Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf

PDF 2 MB Posted

Attached to
Y1DA--518-22-700 EHRM Infrastructure Upgrades Construction Bedford VAMC
Solicitation number
36C77626R0003
Issued by

About this file

This is an architectural drawing set for interior construction work at the Edith Nourse Memorial Veterans Hospital in Bedford, Massachusetts. The project, titled EHRM Infrastructure Upgrades (Project Number 518-22-700), involves modifications to basement-level office spaces, specifically Room B23 (EEO Manager Office) and associated areas.

The work scope includes demolition of existing walls and doors, installation of new 45-minute fire-rated hollow metal doors and frames, partition modifications with specified fire and smoke ratings, and interior finish work. Interior finishes specify California Paints matched to Benjamin Moore colors: Manchester Tan HC-81 (P-1, eggshell) for walls and White Down OC-131 (P-2, semi-gloss) for metal doors and trim. The contractor is responsible for moving, storing, and returning furnishings and equipment, including disassembly and reassembly of systems furniture per manufacturer specifications. The drawing set includes floor plans, reflected ceiling plans, door and frame schedules, access door specifications, and detailed elevations. Key contractor responsibilities include field verification of all dimensions, temporary dust barriers during work, potential asbestos abatement at floor penetrations, new wall base installation, and protection of existing ceilings and mechanical/electrical systems. The document is issued for construction with an issue date of June 4, 2025, and includes Addendum 1 dated February 25, 2026. The Architect/Engineer of Record is TRIPLE C - The A/E Group, Hartford, Connecticut.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

C. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

D. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

33A-400

B8

EEO MGR

OFFICE

B23B23

33A-400

F5

ASST

FINANCIAL

OFFICER

B30B30

CORRIDOR

B06B06

EEO MGR

OFFICE

B23B23

CORRIDOR

B06B06

EEO MGR

OFFICE

B23B23

B

H W

-S H

-3 F

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

E4

TYPICAL FRAME

H E

IG

H

T

2" WIDTH 2"

E6

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

EEO MGR

OFFICE

B23B23 4

EEO MGR

OFFICE

B23B23

2'-4"

1' -3

ASST

FINANCIAL

OFFICER

B30B30

J2 J

8 9

1'-0"

10 11

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:4

:0

A

M

33A-400

ARCHITECTURAL ENLARGED VIEWS & INTERIOR

FINISH SCHEDULE

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

NTS

D2

COLOR BOARD

1 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA

DURING ACTIVITIES WHICH PRODUCE DUST

2 REMOVED EXISTING DOOR AND FRAME

3 NEW 45 MIN. FIRE RATED DOOR. SEE DOOR SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY DOOR AS

REQUIRED FOR NEW ACCESS CONTROL HARDWARE.

4 EXISTING CEILING TO REMAIN

5 REMOVE EXISTING WALL CABINET. VERIFY WITH COR IF CABINET

SHALL BE SALVAGED.

6 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

7 ACCESS DOOR PER SPECIFICATION, COR TO CONFIRM LOCATION

AND MOUNTING HEIGHT.

8 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL IN

ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN OR

APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE COR.

OR CAMPUS INTERIOR DESIGNER.

9 EXISTING ROOMS TO BE VACATED PRIOR TO WORK. EXISTING

EQUIPMENT TO BE REMOVED FROM SPACE PRIOR TO DEMO. VA TO

COORDINATE.

10 EXISTING CEILING AND LIGHTS TO REMAIN. PROTECT IN PLACE.

MODIFY AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR

EXISTING CEILING ITEMS TO REMAIN.

11 REPAIR EXISTING FLOORING AS NEEDED FOR NEW WALL

INSTALLATION. MATCH PAINT AND WALL BASE TO EXISTING.

1/16" = 1'-0" F8

BASEMENT LEVEL REFERENCE PLAN

1/4" = 1'-0" D8

ARCHITECTURAL FLOOR PLAN - BASEMENT

LEVEL - RM B23 - DEMO

1/4" = 1'-0" B8

ARCHITECTURAL FLOOR PLAN - BASEMENT

LEVEL - RM B23 - NEW

NOT TO SCALE

D4

BASEMENT LEVEL EXISTING RM B23

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB GROUP ELECTRICAL

BASEMENT B23 EEO MGR OFFICE B23 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 E4/ 33A-400 E6/ 33A-400 45 MIN. HW-SH-3F SEE SPEC 1

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

BASEMENT B23 EEO MGR OFFICE EXISTING EXISTING GWB EXISTING GWB EXISTING GWB EXISTING GWB EXISTING EXISTING REPAIR EXISTING FINISHES AS NEEDED FOR NEW DOOR INSTALLATION.

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

P-1 PAINT CALIFORNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

*Materials are approved as basis of design, all material substitutions are subject to owner approval. Contractor to provide VA Interior Design Department with samples of all specified finish materials. VA COR/ Interior Design department shall approve all finishes prior to installation.

1/4" = 1'-0" E2

DOOR AND FRAME TYPES ELEVATIONS

3" = 1'-0"

E4

HOLLOW METAL HEAD DETAIL

3" = 1'-0" E6

HOLLOW METAL JAMB DETAIL

1/4" = 1'-0" D6

ARCHITECTURAL REFLECTED CEILING PLAN -

BASEMENT LEVEL - RM B23 - DEMO

1/4" = 1'-0" B6

ARCHITECTURAL REFLECTED CEILING PLAN -

BASEMENT LEVEL - RM B23 - NEW

1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

3/4" = 1'-0" F5

BASEMENT LEVEL CHASE - ASST FINANCIAL OFFICER - ROOM B30

ACCESS DOOR SCHEDULE

LEVEL ROOM NAME ROOM NUMBER DESCRIPTION TYPE

BASEMENT ASST FINANCIAL

OFFICER

B30 Drywall Access Door Removable Door - Screwdriver Cam Latch 1'

Number Revisions: Date:

1 Addendum 1 02/25/2026

02/25/2026

Sheets
33A-400 - ARCHITECTURAL ENLARGED VIEWS & INTERIOR FINISH SCHEDULE