This document is a set of architectural and construction drawings for the Edith Nourse Rogers Memorial Veterans Hospital Infrastructure Upgrades project (Project 518-22-700, Building 62) located at 200 Springs Road, Bedford, MA. The drawings were issued for construction on 06/04/2025 with Addendum 1 dated 02/25/2026.

The project involves hazardous material abatement, renovation of telecom rooms, and infrastructure upgrades across basement, first, and second levels. Key scope items include: removal of asbestos-containing materials (ACM) identified in pipe insulation, fittings, and transite panels (60 linear feet); abatement of lead-based paint (20 square feet) and transite panels with mastic and caulking (100 square feet); construction of three new 1-hour fire and smoke-rated telecom rooms (B24A, 125, and 225) with approximately 121-162 square feet each; installation of new electrical systems including UPS units, emergency and normal power distribution, access control, and mechanical systems; telecommunications infrastructure including new CAT 6A cabling, cable tray, wireless access points, and security cameras; and interior finishes with static dissipative concrete flooring, painted walls, resilient base, and room signage. All work must comply with OSHA silica dust regulations, EPA and state environmental requirements, and maintain building operations in adjacent occupied spaces. The contractor must coordinate work phasing with the VA Contracting Officer's Representative, provide containment barriers, decontamination facilities, and daily debris removal, and submit waste shipment records within 35 days of material departure from the site.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

DN

DN

UP

UP

DN

UP

UP

UP

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND

DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF

MASSACHUSETTS AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF

LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, STATE OF MASSACHUSETTS DEPARTMENT OF PUBLIC HEALTH, AND THE STATE OF

MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL CONSERVATION

2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM

DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. COORDINATE USAGE OF STAIRS VS USAGE OF CHUTE FOR DISPOSAL OF REMOVED HAZARDOUS MATERIAL ON THE FIRST LEVEL. THE ABATEMENT

CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE

REGULATIONS. WHERE OVERLAPS OCCUR, THE MOST STRINGENT REQUIREMENTS APPLY.

4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A MAS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A MAS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS

SHALL BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR

ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR

ASBESTOS EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE

ENVIRONMENT.

8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED

MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT

DOCUMENTS. THE OWNER OR THEIR REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR LOST,

DAMAGED OR STOLEN ITEMS.

10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, MASDPH, AND THE MASDEC.

12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS

BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE

PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS

SHOWING THE NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES.

THE GROUND LEVEL IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG

METHODS ON THE GROUND LEVEL TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD

ABATEMENT REQUIREMENTS, AND THE COR.

18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR.

ALL OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL

BE RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM

ON HVAC EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS.

COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED

TO THE OWNER WITHIN 35 DAYS OF WASTE LEAVING THE SITE.

22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, SPECIFIC ORIGINAL FLOORING MATERIALS, AND IN TRANSITE PANELS AT RADIATORS BELOW WINDOWS. NO ASBESTOS CONTENT HAS BEEN IDENTIFIED IN SAMPLING OF CEILING TILES, DRYWALL, JOINT COMPOUND, SKIM COAT, FIBERBOARD, FIRESTOP, COVE BASE, MASONRY WINDOW CAULK, BATHROOM CAULK, TILE GROUT, TILE GLUE, CERAMIC TILES, OR SPECIFIC FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY.

SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION.

UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR ANALYZE BULK SAMPLES OF

SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY

BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

24. COORDINATE WITH INDUSTRIAL HYGIENIST FOR REVIEW OF MONITORING, AND FINAL CONFIRMATION OF

ABATED AREAS, REFER TO SPEC SECTION 02 82 13.13

KEYNOTES#

QUANTITIES - ACM /LEAD MATERIALSLEGEND

REMOVAL PATH

SAMPLE

HA ## SAMPLE LOCATION

ASBESTOS /

LEAD PAINT

NOT ALL SAMPLE LOCATIONS SHOWN FOR CLARITY. ONLY

POSITIVE OR POSITIVE STOP SAMPLES ARE LOCATED.

SAMPLE NUMBER PER SURVEY REPORT FROM TERRACON.

REFER TO SURVEY REPORT FOR SPECIFIC SAMPLE

INFORMATION

PATH INDICATED IS PROVIDED FOR INTENT ONLY.

COORDINATE FINAL REMOVAL PATHWAYS, PHASING, AND

METHODS WITH GENERAL CONTRACTOR AND COR.

SAMPLE

PNT ##

20 SF LEAD CONTAINING PAINT TO BE ABATED

TP

TRANSITE PANELS 100 SF TRANSITE PANEL, MASTIC AND CAULKING (AT

WINDOWS) TO BE ABATED.

60 LF PIPE FITTTINGS, INSULATION AND MASTIC TO

BE COMPLETELY ABATED AND REMOVED.

STAIR-4

162162

1-BED

PATIENT

RM

118118

1-BED

PATIENT

ROOM

120120

DAY RM

119119

SHOWER

115B115B

LINEN

117117

HOUSE

KEEPING

CLOSET

116116

STORAGE

115A115A

TOILET

114114

LOBBY

115115

PIPE

CHASE

127127

1-BED

PATIENT

RM

113113

STORAGE

130130

ELECTRICAL

CLOSET

112A112A

2-BED

PATIENT

RM

109 A109 A

2-BED

PATIENT

RM

109 B109 B

1-BED

HOSPICE

RM

109 C109 C

CORRIDOR

132132

SHOWER

131131

STAIR-6

163163

LOUNGE

108108

TOILET

108A108ACLOSET

108B108B

1-BED

PATIENT

RM

107107

OFFICE

NURSE

MGR

106106

MED

SYRGICAL

SUPPLY

105105

STORAGE

104104

STAIR-5

121121

UTILITY

STORAGE

122122

2-BED

PATIENT

ROOM

123123

2-BED

PATIENT

RM

103103

2-BED

PATIENT

RM

102102

NURSE

STATION

124124

MEDICATION

RM

125125

3-BED

PATIENT

RM

126126

STAFF

REST

ROOM

127127

STAIR-2

128128

STORAGE

101101

ELECTRICAL

CLOSET

101 A101 A

ELEVATOR

100 B100 B

LOBBY

100100

TELECOM

100A100A

ELEVATOR

100C100C

MENS

RESTROOM

148148

WOMENS

RESTROOM

149149

STAIR-1

161161

DAY RM

140140

NURSE

STATION

141141

NOURISHMENT

ALCOVE

141 A141 A

TOILET

141 B141 B

QUIET

ROOM

142142

NURSE

MANAGER

143143

STORAGE

ROOM

144144

STORAGE

145145

REHAB

146146

2-BED

PATIENT

RM

147147

6-BED

PATIENT

RM

130130

1-BED

PATIENT

RM

129129

1-BED

PATIENT

RM

131131

LINEN

132132

SHOWER

134 A134 AHOUSE

KEEPING

CLOSET

133133

STORAGE

134B134B

CLOSET

134134

LOBBY

134134

PIPE

CHASE

136136

TOILET

135135

PIPE

CHASE

139139

1-BED

PATIENT

RM

136136

1-BED

PATIENT

RM

137137

ELECTRICAL

CLOSET

137 A137 A

STAIR-3

160160

TOILET

140 A140 A

CORRIDOR

138138

CORRIDOR

150150

CORRIDOR

151151CORRIDOR

152152

CORRIDOR

112112

CORRIDOR

111111

SAMPLE

PNT#166

TP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A/E:

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753 mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:5

A

M

62H-101

HAZARDOUS MATERIAL ABATEMENT PLAN -

FIRST LEVEL

518-22-700

06/04/2025 M PERKINS J SONES

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1/8" = 1'-0" F2

HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL

1 PRIOR TO DEMO PROVIDE CONTAINMENT BARRIER AND PERSONNEL DECONTAMINATION FACILITY PER 02 82 11 DURING ABATEMENT WORK. COORDINATE TIMING WITH COR (48 HR MAX) TO MINIMIZE

DISRUPTION TO OCCUPIED SPACES.

