This document is a specification section for decorative film installation as part of the VA Bedford Health Care System EHRM Infrastructure Upgrades project (Project #518-22-700).

The specification requires furnishing labor, materials, tools, equipment, and services for decorative film installation in accordance with contract documents. The manufacturer must have a minimum of ten years of experience in decorative film manufacturing, while the installer must have a minimum of five years of experience installing products of the same type and scope. Both products and installation services must be provided by single manufacturers and installers respectively. The primary manufacturer specified is 3M Commercial Graphics Division, with allowance for other manufacturers to submit proposals provided they meet the salient characteristics outlined in the specification. Accessories required include edge sealer, premasking tape, and prespacing tape from 3M Commercial Graphics Division, provided as necessary for installation and durability. Installation must follow manufacturer's instructions, with film edges cut and trimmed neatly at a distance of 1/16 inch to 1/8 inch from the edge of rebate or glass at jambs, corners, and joints using sharp blades. The specification prohibits installation on glass with edge damage and requires inspection of glazing surfaces and field verification of film sizes prior to installation. Upon completion, all leftover materials and debris must be removed, damaged panels repaired or replaced, and work protected from damage by other trades. A manufacturer's standard three-year warranty against defects in material or workmanship is required, along with submission of manufacturer's data sheets, product samples, maintenance data, and fire performance data including fire class and NFPA test numbers.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Bedford Health Care System EHRM Infrastructure Upgrades - Bedford VAMC

Project #: 518-22-700

Decorative Film

08 87 33 - 1

SECTION 08 87 33

DECORATIVE FILM

PART 1 - GENERAL

1.1 SUMMARY

A. Furnish labor, materials, tools, equipment, and services for Decorative Film, as indicated, in accordance with provisions of Contract Documents.

B. Completely coordinate with work of other trades.

1.2 QUALITY ASSURANCE

A. Manufacturer:

1. Minimum ten (10) years experience in manufacture of decorative film.

B. Installer:

1. Minimum five (5) years experience installing products of same type and scope as specified.

C. Products specified in this section shall be supplied by a single manufacturer

D. Products specified in this section shall be installed by a single installer.

1.3 SUBMITTALS

A. Project Information:

1. Manufacturer’s data sheets for products specified, including:

a. Preparation instructions and recommendations.

b. Storage and handling requirements and recommendations.

c. Installation methods.

B. Samples:

1. Manufacturer's standard sample of specified film type.

C. Contract Closeout Information:

1. Maintenance data.

2. Warranty.

D. Interior finish fire performance data:

1. Provide for each finish material and type specified:

a. Manufacturer's printed information including:

1) Fire class.

2) NFPA test number.

3) Photograph.

b. Proof of purchase.

1.4 WARRANTY

Manufacturer’s standard warranty for a period of three (3) years against defects in material or workmanship.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Decorative Film: See construction document for finish

VA Bedford Health Care System EHRM Infrastructure Upgrades - Bedford VAMC

Project #: 518-22-700

Decorative Film

08 87 33 - 2

1. Base:

a. 3M Commercial Graphics Division.

B. Other manufacturers to submit but meet the salient characteristics in this section.

2.2 MATERIALS

A. Accessories:

1. Edge Sealer, Premasking Tape, Prespacing Tape by 3M Commercial Graphics Division.

2. Provide as required for installation and durability.

PART 3 - EXECUTION

3.1 INSPECTION

A. Examine glazing surfaces and conditions under which decorative film is to be installed.

B. Field verify film size for each glass panel, within tolerances and dimensions established.

C. Beginning of installation indicates acceptance of conditions and responsibility for performance.

3.2 INSTALLATION

A. Do not install on glass with edge damage.

B. Install in accordance with manufacturer’s instructions.

C. Cut and trim film edges neatly at uniform at a distance of 1/16 IN to1/8 IN from edge of rebate or edge of glass at jambs, corners and joints.

1. Maintain clean cut utilizing sharp blades.

3.3 CLEANING AND PROTECTION

A. Remove left over material and debris from work area.

B. Touch up, repair or replace damaged panels.

C. Protect from damage by other trades.

D. Clean per manufacturer’s recommendations.

END OF SECTION