This is an architectural drawing set for the EHRM Infrastructure Upgrades project at the Edith Nourse Memorial Veterans Hospital, 200 Springs Road, Bedford, Massachusetts. The drawings are issued for construction and dated June 4, 2025, with an addendum dated February 25, 2026. The project is managed by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management, with TRIPLE C - The A/E Group serving as the architect/engineer of record.

The scope of work involves converting and upgrading telecommunication rooms at the facility. Key requirements include constructing new telecom rooms with 1-hour fire and smoke-rated partitions complying with VA physical security and campus standards, installing new 45-minute fire-rated doors with hollow metal frames, providing fire extinguisher cabinets with Type 2A:10B:C clean agent extinguishers within 75 feet of each new telecom room, and completing interior finishes including paint, wall base, resilient flooring, and building signage. The contractor is responsible for moving, storing, and returning all furnishings and equipment from work areas, as well as disassembly and reassembly of systems furniture in accordance with manufacturer specifications. Existing construction elements such as flooring, ceilings, and structural components will remain where indicated. The project requires coordination with mechanical, electrical, and telecom systems, with specific reference to detailed specifications and additional architectural, mechanical, and electrical drawings for complete project requirements.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

DN

DN UP

UP

UP

UP

DN

DN

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED

AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,

AND CAMPUS STANDARDS.

E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

G. SEE TYPICAL CEILING DETAILS ON SHEET A-531

H. ALL PHOTOS SHOWN REFLECT EXISTING CONDITIONS AS OF THE

DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH

MOVING, STORING AND RETURNING FURNISHINGS AND EQUIPMENT

TO THE PROPOSED WORK AREA(S). ANY DISASSEMBLY AND

REASSEMBLY OF SYSTEMS FURNITURE IN THE PROPOSED WORK

AREAS IS THE RESPONSIBILITY OF THE CONTRACTOR AND MUST

FOLLOW THE MANUFACTURER'S WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

A

8 9

B

TELECOM

ROOM

101C

660 SF

A

8 9

B

(EXIST VIF)

28'-0"

(E X

IS

T

V

IF

'-8

/8

101D

HW-SH-3F

TELECOM

ROOM

101C

660 SF

B

B

TYP.

B

B

03A-401

B8

A

8 9

B

TELECOM

ROOM

101C101C

A

8 9

B

TELECOM

ROOM

101C101C

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

1 F1

TYPICAL FRAME

H E

IG

H

T

2" WIDTH 2"

F3

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

ACOUSTICAL OR RATED

FLEXIBLE SEALANT

FLOOR LINE

ADD ONE LAYER OF 5/8" GWB,

ONE-SIDE WITH APPROVED UL

SETTING COMPOUND BETWEEN

LAYERS AND FASTENED TO

WALL AS REQUIRED, AT

EXISTING GWB WALL

ASSEMBLIES

STRUCTURAL DECK

EXISTING METAL STUDS AND

BATT INSULATION TO REMAIN

A/C GRADE, 3/4" FIRE-TREATED

PLYWOOD, ADHERED TO CONCRETE

AT EXISTING CONCRETE WALL

ASSEMBLIES

BOTTOM OF PLYWOOD

TO BE AT 12" AFF

UL DESIGN V497

1-HOUR PARTITION RATED FROM BOTH SIDES

EXISTING GWB OR

CONCRETE WALL

ASSEMBLY, WHERE OCCURS

SIDE OF

EXISTING

ROOM OR

CORRIDOR TO

REMAIN

XA-512

E5

XA-512

B4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753 mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:3

:2

A

M

03A-401

ARCHITECTURAL ENLARGED VIEWS - FIRST

LEVEL

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR CONSTRUCTION EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1/4" = 1'-0" C8

ARCHITECTURAL FLOOR PLAN - FIRST FLOOR

- RM 101C - DEMO

1/4" = 1'-0" B8

ARCHITECTURAL FLOOR PLAN - FIRST FLOOR

- RM 101E - NEW

1/32" = 1'-0" F8

FIRST FLOOR PLAN REFERENCE PLAN

1 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE

2A:10B:C CLEAN AGENT FIRE EXTINGUISHER LOCATED NO

GREATER THAN 75 FEET AWAY FROM THE NEW TR. CONTRACTOR

TO COORDINATE THE NEW LOCATION WITH THE COR.

CONTRACTOR SHALL BID A NEW FEC FOR EACH TR IN THE SCOPE

OF WORK. SEE SPECIFICATION 10.44.13.