2 ABATE AND REMOVE LEAD BASED PAINT THROUGHOUT ENTIRE ROOM. ASSUMED DOOR FRAMES ALSO CONTAIN LEAD BASED PAINT. DISPOSE OF FRAME PROPERLY WHERE FRAME IS BEING REMOVED.

WHERE FRAME IS TO REMAIN, ABATE AND REMOVE PAINT ON DOOR FRAME.

Revisions: Date:

Addendum 1 2/25/2026

02/25/2026

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED

AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,

AND CAMPUS STANDARDS.

E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

G. SEE TYPICAL CEILING DETAILS ON SHEET A-531

H. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

62A-400

B7

TELECOM

RM

B24AB24A

H

I

10 11

MECHANICAL

ROOM

B23AB23A

ELECTRONIC

EQUIPMENT

B24B24

LOBBY

B41B41

4'-9" 3'-4"

5 15

RESTROOM

B25

121 SF

H

I

10 11

MECHANICAL

ROOM

B23AB23A

TELECOM

RM

B24AB24A ELECTRONIC

EQUIPMENT

B24B24

LOBBY

B41B41

B

A H

W -S

H -3

F

B

B

A6

B

B

(EXTG V.I.F.)

8'-1 1/2"

(E X

T G

V .I.

F

'-1

1/

2"

2'-4"

H

I

10 11

TELECOM

RM

B24AB24A

3 1/2"

H

I

10 11

3 1/2"

RESTROOM

B25B25

ACOUSTICAL OR RATED

SEALANT BOTH SIDES

FLOOR LINE

5/8" GWB BOTH SIDES

SOUND ATTENUATION

BATTS (SAB) PER

SCHEDULE.

CEILING LINE

STRUCTURAL DECK

METAL STUDS, SIZE

PER SCHEDULE

62A-512

E5

A/C GRADE, 3/4" FIRE-

TREATED PLYWOOD

62A-512

B4

AT FIRE RATED

PARTITIONS

AT SMOKE RATED

PARTITIONS

BOTTOM OF PLYWOOD TO

BE AT 12" AFF

ACOUSTICAL OR RATED

FLEXIBLE SEALANT

FLOOR LINE

ADD ONE LAYER OF 5/8" GWB,

ONE-SIDE WITH APPROVED UL

SETTING COMPOUND BETWEEN

LAYERS AND FASTENED TO

WALL AS REQUIRED, AT

EXISTING GWB WALL

ASSEMBLIES

STRUCTURAL DECK

EXISTING METAL STUDS AND

BATT INSULATION TO REMAIN

A/C GRADE, 3/4" FIRE-TREATED

PLYWOOD, ADHERED TO CONCRETE

AT EXISTING CONCRETE WALL

ASSEMBLIES

BOTTOM OF PLYWOOD

TO BE AT 12" AFF

UL DESIGN V497

1-HOUR PARTITION RATED FROM BOTH SIDES

EXISTING GWB OR

CONCRETE WALL

ASSEMBLY, WHERE OCCURS

SIDE OF

EXISTING

ROOM OR

CORRIDOR TO

REMAIN

62A-512

E5

62A-512

B4

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

D1

TYPICAL FRAME

H E

IG

H

T

2" WIDTH 2"

C1

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

LINE OF

STRUCTURE

LINE OF

STRUCTURE

09 29 00

SOUND ATTENUATION BATTS

(SAB), WHERE OCCURS

NOTE:

IF PARTITION TYPE IS USED IN A

CHASE WALL CONDITION, PROVIDE

CROSS BRACING GUSSETS AT 48"

O.C. MAX VERTICALLY. FABRICATED

FROM 6" MTL STUDS.

6”

09 29 00

5/8" GWB

09 29 00

SAB RETAINER STRAP

WHERE SAB OCCURS

CEILING

07 92 00

SEALANT

09 22 16

METAL STUDS

62A-512

B4

62A-512

E5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:5

A

M

62A-400

ARCHITECTURAL ENLARGED VIEWS - BASEMENT

LEVEL

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1 DEMO PORTION OF WALL/FRAMING FOR NEW DOOR

2 DEMO ALL WALL MOUNTED ITEMS. VA COR TO DETERMINE IF ANY

ITEMS ARE TO BE SALVAGED PRIOR TO START OF DEMO.

3 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA

DURING ACTIVITIES WHICH PRODUCE DUST

4 DEMO ALL TOILET PARTITION AND SHELVING. VA COR TO

DETERMINE IF ANY ITEMS ARE TO BE SALVAGED PRIOR TO START

OF DEMO.

5 REMOVE EXISTING TILE FLOORING, GROUT, ADHESIVES, AND WALL

BASE. PATCH AND REPAIR AS NEEDED FOR A SMOOTH FINISH.

6 REMOVE EXISTING DOOR AND FRAME

7 EXISTING PLUMBING, FIXTURES, AND ACCESSORIES TO BE

DEMOLISHED. COORDINATE WITH VA COR FOR ANY ITEMS THAT

ARE TO BE SALVAGED. ALL PIPING TO BE DEMOLISHED BACK TO

SOURCE. REFER TO PLUMBING DRAWINGS FOR ALL ASSOCIATED

PLUMBING, PIPING AND FIXTURES TO BE DEMOLISHED.

8 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL

IN ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN

OR APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE

COR.

9 REMOVE EXISTING CEILING AND LIGHTS. MODIFY AND/OR PROVIDE

ADDITIONAL SUPPORTS AS REQUIRED FOR EXISTING CEILING ITEMS

TO REMAIN.

10 EXISTING WALL TO BECOME 1 HOUR FIRE AND SMOKE-RATED.

PATCH AND SEAL ALL PENETRATIONS AS NECESSARY.

11 DEMO ALL TILE WALL FINISHES. ALL WALLS SHOULD BE PATCHED

AND REPAIRED TO RECEIVE NEW WALL ITEMS.

12 NEW 45 MIN. FIRE RATED DOOR AND DOOR. SEE DOOR SCHEDULE

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY

DOOR AS REQUIRED FOR NEW ACCESS CONTROL HARDWARE.

