrical metering scope:
1. “Where would we find the number of meters required for installation.”
1. All UPS and PDU provided on this contract shall be monitored/metered.
2. New MCR MDP shall be metered (CR, LS, EQ and NP)
2. “Please provide the specification on the selected meters.”
1. See Specifications 23 09 23, 25 10 10 - Part 2.6, 26 26 00, 26 33 53.10, and 27 11 26.
2. Added Specification 26 33 53.10 to Addendum 4
3. “Please provide the locations of said meters.”
1. See response to number 1, clarified in Addendum 4
4. “Please provide the location of the central equipment.”
1. Head-end server shall be located in MCR
5. “Please provide the connection location to the VA’s LAN.”
1. Connect locally at each TR and the MCR.
6. “Please provide the required data each meter is to collect.”
1. See Specification 25 10 10 – Part 2.6.D, 26 26 00, 26 33 53.10, and 27 11 26
CVE Verified Service-Disabled Veteran-Owned Small Business
TRIPLE C – THE A&E GROUP
OUR REASONABLE SERVICE - TO PROVIDE YOU WITH EXEMPLARY SERVICE
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Specifications:
A new complete specification book has been printed combining previous revisions from Addenda 1, 2, 3 and the following changes:
SECTION DESCRIPTION OF/REASON FOR CHANGE
25 10 10 Removed steam and water metering requirements.
26 33 53.10 Added new specification.
27 05 00 Added new specification published on the TIL 04-2026.
27 05 26 Replaced specification with new version published on the TIL 04-2026.
27 05 33 Replaced specification with new version published on the TIL 04-2026.
27 05 36 Replaced specification with new version published on the TIL 04-2026.
27 05 53 Replaced specification with new version published on the TIL 04-2026.
27 10 00 Replaced specification with new version published on the TIL 04-2026.
27 10 00.1 Removed specification.
27 11 00 Removed specification.
27 11 16 Replaced specification with new version published on the TIL 04-2026.
27 11 19 Replaced specification with new version published on the TIL 04-2026.
27 11 26 Replaced specification with new version published on the TIL 04-2026.
27 13 13 Replaced specification with new version published on the TIL 04-2026.
27 13 13.13 Replaced specification with new version published on the TIL 04-2026.
27 13 23 Replaced specification with new version published on the TIL 04-2026.
27 15 13 Replaced specification with new version published on the TIL 04-2026.
27 16 19 Replaced specification with new version published on the TIL 04-2026.
Drawing Changes: NONE