Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf

PDF 12 MB Posted

Attached to
Y1DA--518-22-700 EHRM Infrastructure Upgrades Construction Bedford VAMC
Solicitation number
36C77626R0003
Issued by

About this file

This is an architectural drawing set for infrastructure upgrades at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts. The project number is 518-22-700, and the drawings are issued for construction dated June 4, 2025, with Addendum 1 dated February 25, 2026. The A/E of record is TRIPLE C - The A/E Group, located in Hartford, Connecticut.

The scope of work focuses on creating new telecom rooms (Room 015) in the basement level, totaling 79 square feet. Key requirements include: (1) new 1-hour fire and smoke-rated partitions complying with VA Physical Security Standards and campus standards; (2) removal of existing flooring, adhesives, wall base, and ceiling infrastructure; (3) installation of fire-treated plywood at exterior walls with 1/2-inch gap from existing wall interior face; (4) new 45-minute fire-rated hollow metal doors and frames with access control hardware modifications; (5) application of static dissipative coating to concrete flooring; (6) painting with low VOC/odor materials (California Paints matching Benjamin Moore Manchester Tan HC-81 for walls and White Down OC-131 for metal doors); (7) installation of resilient wall base (Johnsonite Beige 49); (8) window film application (3M Fasara); (9) new fire extinguisher cabinets (Type 2A:10B:C) located no greater than 75 feet from each telecom room; and (10) provision of ADA-compliant room signage with braille and tactile numerals. The contractor is responsible for all costs associated with moving, storing, and returning furnishings and equipment, as well as disassembly and reassembly of systems furniture in accordance with manufacturer warranties. Temporary dust-tight barriers are required during dust-producing activities, and potential asbestos abatement is noted for floor penetrations.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED

AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,

AND CAMPUS STANDARDS.

E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

G. SEE TYPICAL CEILING DETAILS ON SHEET A-531

H. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

TELECOM

ROOM

015015

16A-400

B8

3 4

B

C

TELECOM

ROOM

79 SF

B

B

B

B

B

(EXIST VIF)

8'-8 1/2" (E

X

IS

T V

IF

9' -1

/4

H W

-S H

-3 F

J2

3 4

B

C

VACANT

102 SF

(EXIST VIF)

8'-10"

TELECOM

ROOM

79 SF

(E X

IS

T

V

IF

9'

-3

3 4

B

C

TELECOM

ROOM

79 SF

VACANT

102 SF

VACANT

011011

TELECOM

ROOM

015015

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

F6

TYPICAL FRAME

H E

IG

H

T

2" WIDTH 2"

F4

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

ACOUSTICAL OR RATED

FLEXIBLE SEALANT

FLOOR LINE

ADD ONE LAYER OF 5/8" GWB,

ONE-SIDE WITH APPROVED UL

SETTING COMPOUND BETWEEN

LAYERS AND FASTENED TO

WALL AS REQUIRED, AT

EXISTING GWB WALL

ASSEMBLIES

STRUCTURAL DECK

EXISTING METAL STUDS AND

BATT INSULATION TO REMAIN

A/C GRADE, 3/4" FIRE-TREATED

PLYWOOD, ADHERED TO CONCRETE

AT EXISTING CONCRETE WALL

ASSEMBLIES

BOTTOM OF PLYWOOD

TO BE AT 12" AFF

UL DESIGN V497

1-HOUR PARTITION RATED FROM BOTH SIDES

EXISTING GWB OR

CONCRETE WALL

ASSEMBLY, WHERE OCCURS

SIDE OF

EXISTING

ROOM OR

CORRIDOR TO

REMAIN

16A-512

E5

16A-512

B4

LINE OF

STRUCTURE

LINE OF

STRUCTURE

09 29 00

SOUND ATTENUATION BATTS

(SAB), WHERE OCCURS

NOTE:

IF PARTITION TYPE IS USED IN A

CHASE WALL CONDITION, PROVIDE

CROSS BRACING GUSSETS AT 48"

O.C. MAX VERTICALLY. FABRICATED

FROM 6" MTL STUDS.

6”

09 29 00

5/8" GWB

09 29 00

SAB RETAINER STRAP

WHERE SAB OCCURS

CEILING

07 92 00

SEALANT

09 22 16

METAL STUDS

16A-512

B4

16A-512

E5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:0

:0

P

M

16A-400

ARCHITECTURAL ENLARGED VIEWS - BASEMENT

& FIRST LEVELS

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA

DURING ACTIVITIES WHICH PRODUCE DUST.

2 TELECOM ROOM TO BE OPEN TO DECK ABOVE.

3 REMOVE EXISTING FLOORING, ADHESIVES AND WALL BASE.

4 NEW FURRING WALL AT EXTERIOR WALL TO ENCLOSE WINDOW.

MAINTAIN 1/2" GAP BETWEEN EXISTING WALL INTERIOR FACE AND

NEW STUDS. MODIFY/ REMOVE INTERIOR WINDOW TRIM AS

REQUIRED. INSTALL WINDOW FILM AT ALL FURRED WINDOWS. SEE

16IN101 FOR MORE INFORMATION.

5 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C

FIRE EXTINGUISHER LOCATED NO GREATER THAN 75 FEET AWAY

FROM THE NEW TR. CONTRACTOR TO COORDINATE THE NEW

LOCATION WITH THE COR. CONTRACTOR SHALL BID A NEW FEC FOR

EACH TR IN THE SCOPE OF WORK. SEE 01A-512 FOR RECESSIONS IN

RATED WALLS OR PROVIDE RATED CABINET. SEE SPECIFICATION 10

44 13.