13 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A: 10B: C

CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN 75

FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE

THE NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A

NEW FEC FOR EACH TR IN THE SCOPE

14 OPEN TO DECK

15 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

16 REMOVE EXISTING WALL MOUNTED MIRROR, STORE AND PROTECT

FOR RE-INSTALLATION. CONTRACTOR IS RESPONSIBLE FOR ALL

DAMAGES.

17 RE-INSTALL STORED WALL MOUNTED MIRROR. COR TO CONFIRM

PLACEMENT OF MIRROR PRIOR TO INSTALL

1/32" = 1'-0" F7

BASEMENT LEVEL REFERENCE PLAN

1/4" = 1'-0" D7

ARCHITECTURAL FLOOR PLAN - BASEMENT

LEVEL - RM B24A - DEMO

1/4" = 1'-0" B7

ARCHITECTURAL FLOOR PLAN - BASEMENT

LEVEL - RM B24A - NEW

1/4" = 1'-0"

B5

ARCHITECTURAL REFLECTED CEILING PLAN -

BASEMENT LEVEL - RM B24A - NEW

1/4" = 1'-0" D5

ARCHITECTURAL REFLECTED CEILING PLAN -

BASEMENT LEVEL - RM B24A - DEMO

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL

BASEMENT B24A TELECOM RM B24A 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 C1/62A-400 C3/62A-400 F1/62IN101 45 MIN. HW-SH-3F SEE SPEC 1

LEVEL 1 125 TELECOM RM 125 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 C1/62A-400 C3/62A-400 F1/62IN101 45 MIN. HW-SH-3F SEE SPEC 1,2

LEVEL 2 225 TELECOM ROOM 224E 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 C1/62A-400 C3/62A-400 F1/62IN101 45 MIN. HW-SH-3F SEE SPEC 1,2

1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

2. DOOR HAS EXISTING CARD ACCESS

NOTE: FIRE RESISTANCE TEST FOR ONE HOUR RATED WALLS: UL

U465

(TYPE A) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

A4 4" 5 1/4" 35

A6 2 1/2" 6" 45

NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED WALLS: UL

V438, UL U411

(TYPE B) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

B 2 1/2" 3/4" 45

3" = 1'-0" C1

HOLLOW METAL JAMB DETAIL

3" = 1'-0" D1

HOLLOW METAL HEAD DETAIL

1/4" = 1'-0"

D3

DOOR AND FRAME TYPES ELEVATIONS

Number Revisions: Date:

1 Addendum 1 2/25/2026

(TYPE J) NON-RATED PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

J2 2 1/2" 3 1/8" -

DN

DN

DN

DN

UP

UP

DN

UP

UP

UP

DN

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED

AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,

AND CAMPUS STANDARDS.

E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

G. SEE TYPICAL CEILING DETAILS ON SHEET A-531

H. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

62A-401

B7

TELECOM

RM

125125

H

I

11 12

41 15

H

I

11 12

NURSE

STATION

124124

3-BED

PATIENT

RM

126126

CORRIDOR

151151

TELECOM

RM

162 SF

TYP.

H W

-S H

-3 F

B

B

A

B

B

J2

H

I

11 12

MEDICATION

RM

125125

H

I

11 12

TELECOM

RM

125125

62A-401

B3

TELECOM

ROOM

225225

H

I

41 15

H

I

NURSE

STATION

224224

TELECOM

ROOM

122 SF

3-BED

PATIENT

RM

226226

TYP.

4E

H W

-S H

-3 F

A

B B

B

B

B

(E X

IS

T

V

IF

'-5

/4

(EXIST VIF)

8'-2 1/2"

2'-5 1/4"

J2

H

I

H

I

TELECOM

ROOM

225225

MEDICATION

RM

162 SF

3-BED

PATIENT

RM

126126

NURSE

STATION

124124

OFFICE

121 SF 3-BED

PATIENT

RM

226226

NURSE

STATION

224224OFFICE

121 SF

3-BED

PATIENT

RM

226226

NURSE

STATION

224224

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:5

A

M

62A-401

ARCHITECTURAL ENLARGED VIEWS - FIRST

LEVEL

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1/32" = 1'-0" F7

FIRST LEVEL REFERENCE PLAN

1/32" = 1'-0"

F3

SECOND FLOOR REFERENCE PLAN

1/4" = 1'-0" D7

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 125 - DEMO

1/4" = 1'-0" B7

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 125 - NEW

1/4" = 1'-0" D3

ARCHITECTURAL FLOOR PLAN - SECOND

LEVEL - RM 225 - DEMO

1/4" = 1'-0" B3

ARCHITECTURAL FLOOR PLAN - SECOND

LEVEL - RM 225 - NEW

1 REMOVE ALL EXISTING WALL MOUNTED ITEMS. REPAIR, PATCH

AND PAINT WALLS AS REQUIRED.

2 REMOVE EXISTING FLOORING, ADHESIVES, AND WALL BASE

3 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK

AREA DURING ACTIVITIES WHICH PRODUCE DUST

4 ALL ITEMS ARE TO BE REMOVED FROM SPACE PRIOR TO DEMO.

5 EXISTING WALL TO BECOME 1 HOUR FIRE AND SMOKE-RATED.

PATCH AND SEAL ALL PENETRATIONS AS NECESSARY.

6 REMOVE EXISTING WINDOW AC UNIT

7 REMOVE EXISTING DOOR AND FRAME

8 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL

IN ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN

OR APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE

COR.

9 REMOVE EXISTING ACOUSTICAL CEILING AND LIGHTS. MODIFY

AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR

EXISTING CEILING ITEMS TO REMAIN.

10 EXISTING PLUMBING, FIXTURES, AND ACCESSORIES TO BE

DEMOLISHED. COORDINATE WITH VA COR FOR ANY ITEMS THAT

ARE TO BE SALVAGED. ALL PIPING TO BE DEMOLISHED BACK TO

SOURCE. REFER TO PLUMBING DRAWINGS FOR ALL ASSOCIATED

PLUMBING, PIPING AND FIXTURES TO BE

DEMOLISHED.

11 NEW FURRING WALL AT EXTERIOR WALL TO ENCLOSE WINDOW.

MAINTAIN 1/2" GAP BETWEEN EXISTING WALL INTERIOR FACE AND

NEW STUDS. MODIFY/ REMOVE INTERIOR WINDOW TRIM AS

REQUIRED. INSTALL WINDOW FILM AT ALL FURRED WINDOWS. SEE

62IN101 FOR MORE INFORMATION.

12 OPEN TO DECK

13 NEW 45 MIN. FIRE RATED DOOR AND FRAME. SEE DOOR

SCHEDULE AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

MODIFY DOOR AS REQUIRED FOR NEW ACCESS CONTROL

HARDWARE.

