Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf

PDF 1 MB Posted

Attached to
Y1DA--518-22-700 EHRM Infrastructure Upgrades Construction Bedford VAMC
Solicitation number
36C77626R0003
Issued by

About this file

This is an architectural drawing set for interior construction modifications at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts, as part of the EHRM Infrastructure Upgrades project (Project Number 518-22-700). The drawings were issued for construction on June 4, 2025, with Addendum 1 dated February 25, 2026, and prepared by TRIPLE C - The A/E Group.

The project involves renovation of Room 107 on the first level, including demolition of existing construction and installation of new 45-minute fire-rated hollow metal doors and frames with specific hardware requirements. The work includes three door installations (numbers 778, 779, and 780) in offices 107A, 107 (CWT), and 107F respectively, all measuring 3 feet by 7 feet by 1 3/4 inches thick. Interior finishes specify California Paints in two colors: Manchester Tan HC-81 (P-1) for field walls and White Down OC-131 (P-2) for metal doors and trim, matching existing Benjamin Moore campus colors. The contractor is responsible for all costs associated with moving, storing, and returning furnishings and equipment, including disassembly and reassembly of systems furniture in accordance with manufacturer warranties. Contractors must field-verify all dimensions and site-specific conditions at the time of bidding and coordinate door and frame installations with access control hardware and electrical systems per specification section 08 71 00. Work areas require temporary dust-tight barriers during dust-producing activities.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

UP

UP

UP

UPUP

UPUP

UPUP

UP

UP

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

C. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

D. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

F5

TYPICAL FRAME

H E

IG

H

T

2" WIDTH 2"

F3

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

CWT

OFFICE

107107

BCHGA-401

C7

OFFICE

107A107A

CWT

OFFICE

229 SF

TOILET

107B107B

OFFICE

107C107C

OFFICE

107F107F

CWT MAIN

OFFICE

106106

1 4

OFFICE

107A107A

CWT

OFFICE

229 SF

TOILET

107B107B

OFFICE

107C107C

OFFICE

107F107F

CWT MAIN

OFFICE

106106

H W

-S H

-3 F

HW-SH-3F

H W

-S H

-3 F

OFFICE

107F107F

OFFICE

107C107C

CWT

OFFICE

107107

TOILET

107B107B

OFFICE

107A107A

OFFICE

107A107A

CWT

OFFICE

107107TOILET

107B107B

OFFICE

107C107C

OFFICE

107F107F

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

C H

R

.r v t

/2

/2

:4

:5

P

M

BCHGA-401

ARCHITECTURAL ENLARGED VIEWS - FIRST

LEVEL

518-22-700

CH

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

15 Veterans Way, Lowell, MA 01852

3" = 1'-0" F5

HOLLOW METAL HEAD DETAIL

3" = 1'-0"

F3

HOLLOW METAL JAMB DETAIL

1/4" = 1'-0" F1

DOOR AND FRAME TYPES ELEVATIONS

1/32" = 1'-0"

F7

FIRST FLOOR PLAN - REFERENCE PLAN

1/8" = 1'-0" E7

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 107 - DEMO

1/8" = 1'-0" C7

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 107 - NEW

1/8" = 1'-0"

C5

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - RM 1017 - NEW

1/8" = 1'-0" E5

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - RM 1017 - DEMO

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

P-1 PAINT CALIFIRNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

LEVEL 1 107 CWT OFFICE EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING REPAIR EXISTING FINISHES AS NEEDED FOR

NEW DOOR INSTALLATION.

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL

LEVEL 1 107A OFFICE 778 3' - 0" 7' - 0" 1 3/4" F HM HM NONE HM P-2 F5/BCHA-401 F3/BCHGA-401 - 45 MIN HW-SH-3F SEE SPEC 1

LEVEL 1 107 CWT OFFICE 779 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE HM P-2 F5/BCHA-401 F3/BCHGA-401 - 45 MIN HW-SH-3F SEE SPEC 1

LEVEL 1 107F OFFICE 780 3' - 0" 7' - 0" 1 3/4" F HM HM NONE HM P-2 F5/BCHA-401 F3/BCHGA-401 - 45 MIN HW-SH-3F SEE SPEC 1

1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

NTS

C2

COLOR BOARD

1 REMOVE EXISTING DOOR AND FRAME.

2 NEW 45 MIN. FIRE RATED DOOR AND FRAME. SEE DOOR SCHEDULE

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

COORDINATE DOOR AND FRAME WITH ACCESS CONTROL

HARDWARE.

3 EXISTING CEILING TO REMAIN

4 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA

DURING ANY ACTIVITIES WHICH PRODUCE DUST - TYPICAL

Number Revisions: Date:

1 Addendum 1 2/25/2026

02/25/2026

BCHGA-401 ARCHITECTURAL ENLARGED VIEWS -FIRST LEVEL

File details come from the government source that posted it. Updated .