2 NEW 45 MIN. FIRE RATED DOOR AND FRAME. SEE DOOR

SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

MODIFY DOOR AS REQUIRED FOR NEW ACCESS CONTROL

HARDWARE.

3 EXISTING FLOORING TO REMAIN.

4 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK

AREA DURING ANY ACTIVITIES WHICH PRODUCE DUST - TYPICAL.

5 EXISTING WALLS TO BECOME 1 HR FIRE AND SMOKE-RATED.

PATCH AND SEAL ALL PENETRATIONS AS NECESSARY.

6 EXISTING CEILING TO REMAIN

7 EXISTING EQUIPMENT TO REMAIN. INSTALL PLYWOOD WHERE

FEASIBLE.

8 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

9 DEMO EXISTING DOOR AND FRMAE

1/4" = 1'-0" C5

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - RM 101C - DEMO

1/4" = 1'-0" B5

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - RM 101E - NEW

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL

LEVEL 1 186 Room 101D 3' - 0" 8' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 F1/03A-401 F3/-3A-401 F1/03AIN101 45 MIN. HW-SH-3F YES 1

3" = 1'-0" F1

HOLLOW METAL HEAD DETAIL

3" = 1'-0"

F3

HOLLOW METAL JAMB DETAIL

1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED WALLS: UL

V438, UL U411

(TYPE B) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

B 2 1/2" 3/4" 45

Revisions: Date:

Addendum 1 02/25/2026

NOT TO SCALE

F6

ROOM 101C

02/25/2026

SHEET SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

GENERAL INTERIOR NOTES

KEYNOTES

GENERAL FINISH NOTES:

1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND

INSTALLATION REQUIREMENTS.

2. REFER TO THIS SHEET FOR FINISH LEGEND AND ROOM FINISH

SCHEDULE.

3. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN

FOR CONSISTENCY.

SUBSTITUTION NOTES:

1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR

SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.

TRANSITION NOTES:

1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.

2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT

DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR

WHEN DOOR PANEL IS IN THE CLOSED POSITION.

SIGNAGE NOTES:

1. REFER TO THIS SHEET SERIES SHEETS FOR SIGNAGE INFORMATION,

REFER TO SPECIFICATIONS FOR ADDITIONAL SIGNAGE,

IDENTIFICATION AND SYSTEMS/EQUIPMENT LABELING

REQUIREMENTS.

PAINTING NOTES:

1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED

ITEMS OR INSTALLER FINISHED ITEMS.

3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.

PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD

TO ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.

CODE NOTES:

1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE

WITH IBC 2024 803.13 INTERIOR WALL AND CEILING FINISH

REQUIREMENTS BY OCCUPANCY.

INSTALLATION NOTES:

1. PROVIDE BACKING FOR ALL WALL MOUNTED EQUIPMENT.

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

WALL BASE

JOHNSONITE*

BEIGE 49

RB-1

PAPER INSERT CARRIER, MAGNETIC

MOUNT, WITH NON-GLARE LENS

TEXT: 5/8"H LASER-PRINTED TEXT,

HELVETICA MEDIUM

COLOR: TO MATCH STATION

STANDARDS

1-1/2" x 1/32" ADA

TACTILE NUMERALS

AND GRADE II BRAILLE234

9"

Restricted Access

5-3/16" X 9" CLEAR

ACETATE INSERT W/

COPY

9"X9" MAGNETICALLY

REMOVABLE SIGN

(ONE-PIECE)

RED SYMBOL AND

BLACK TEXT

1/2" 9" 1/2"

/2

/2

QUARTER-ROUND

SILVER FRAME

EXISTING FLOORING

TO BE REMOVED

TOP OF SLAB

EXISTING

FLOORING TO

REMAIN, EXISTING

ROOM SIDE EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

RESILIENT BASE AS

SCHEDULED, EACH

SIDE OF NEW WALL

INSTALL 3/4"

PLYWOOD MOUNT

BOTTOM OF

PLYWOOD 12" AFF

ADJACENT SPACE

TELECOM

ROOM SIDE

PARTITION AS SCHEDULED

EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

LOCATION OF FLOOR

FINISH CHANGE;

SEAM OR ADAPTER

TRANSITION SHALL

OCCUR AT

CENTERLINE OF

DOOR IN CLOSED

POSITION

DOOR AS SCHEDULED

EXISTING FLOORING

TOP OF SLAB

CORRIDOR SIDE

DOOR FRAME BEYOND

C CENTER LINE OF DOORL

TRANSITION STRIP

(TR-1) OR EQUAL,

REFER TO SCHEDULE

FOR INFORMATION

TELECOM ROOM SIDE

SIGNAGE REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

SIGN SYMBOL LEGEND

TELECOM ROOM FINISH DIAGRAM,

CONTRACTOR TO REFERENCE

ARCHITECTURE FOR ACTUAL WALL

CONSTRUCTION LOCATIONS

2 51

F3

03IN101

TYP.