14 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:

10B: C CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER

THAN 75 FEET AWAY FROM THE NEW TR. CONTRACTOR TO

COORDINATE THE NEW LOCATION WITH THE COR. CONTRACTOR

SHALL BID A NEW FEC FOR EACH TR IN THE SCOPE

15 POTENTIAL ABATEMENT AT FLOOR TO FLOOR PENETRATIONS

1/4" = 1'-0" D5

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - RM 125 - DEMO

1/4" = 1'-0" B5

ARCHITECTURAL REFLECTED PLAN - FIRST

LEVEL - RM 125 - NEW

1/4" = 1'-0" D1

ARCHITECTURAL REFLECTED CEILING PLAN -

SECOND LEVEL - RM 225 - DEMO

1/4" = 1'-0" B1

ARCHITECTURAL REFLECTED CEILING PLAN -

SECOND LEVEL - RM 225 - NEW

Number Revisions: Date:

1 Addendum 1 2/25/2026

"FIRE-RATED WALLS"- ADDITIONAL NOTES:

1. CONDITIONS INDICATED TO SHOW DESIGN INTENT. THEY ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR A UL-APPROVED TOP-OF-WALL DESIGNS THAT ARE APPROPRIATE FOR CONDITIONS.

2. REFER TO SECTION 07 84 00 / FIRESTOPPING FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITION FOR FIRE-RATED WALLS.

SLOTTED TOP

TRACK

STUD

DESIGN BASIS: UL-HW-D-0082

CONCRETE SLAB

DESIGN BASIS: UL-HW-D-0042

METAL DECK

(PERPENDICULAR TO FLUTES)

/8

DESIGN BASIS: UL-HW-D-0264

METAL DECK

(PARALLEL TO FLUTES)

1" 1" 2"x20 GA

STRAPS @ 16"

O.C.

DESIGN BASIS: UL-HW-D-0259

STEEL BEAM

20 GA Z-BARS

TO

ACCOMMODATE

SFRM

SPRAY-APPLIED

FIRE-RESISTIVE

MATERIAL

(SFRM)

SAB

1 OR 2 LAYERS OF GWB;

SEE WALL TYPE

FIRE STOP SEALANT

FIRE STOP JOINT

SPRAY

MINERAL WOOL

FORMING MATERIAL

/8

/8

FIRE STOP JOINT

SPRAY

SLOTTED TOP

TRACK

STUD

SAB

1 OR 2 LAYERS OF GWB;

SEE WALL TYPE

/8

MINERAL WOOL

FORMING MATERIAL

SLOTTED TOP

TRACK

STUD

CONCRETE SLAB METAL DECK

(PERPENDICULAR TO FLUTES)

/8

/8

METAL DECK

(PARALLEL TO FLUTES)

1" 1"

/8

SLOTTED TOP

TRACK

2"x20 GA

STRAPS @ 16"

O.C.

STEEL BEAM

/8

20 GA Z-BARS

TO

ACCOMMODATE

SFRM

SPRAY-APPLIED

FIRE-RESISTIVE

MATERIAL

(SFRM)

SAB

GWB

ACOUSTICAL SEALANT

CUT ONE LAYER GWB TO

FOLLOW PROFILE OF DECKING.

SEAL CONTINUOUSLY WITH

ACOUSTICAL SEALANT.

FILL FLUTE VOID W/

SAB

GWB SOUND AND

SMOKE CLOSURE

STRIP SECURE TO

STRUCTURE AND SEAL

WITH ACOUSTICAL

SEALANT

ACOUSTICAL

SEALANT (BOTH

SIDES)

STUD

SAB

GWB

ACOUSTICAL SEALANT

(BOTH SIDES)

"SMOKE PARTITIONS AND SOUND-CONTROL WALLS"- ADDITIONAL NOTES:

1. UPGRADE TO DETAIL "B4" WHERE WALL IS DESIGNATED WITH A FIRE-RESISTANCE RATING.

2. FILL VOIDS WITH SOUND ATTENUATION BATTS (SAB).

3. SOUND WALLS AND SMOKE PARTITIONS REQUIRE THAT AT LEAST ONE LAYER OF GWB BE CUT TO FOLLOW UNDULATING SURFACES OF SUPERSTRUCTURES INCLUDING BUT NOT LIMITED TO FLUTES METAL DECKING. JOINT GWB TO SUPERSTRUCTURE WITH A CONTINUOUS BEAD OF ACOUSTICAL SEALANT.

4. BUILDING CODE REQUIRES THAT "SMOKE PARTITIONS" BE SEALED TO STRUCTURE AS INDICATED TO SUCCESSFULLY "….LIMIT THE PASSAGE OF SMOKE….".

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:5

A

M

62A-512

ARCHITECTURAL PARTITION HEAD DETAILS 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

3" = 1'-0" B4

HEAD-OF-WALL CONDITIONS - STUD WALLS - FIRE RATED WALLS

3" = 1'-0" E5

HEAD-OF-WALL CONDITIONS - STUD WALLS - SMOKE PARTITIONS AND SOUND CONTROL WALLS

NOTE:

STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION

TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE

USED. CONTRACTOR SHALL VERIFY ACTUAL CONDITIONS

ON-SITE.

Number Revisions: Date:

1 Addendum 1 2/25/2026

SHEET SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

GENERAL INTERIOR NOTES

KEYNOTES

GENERAL FINISH NOTES:

1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND

INSTALLATION REQUIREMENTS.

2. REFER TO THIS SHEET FOR FINISH LEGEND AND ROOM FINISH

SCHEDULE.

3. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN

FOR CONSISTENCY.

SUBSTITUTION NOTES:

1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR

SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.

TRANSITION NOTES:

1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.

2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT

DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR

WHEN DOOR PANEL IS IN THE CLOSED POSITION.

SIGNAGE NOTES:

1. REFER TO THIS SHEET SERIES SHEETS FOR SIGNAGE INFORMATION,

REFER TO SPECIFICATIONS FOR ADDITIONAL SIGNAGE,

IDENTIFICATION AND SYSTEMS/EQUIPMENT LABELING

REQUIREMENTS.

PAINTING NOTES:

1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED

ITEMS OR INSTALLER FINISHED ITEMS.

3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.

PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD

TO ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.

CODE NOTES:

1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE

WITH IBC 2024 803.13 INTERIOR WALL AND CEILING FINISH

REQUIREMENTS BY OCCUPANCY

INSTALLATION NOTES:

1. PROVIDE BACKING FOR ALL WALL MOUNTED EQUIPMENT.

MATERIAL FLOOR CHANGE (REFER TO THIS SHEET FOR DETAILS)

INTERIOR FINISH SYMBOLS

CONCRETE WITH STATIC DISSIPATIVE COATING (C-1/ SDC)

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

WALL BASE

JOHNSONITE*

BEIGE 49

RB-1

PAPER INSERT CARRIER, MAGNETIC

MOUNT, WITH NON-GLARE LENS

TEXT: 5/8"H LASER-PRINTED TEXT,

HELVETICA MEDIUM

COLOR: TO MATCH STATION

STANDARDS

1-1/2" x 1/32" ADA

TACTILE NUMERALS

AND GRADE II BRAILLE234

9"

Restricted Access

5-3/16" X 9" CLEAR

ACETATE INSERT W/

COPY

9"X9" MAGNETICALLY

REMOVABLE SIGN

(ONE-PIECE)

RED SYMBOL AND

BLACK TEXT

1/2" 9" 1/2"

/2

/2

QUARTER-ROUND

SILVER FRAME

EXISTING FLOORING

TO BE REMOVED

TOP OF SLAB

EXISTING

FLOORING TO

REMAIN, EXISTING

ROOM SIDE EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

RESILIENT BASE AS

SCHEDULED, EACH

SIDE OF NEW WALL

INSTALL 3/4"

PLYWOOD, MOUNT

BOTTOM OF

PLYWOOD 12" AFF

ADJACENT SPACE

TELECOM

ROOM SIDE

PARTITION AS SCHEDULED

EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE

(C-1/SDC)

LOCATION OF FLOOR

FINISH CHANGE;

SEAM OR ADAPTER

TRANSITION SHALL

OCCUR AT

CENTERLINE OF

DOOR IN CLOSED

POSITION

DOOR AS SCHEDULED

EXISTING FLOORING

TOP OF SLAB

CORRIDOR SIDE

DOOR FRAME BEYOND

C CENTER LINE OF DOORL

TRANSITION STRIP

(TR-1) OR EQUAL,

REFER TO SCHEDULE

FOR INFORMATION

TELECOM ROOM SIDE

SIGNAGE REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

SIGN SYMBOL LEGEND

IN-08.02

IN-04.01A

IN-01.31

TELECOM ROOM FINISH DIAGRAM,

CONTRACTOR TO REFERENCE

ARCHITECTURE FOR ACTUAL WALL

CONSTRUCTION LOCATIONS

F1

62IN101

TYP.

F3

62IN101

TYP.

1 2 5 6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:5

A

M

62IN101

INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

NTS

C1

COLOR BOARD

3" = 1'-0" D3

IN-04.01A SIGN DETAIL - PRIMARY ROOM

IDENTIFICATION

3" = 1'-0"

D1

IN-08.02 SIGN DETAIL - PROHIBIT

INSTRUCTIONAL AND CONTROL

NTS

D5

EXAMPLE OF EXISTING SIGNAGE

6" = 1'-0" F3

RESILIENT BASE (TOE BASE)

6" = 1'-0"

F1

THRESHOLD - CONCRETE TO EXISTING FLOORING

1 REMOVE EXISTING FLOORING, ADHESIVES, AND INSTALL NEW WALL

BASE

2 EXISTING WALLS ARE TO BE PATCHED AND PAINTED. SEE ROOM

FINISH SCHEDULE THIS SHEET FOR FINISHES.

3 ALL WALLS TO RECEIVE NEW PLYWOOD, COORDINATE WITH

ELECTRICAL DRAWINGS FOR FIXTURE LOCATIONS

4 PROVIDE NEW ROOM SIGNAGE, SEE SIGNAGE SCHEDULE THIS

SHEET

5 REFER TO ARCHITECTURAL PLANS FOR DETAILED ROOM

CONFIGURATION INFORMATION

6 TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE

SEALER

REFER TO THIS SHEET FOR ROOM FINISH SCHEDULE & FINISH LEGEND

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

BASEMENT B24A TELECOM RM C-1/SDC RB-1 GWB P-1/WD GWB P-1/WD GWB P-1/WD GWB P-1/WD OPEN

LEVEL 1 125 TELECOM RM C-1/SDC RB-1 GWB P-1/WD GWB P-1/WD GWB P-1/WD GWB P-1/WD OPEN

LEVEL 2 225 TELECOM ROOM C-1/SDC RB-1 GWB P-1/WD GWB P-1/WD GWB P-1/WD GWB P-1/WD OPEN

BUILDING SIGNAGE SCHEDULE

VERSIO

N TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE

ADA

BRAILLE TEXT COLOR BACKGROUND COLOR

DIMENSIONS

CommentsSIGN_HEIGHT SIGN_WIDTH MOUNTING HEIGHT

IN-01.31 3 FIRE IDENTIFICATION SIGN D6 / IN101 FEC REFER TO PAGE 429 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO WHITE RED 9" 9" 6' - 8" INSTALLED AT FIRE EXTINGUISHER CABINETS AT ALL

NEW TELECOM ROOMS

IN-04.01A 3 ROOM NUMBER IDENTIFICATION D3/ IN101 TELECOM ROOM REFER TO PAGE 259 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

YES REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 0" INSTALLED AT ALL NEW TELECOM ROOMS

IN-08.02 3 PROHIBIT INSTRUCTIONAL AND

CONTROL

D1/ IN101 TELECOM ROOM REFER TO PAGE 279 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 9" INSTALLED AT ALL NEW TELECOM ROOMS MOUNTED

DIRECTLY ABOVE ROOM NAME SIGN

Grand total: 9

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

C-1/SDC SEALED CONCRETE WITH STATIC DISSIPATIVE COATING SEALED CONCRETE* - - - - - TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE SEALER

F-1 FILM 3M* FASARA 7725SE-324 FROSTED CRYSTAL - 08 87 33 WINDOW FILM

P-1 PAINT CALIFIRNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

RB-1 RESILIENT BASE JOHNSONITE* TRADITIONAL TOE BASE BEIGE 49 4" 09 65 13

TR-1 TRIM SCHLUTER * - RENO-U SATIN ANODIZED ALUMINUM - 09 30 13 FLOOR TRANSITION

WD PLYWOOD FIRE TREATED PLYWOOD* - - HIGH GLOSS WHITE MPI (MASTER PAINTERS INSTITUTE)

67 OR SIM

4' X 8' - PLYWOOD TO BE PAINTED WITH 2 COATS OF FIRE RESISTANT PAINT; FIRE

RATING STAMPS SHALL NOT BE PAINTED OVER

*Materials are approved as basis of design, all material substitutions are subject to owner approval. Contractor to provide VA Interior Design Department with samples of all specified finish materials. VA COR/ Interior Design department shall approve all finishes prior to installation.

1/2" = 1'-0" F8

TYPICAL TELECOM ROOM FINISH DIAGRAM

3" = 1'-0" D6

IN-01.31 SIGN DETAIL - FIRE EQUIPMENT

IDENTIFICATION SIGN

Number Revisions: Date:

1 Addendum 1 2/25/2026

E S

CR

MD

RX DC

MD

CR

E S

DC RX

CR

E S

MD

DC RX

TELECOM RM

B24A

121 SF

LOBBY

B41

ELECTRONIC

EQUIPMENT

B24

B

-T R

B

A A

B

-T R

B

A B

B62-TRB24AB- 2,4,6

B62-TRB24AA- 2,4,6

B

-T R

B

A A

B

-T R

B

A A

B

-T R

B

A A

B

-T R

B

A B

B62-TRB24AB- 5

B62-TRB24AB- 1

B

-T R

B

A A

B

-T R

B

A A

B

-T R

B

A B

B62-TRB24AA- 1

B62-TRB24AB- 1

B62-TRB24AA- 1

B62-TRB24AB- 1

L1BL1

L1 L1

TYP.