IN-01.31

IN-08.02

IN-04.01A

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753 mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:3

:2

A

M

03IN101

INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR CONSTRUCTION EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

NTS

C1

COLOR BOARD

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

LEVEL 1 101C TELECOM ROOM EXISTING EXISTING GWB P-1/ WD GWB P-1/ WD GWB P-1/ WD GWB P-1/ WD EXISTING

BUILDING SIGNAGE SCHEDULE

VERSION

TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE

ADA

BRAILLE TEXT COLOR BACKGROUND COLOR

DIMENSIONS

CommentsSIGN_HEIGHT SIGN_WIDTH MOUNTING HEIGHT

IN-01.31 1 FIRE IDENTIFICATION SIGN C5/ 03IN101 FEC REFER TO PAGE 429 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO WHITE RED 9" 9" 6' - 8" INSTALLED AT FIRE EXTINGUISHER CABINETS AT ALL

NEW TELECOM ROOMS

IN-04.01A 1 ROOM NUMBER IDENTIFICATION D3 / 03IN101 TELECOM ROOM REFER TO PAGE 259 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

YES REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 0" INSTALLED AT ALL NEW TELECOM ROOMS

IN-08.02 1 PROHIBIT INSTRUCTIONAL AND

CONTROL

D1/ 03IN101 TELECOM ROOM REFER TO PAGE 279 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

10" 10" 5' - 9" INSTALLED AT ALL NEW TELECOM ROOMS MOUNTED

DIRECTLY ABOVE ROOM NAME SIGN

Grand total: 3

3" = 1'-0" D3

IN-04.01A SIGN DETAIL - PRIMARY ROOM

IDENTIFICATION

3" = 1'-0"

D1

IN-08.02 SIGN DETAIL - PROHIBIT

INSTRUCTIONAL AND CONTROL

12" = 1'-0"

D5

EXAMPLE OF EXISTING SIGNAGE

6" = 1'-0" F3

RESILIENT BASE (TOE BASE)

6" = 1'-0"

F1

THRESHOLD - CONCRETE TO EXISTING FLOORING

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

P-1 PAINT CALIFORNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

RB-1 RESILIENT BASE JOHNSONITE* TRADITIONAL TOE BASE BEIGE 49 4" 09 65 13

WD PLYWOOD FIRE TREATED PLYWOOD* - - HIGH GLOSS WHITE MPI (MASTER PAINTERS INSTITUTE)

67 OR SIM

4' X 8' - PLYWOOD TO BE PAINTED WITH 2 COATS OF FIRE RESISTANT PAINT; FIRE

RATING STAMPS SHALL NOT BE PAINTED OVER

1 EXISTING FLOORING TO REMAIN.

2 EXISTING WALLS ARE TO BE PATCHED AND PAINTED. SEE ROOM

FINISH SCHEDULE THIS SHEET FOR FINISHES.

3 ALL WALLS TO RECEIVE NEW PLYWOOD, COORDINATE WITH

ELECTRICAL DRAWINGS FOR FIXTURE LOCATIONS

4 PROVIDE NEW ROOM SIGNAGE, SEE SIGNAGE SCHEDULE THIS

SHEET

5 REFER TO ARCHITECTURAL PLANS FOR DETAILED ROOM

CONFIGURATION INFORMATION

6 PAINT/PATCH WALLS AS REQUIRED FOR NEW DOOR INSTALLATION.

3" = 1'-0" C5

IN-01.31 SIGN DETAIL - FIRE EQUIPMENT

IDENTIFICATION SIGN

*Materials are approved as basis of design, all material substitutions are subject to owner approval.

Contractor to provide VA Interior Design Department with samples of all specified finish materials.

VA COR/ Interior Design department shall approve all finishes prior to installation.

1/2" = 1'-0" F6

TYPICAL TELECOM ROOM FINISH DIAGRAM

Revisions: Date:

Addendum 1 02/25/2026

02/25/2026

Sheets
03A-401 - ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL
03IN101 - INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES

File details come from the government source that posted it. Updated .