IU-0-01

TYP.

TYP.

TYP.

TYP.

2 8

TYP.

TYP.

NURSE STATION

CORRIDOR

3-BED PATIENT

RM

B

-T R

A B

-T

R

B

B62-TR125B- 2,4,6

B62-TR125A- 2,4,6

L1

L1BL1

L1

B

-T R

5A

B

-T R

5A

B

-T R

5A

B

-T R

5B

B

-T R

5A

B62-TR125B- 1

B62-TR125A- 1

B

-T R

5B

B62-TR125A- 1

B62-TR125B- 1

B62-TR125A- 1

B62-TR125B- 1

TYP.

TYP.

TYP.

IU-1-01

TYP.

CU-1-01

CU-0-01 CU-2-01

B

-N P

A -T

R B

-N

P B

-T R

B

-T R

5B

5, B62-TR125B- 8,10

B

-T R

5B

,1

B

-T R

B

C U

-1 -0

CU-2-01

C U

-0 -0

13 19

TYP.

2 8

7 7

TYP.

TYP.

TELECOM RM

162 SF

TELECOM ROOM

122 SF

NURSE STATION

3-BED PATIENT

RM

B

-T R

A B

-T

R

B

B62-TR225A- 1 B62-TR225B- 1

B62-TR225A- 1B62-TR225B- 1

B62-TR225A- 1

B62-TR225B- 1

B

-T R

5A

B62-TR225B- 1

IU-2-01

TYP.

TYP.

TYP.

B

-T R

5A

B

-T R

5A

B

-T R

5B

B

-T R

5A

L1

L1

L1BL1

TYP.

B62-TR225A- 2,4,6

B62-TR225B- 2,4,6

TYP.

TYP.

TYP.

TYP.

MEDICATION RM

NURSE STATION

CORRIDOR

3-BED PATIENT

RM

TYP.

TYP.

OFFICE

NURSE STATION

3-BED PATIENT

RM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753

STAMP

mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd .M

A .R

/5

-2

-7

.B e d fo rd

.E H

R M

.M E

P .B

R

.r v t

/2

/2

:0

:2

P

M

62E-401

ELECTRICAL ENLARGED PLANS 518-22-700

06/04/2025 M. Perkins J. Castenir

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

A. CONTRACTOR SHALL COORDINATE ALL EQUIPMENT, DUCTWORK AND PIPING

WITH STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS AND SHALL

PROVIDE NECESSARY OFFSETS TO AVOID CONFLICTS AND TO MAINTAIN

REQUIRED EQUIPMENT ACCESS AND SERVICEABILITY.

B. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. CONSTRUCTION AREA CONDITIONS MAY DIFFER FROM

THOSE INDICATED.

C. MINIMUM BRANCH CIRCUIT SIZE SHALL BE 2#12, 1#12G., 3/4"C.

D. CONTRACTOR SHALL COORDINATE FINAL POINT OF CONNECTIONS

WITH VA COR PRIOR TO ROUGH-IN.

E. PROVIDE NEMA 3R ENCLOSURES FOR EQUIPMENT INSTALLED

OUTDOORS

F. SIZE BRANCH CIRCUITS AND FEEDERS TO EQUIPMENT PER PANEL

SCHEDULE AND FEEDER AND BRANCH CIRCUIT SIZING TABLE ON E-701.

G. COORDINATE FINAL EQUIPMENT CONNECTIONS AT EQUIPMENT WITH

EQUIPMENT SUPPLIER, PRIOR TO ROUGH-IN.

H. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL LISTING

PANEL AND CIRCUIT FEEDING THE WIRING DEVICE.

I. UPDATE PANEL SCHEDULES AFFECTED BY RENOVATION.

J. NEW CIRCUIT BREAKERS PROVIDED SHALL MATCH THE EXISTING TYPE

AND AIC RATING OF CIRCUIT BREAKERS IN PANEL BEING RENOVATED.

K. CONTRACTOR SHALL FIELD COORDINATE CABLE TRAY LAYOUT WITH

EXISTING UTILITIES ROUTED THROUGH THE RENOVATED SPACE.

L. CONTRACTOR SHALL COMPLY WITH NEC 300.22 FOR CONDUIT ROUTED IN

PLENUM SPACES.

M. REFER TO E-901 FOR CUTSHEETS.

N. COMPLY WITH NEC 220.87 FOR ALL 30-DAY LOAD MEASUREMENTS OF

PANELBOARDS.

O. LOCATE DISCONNECT SWITCHES TO MAINTAIN WORKING CLEARANCES

PER NEC 110.26.

P. CONTRACTOR SHALL LABEL ALL JUNCTION BOX COVERS WITH THE CIRCUITS

CONTAINED AND SOURCE PANEL IDENTIFIED.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

1. PROVIDE NEW 20" x 4" BONDING BAR, SET OF INSULATORS STAND-OFF

BRACKETS, AND STAINLESS STEEL SCREWS. PROVIDE ALL GROUNDING CABLE

AND CONNECTORS AND INSTALL PER TYPICAL DETAIL ON T-500 SERIES SHEETS.

2. NEW 5KW RACK-MOUNTED 208 V UNINTERRUPTIBLE POWER SUPPLY (UPS) WITH

NEMA 20A L21-20P INPUT AND L21-20R OUTPUT. PROVIDE NEW 208V 3-PHASE

CIRCUIT AND RECEPTACLE ON EMERGENCY POWER CIRCUIT. SEE T-500 SERIES

SHEETS FOR MORE DETAILS. ADDITIONALLY PROVIDE ADEQUATE RACK RAIL KIT

AND NIC FOR THE ASSOCIATED UPS.

3. PROVIDE ONE NEW EMERGENCY AND ONE NEW NORMAL POWER BRANCH

120/208 TPST CIRCUIT BREAKER FED FROM ABOVE FOR EACH RACK UPS

CIRCUIT. PROVIDE NEW CONDUIT, CONDUCTORS, AND DEVICES TO SUPPLY

EACH NEW RECEPTACLE. SEE T-500 SERIES SHEETS FOR MORE DETAILS.

4. NEW NORMAL POWER RECEPTACLE, SEE PANEL SCHEDULE FOR ADDITIONAL

INFORMATION.

5. NEW EMERGENCY POWER RECEPTACLE, SEE PANEL SCHEDULE FOR

ADDITIONAL INFORMATION.

6. NEW GFCI WET LOCATION RATED SERVICE RECEPTACLE. PROVIDE WITH A

WEATHERPROOF, EXTRA-DUTY, IN-USE COVER PER NEC 406.9.

7. NEW MECHANICAL INDOOR AND OUTDOOR UNITS, SEE MECHANICAL SHEETS

FOR ADDITIONAL INFORMATION.

8. PROVIDE (2) REDUNDANT VERTICAL PDUS AT EACH RACK.

9. SPACE FOR FUTURE RACK.

10. NEW POWER SUPPLY AND BATTERY BACKUP FOR NEW PACS EQUIPMENT.

PROVIDE A 20 AMP CIRCUIT PER NEC AND MANUFACTURERS

RECOMMENDATIONS.

11. PROVIDE NEW ACCESS CONTROL PER SPECIFICATIONS. HDP12 AND FIPS

COMPLIANT, CARD READER WITH PINPAD CARD, PIV READY.

12. LIGHTS SHALL BE WIRED TO THE NEW WALL MOUNTED SINGLE POLE SWITCH AT

THE CLOSET ENTRANCE. THE CONTROL SCHEME FOR THE LIGHTING CONTROL

SHALL BE MANUAL ON/ MANUAL OFF. COORDINATE FIXTURES WITH OVERHEAD

CABLE TRAY.

13. PROVIDE HEAVY DUTY NEMA 3R RATED 600V NON-FUSED DISCONNECT SWITCH

FOR MECHANICAL UNIT. SEE ELECTRICAL SCHEDULES ON E-700 SERIES SHEETS

FOR ADDITIONAL INFORMATION. COORDINATE LOCATION WITH NEW AND

EXISTING CONDITIONS.

14. NEW NORMAL POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION WITH

EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS FOR

ADDITIONAL INFORMATION.

15. NEW EMERGENCY POWER ELECTRICAL PANEL, FIELD COORDINATE LOCATION

WITH EXISTING AND NEW CONDITIONS. SEE E-600 AND E-700 SERIES SHEETS

FOR ADDITIONAL INFORMATION.

16. NEW 4” SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR

HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH

ENDS TO PROTECT CABLES,CABLE TRAY AND SPEED SLEEVE FILL SHALL NOT

EXCEED 40%. FIRE CAULK PENETRATION PER SPECIFICATIONS.

17. INDOOR UNIT IS POWERED BY THE OUTDOOR UNIT.

18. PROVIDE TRI-TECH (PIR, MICROWAVE, DOPLER) MOTION SENSOR.

19. 2#10, #10 GND - 3/4"C. 30A DISCONNECT.

20. NOT USED.

21. VERTICAL ROUTE FOR TELECOM RISER. SEAL ALL FLOOR PENETRATIONS TO

MAINTAIN FIRE RATING.

22. PROVIDE A 30 DAY LOAD MEASUREMENT OF PANELBOARD INDICATED. PROVIDE

THE REPORT TO THE COR AND AE PRIOR TO COMMENCEMENT OF PANELBOARD

RENOVATION.

23. PROVIDE NEW CIRCUIT BREAKERS AND FEEDERS SERVICING NEW TELECOM

EQUIPMENT. REFER TO SHEETS E-601 & E-701 FOR SIZING.

24. EXISTING ATS TO REMAIN. PROTECT IN PLACE.

25. EXISTING EQUIPMENT TO REMAIN. PROTECT IN PLACE.

26. EXISTING PANELBOARD TO REMAIN. PROTECT IN PLACE.

27. PROVIDE NEW 16" x 4" BONDING BAR, SET OF INSULATORS STAND-OFF

BRACKETS, AND STAINLESS STEEL SCREWS. PROVIDE ALL GROUNDING CABLE

AND CONNECTORS AND INSTALL PER TYPICAL DETAIL ON T-500 SERIES SHEETS.

28. EXISTING ACCESS CONTROL PANEL TO REMAIN. PROTECT IN PLACE.

29. EXISTING DOOR SECURITY TO REMAIN. PROTECT IN PLACE.

30. REMOVE EXISTING LIGHTING FIXTURE.

31. REMOVE EXISTING LIGHTING SWITCH.

32. REMOVE EXISTING RECEPTACLE.

33. EXISTING DISCONNECT TO REMAIN. PROTECT IN PLACE.

SCALE: 1/2" = 1'-0"

F8

ELECTRICAL ENLARGED PLAN -

BASEMENT LEVEL - RM B24A - NEW

SCALE: 1/2" = 1'-0"

F3

ELECTRICAL ENLARGED PLAN - FIRST

LEVEL - RM 125 - NEW

SCALE: 1/2" = 1'-0"

F1

ELECTRICAL ENLARGED PLAN -

SECOND LEVEL - RM 225 - NEW

SCALE: 1/2" = 1'-0"

C3

ELECTRICAL ENLARGED PLAN - FIRST

LEVEL - RM 125 - DEMO

SCALE: 1/2" = 1'-0"

C1

ELECTRICAL ENLARGED PLAN -

SECOND LEVEL - RM 225 - DEMO

REFER TO COVER SHEET FOR KNOWN ACM ITEMS

WITHIN THIS BUILDING.

Revisions: Date:

Addendum 1 02/25/2026

UP

UP

UP UP

UP

WAP

WAP

WAP

WAP

CTRK CTRK

WAP

WAP

WAP

CTRK

WAP

CTRK

CTRK

CTRK

CTRK

WAP

WAP

WAP

CTRK

CTRK

WAP

WAP

WAP

CTRK

CTRK

CTRK

WAP

WAP

WAP

CTRK

CTRK

CTRK

WAP

WAP

CTRK

CTRK

CTRK

CTRKWAP

WAP

WAP

WAP

CTRK

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

STORAGE

ROOM

B19

STORAGE

ROOM

B18

OFFICE

RECREATION

B20

LAUNDRY

B21

OFFICE

DOCTOR

B17

GRECC

FAMILY

ROOM

B16

SERVICE

ROOM

B16A

MEN'S

ROOM

B15

OFFICE

THERAPY

ASSISTANTS

B14

OFFICE

B12

OFFICE

OCCUPATIONAL

THERAPIST

B11

ELEC

CLOS

B13A

STAIR 6

B53

DAY ROOM

T.A.C.

B10

KITCHEN

B09

OFFICE

B07

UNISEX

RESTROOM

B05

WOMENS

ROOM

B04

POD ROOM

B03B

STORAGE

ROOM

B03

STORAGE

B02

ELECTRIC

ROOM

B02A

ELEV.

B03A

CLOSET

B03A

ROOM

B01

ROOM

B33D

MECHANICAL

ROOM

B23

MECHANICAL

ROOM

B23A

STAIR 5

B22

STAIR 4

B52

TELECOM

RM

B24A

121 SF

ELECTRONIC

EQUIPMENT

B24

STORAGE

ROOM

B25A

OFFICE

B25

CLOS

B26

BREAK

ROOM

B33B

STAIR 2

B27

STOR.

ROOM

B29A

TLT

B28

ELECTRONIC

TECHNICIANS

B29

STAIR 1

B51

STORAGE

ROOM

B33A

STAIR 3

B50

STORAGE

ROOM

B33

ELECTRONIC

SHOP

BREAK

ROOM

B30

STORAGE

ROOM

B30A

OFFICE HR

B31A

ELECTRONIC

RADIO

ROOM

B31

OFFICE

PROGRAM

SPECIALIST

B32

CORRIDOR

B13

LOBBY

B41

CORRIDOR

B40

LOBBY

B42

62T-401

F1

B13-AP-A

B13-AP-B

B13-AP-C

B17-C

NO DATA

B19-A

B20-AP-A

B13-CK-B B19-CK-A

B20-A

B17-A

B17-B

B16-A

B16-AP-A

B21-A

B22-AP-A

B42-A

B42-AAP-A

B14-B

B07-B

B07-A

B07-CK-A

B07-AP-B

CORRIDOR

B43

B -A

B43-CK-C

B43-CK-B

B43-CK-A

B09-CK-A

B09-A

B53-AP-A

B12-A

B11-B

B11-A

B09-AP-B

B10-B

B -A

B10-AP-A

B03B-CK-A

B13-CK-E

B03B-A

B13-AP-F

B03-AP-A

B41-A

B01-AP-A

B33D-A

B33D-B

B40-CK-A

B33B-CK-A

B40-CK-B

B33B-AP-A

B33B-A

ROOM

B24B

B24A-AP-A

B25-A

B25-AP-A

B -A

B33-CK-A

B33-CK-B

B -A

B33-CK-C

B33-B

B33-AP-C

B33-AP-B

B33-CK-E

B33-CK-F

B33-CK-G

EXT-A

EXT-B

B33A-A

B32-B

B32-A

B32-CK-A

B31-A

B27-AP-A

B31A-A

B29-C

B29-B

B29-A

B29-AP-A

B30-A

B30-B

B30-AP-A

B51-AP-A

NO DATA

NO DATA

NO DATA

NO DATA

NO DATA NO DATA

NO DATA

NO DATA

NO DATA

NO DATA

NO DATA

NO DATA

B13-CK-D

NO DATA

NO

DATA

TYP.

TYP.

TYP.

TYP.

TYP.

B A

-A

B24A-B

B A

-D

B24A-C

B24A-CAM-01

FIBER PATH A

FIBER PATH B

B11-AP-A

B14-AP-A

B03B-AP-A

B19-AP-A

B21-AP-A

B24-AP-A

B33-AP-A

B33-AP-D

B32-AP-A

B31A-AP-A

TYP.

TYP.

62T-401

C1

TO BUILDING 61

NO DATA

NO DATA

262' - 0"

TELECOM

RM

B24A

121 SF

FIBER PATH A

FIBER PATH B

CABLE LEGEND

(10) NEW CAT 6A

TNPN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753

STAMP

mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd .M

A .R

/5

-2

-7

.B e d fo rd

.E H

R M

.M E

P .B

R

.r v t

/2

/2

:1

:2

P

M

62T-100

TELECOMMUNICATION PLAN - BASEMENT LEVEL 518-22-700

06/04/2025 M. Perkins K.Mcdermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

SCALE: 1/8" = 1'-0"

F2

TELECOMMUNICATION PLAN -

BASEMENT LEVEL

97 DATA PORTS THIS AREA

15,764 GSF

SCALE: 1" = 100'-0"

F1

DIAMOND ANALYSIS - BASEMENT

LEVEL

A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,

FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.

B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL

OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL

NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &

NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.

C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END

WARRANTEED SOLUTION FOR THE CABLING.

D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.

E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR

EXCEED CATEGORY 6A STANDARDS.

F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.

G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN

WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.

UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR

PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A

MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR

TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE

TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF

EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE

TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL

PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE

EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE

REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH

EXISTING CONDUIT CAPACITY.

H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO

PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE

OR JUNCTION BOX.

I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.

J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW

EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE

TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.

K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING

BACK TO THE RACK.

L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL

STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL

INFORMATION

M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL

TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE

DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.

N. REFER TO R-900 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING

CONDITIONS.

O. FOR EXISTING SECURITY CAMERAS BEING RE-CABLED, MAINTAIN EXISTING

CAMERA ANGLE AND PROTECT IN PLACE.

P. ALL EXISTING PENETRATIONS NO LONGER BEING USED WILL BE FILLED WITH

RATED ASSEMBLY.

Q. ABOVE CEILING SURVEY TO OCCUR FOR CABLE TRAY INSTALLATION. EXISTING

EQUIPMENT AND/ OR SYSTEMS TO BE SELECTED AS REQUIRED. ALL ACTIVE

SYSTEMS TO REMAIN OPERATIONAL.

1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH

EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS

ON SHEET T-501 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WAP'S TO REMAIN/PROTECT IN PLACE, AND NO NEW CABLING

REQUIRED FOR EXISTING WAP'S (WIRELESS ACCESS POINTS).

3. PROVIDE NEW 4-POST CHANNEL, PDU, UPS AND WIRE MANAGEMENT

COMPONENTS AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN

THE SPECIFICATIONS.

4. PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

5. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE CAREFULLY

PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING RACK SHALL BE

TRANSFERRED TO THE NEW RACK. CONTRACTOR SHALL PROVIDE SHOP

DRAWINGS SHOWING THE PROPOSED NEW RACK ELEVATION AND PROVIDE A

PHASING PLAN FOR TRANSFERRING ALL EXISTING DEVICES TO REMAIN TO THE

NEW RACKS.

6. PROVIDE NEW CABLE TRAY PER REQUIREMENTS LISTED IN CABLE TRAY

SCHEDULE. COORDINATE WITH EXISTING CONDITIONS AND SUBMIT

COORDINATION DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK. SEE

T-500 SERIES SHEETS FOR ADDITIONAL REQUIREMENTS. COORDINATE LIGHT

FIXTURES WITH OVERHEAD CABLE TRAY AND SPEED SLEEVE FILL SHALL NOT

EXCEED 40%.

7. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION

SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. MOUNT AT 8’ – 6” A.F.F. TO

TOP OF WALL BRACKET. INTEGRATE CAMERA INTO EXISTING VMS.

8. PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.

9. NEW 4” SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR

HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH

ENDS TO PROTECT CABLES,CABLE TRAY AND SPEED SLEEVE FILL SHALL NOT

EXCEED 40%. FIRE CAULK PENETRATION PER SPECIFICATIONS.

10. EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE

PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS

INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE

AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN

FOR TRANSFERRING FIBER.

11. EXISTING EQUIPMENT TO REMAIN, PROTECT-IN-PLACE.

12. DEMOLISH EXISTING FIBER ONCE NEW FIBER IS OPERATIONAL. CONTRACTOR

SHALL PROVIDE A PHASING PLAN FOR TRANSFERRING FIBER.

13. ALL EXISTING ANALOG PHONE CABLE DEVICES AND TERMINATIONS ETC. SHALL

REMAIN OPERATIONAL AT ALL TIMES AND SHALL BE RETAINED AND REUSED.

PROTECT IN PLACE.

14. VERTICAL ROUTE WITH REDUNDANT SPARE CONDUIT FOR TELECOM RISER. SEAL

ALL FLOOR PENETRATIONS TO MAINTAIN FIRE RATING.

15. HORIZONTAL CABLE LENGTH LIMITATIONS PER STANDARD 3.1.

16. EXISTING PACS AND EQUIPMENT RACKS.

17. NEW INDOOR UNIT.

18. CONTRACTOR SHALL FIELD VERIFY EXISTING TELECOMMUNICATIONS…