6 EXISTING CEILING TO REMAIN

7 REMOVE EXISTING DOOR AND FRAME

8 EXISTING WALL TO BECOME 1 HOUR FIRE AND SMOKE-RATED. PATCH

AND SEAL ALL PENETRATIONS AS NECESSARY.

9 NEW 45 MIN. FIRE RATED DOOR AND FRAME. SEE DOOR SCHEDULE

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY DOOR

AS REQUIRED FOR NEW ACCESS CONTROL HARDWARE.

10 REMOVE EXISTING CEILING AND LIGHTS. MODIFY AND/OR PROVIDE

ADDITIONAL SUPPORTS AS REQUIRED FOR EXISTING CEILING ITEMS

TO REMAIN.

11 REMOVE LARGE SECTIONS OF PEELING PAINT AND REPAIR WALL FOR

PLYWOOD INSTALLATION

12 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

1/8" = 1'-0" F8

BASEMENT LEVEL REFERENCE PLAN

1/4" = 1'-0" B8

ARCHITECTURAL FLOOR PLAN - BASEMENT

LEVEL - RM 015 - NEW

1/4" = 1'-0" C8

ARCHITECTURAL FLOOR PLAN - BASEMENT

LEVEL - RM 015 - DEMO

1/4" = 1'-0" B6

ARCHITECTURAL REFLECTED CEILING PLAN -

BASEMENT LEVEL - RM 015 - NEW

1/4" = 1'-0" C6

ARCHITECTURAL REFLECTED CEILING PLAN -

BASEMENT LEVEL - RM 015 - DEMO

NOT TO SCALE

C3

BASEMENT LEVEL EXISTING TELECOM ROOM - B16 - RM 015

3" = 1'-0" F6

HOLLOW METAL HEAD DETAIL

3" = 1'-0"

F4

HOLLOW METAL JAMB DETAIL

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL

BASEMENT 015 TELECOM ROOM 015 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 F6/16A-400 F4/16A-400 F1/16IN101 45 MIN. HW-SH-3F SEE SPEC 1

1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED WALLS: UL V438, UL U411

(TYPE B) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

B 2 1/2" 3/4" 45

(TYPE J) NON-RATED PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

J2 2 1/2" 3 1/8" -

Number Revisions: Date:

1 Addendum 1 02/25/2026

SHEET SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

GENERAL INTERIOR NOTES

KEYNOTES

GENERAL FINISH NOTES:

1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND

INSTALLATION REQUIREMENTS.

2. REFER TO THIS SHEET FOR FINISH LEGEND AND ROOM FINISH

SCHEDULE.

3. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN

FOR CONSISTENCY.

SUBSTITUTION NOTES:

1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR

SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.

TRANSITION NOTES:

1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.

2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT

DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR

WHEN DOOR PANEL IS IN THE CLOSED POSITION.

SIGNAGE NOTES:

1. REFER TO THIS SHEET SERIES SHEETS FOR SIGNAGE INFORMATION,

REFER TO SPECIFICATIONS FOR ADDITIONAL SIGNAGE,

IDENTIFICATION AND SYSTEMS/EQUIPMENT LABELING

REQUIREMENTS.

PAINTING NOTES:

1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED

ITEMS OR INSTALLER FINISHED ITEMS.

3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.

PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD

TO ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.

CODE NOTES:

1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE

WITH IBC 2024 803.13 INTERIOR WALL AND CEILING FINISH

REQUIREMENTS BY OCCUPANCY

INSTALLATION NOTES:

1. PROVIDE BACKING FOR ALL WALL MOUNTED EQUIPMENT.

MATERIAL FLOOR CHANGE (REFER TO THIS SHEET FOR DETAILS)

INTERIOR FINISH SYMBOLS

CONCRETE WITH STATIC DISSIPATIVE COATING (C-1/ SDC)

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

WALL BASE

JOHNSONITE*

BEIGE 49

RB-1

PAPER INSERT CARRIER, MAGNETIC

MOUNT, WITH NON-GLARE LENS

TEXT: 5/8"H LASER-PRINTED TEXT,

HELVETICA MEDIUM

COLOR: TO MATCH STATION

STANDARDS

1-1/2" x 1/32" ADA

TACTILE NUMERALS

AND GRADE II BRAILLE234

9"

Restricted Access5-3/16" X 9" CLEAR

ACETATE INSERT W/

COPY

9"X9" MAGNETICALLY

REMOVABLE SIGN

(ONE-PIECE)

RED SYMBOL AND

BLACK TEXT

1/2" 9" 1/2"

/2

/2

QUARTER-ROUND

SILVER FRAME

EXISTING FLOORING

TO BE REMOVED

TOP OF SLAB

EXISTING

FLOORING TO

REMAIN, EXISTING

ROOM SIDE EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

RESILIENT BASE AS

SCHEDULED, EACH

SIDE OF NEW WALL

INSTALL 3/4"

PLYWOOD, MOUNT

BOTTOM OF

PLYWOOD 12" AFF

ADJACENT SPACE

TELECOM

ROOM SIDE

PARTITION AS SCHEDULED

1EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

LOCATION OF FLOOR

FINISH CHANGE;

SEAM OR ADAPTER

TRANSITION SHALL

OCCUR AT

CENTERLINE OF

DOOR IN CLOSED

POSITION

DOOR AS SCHEDULED

EXISTING FLOORING

TOP OF SLAB

CORRIDOR SIDE

DOOR FRAME BEYOND

C CENTER LINE OF DOORL

TRANSITION STRIP

(TR-1) OR EQUAL,

REFER TO SCHEDULE

FOR INFORMATION

TELECOM ROOM SIDE

SIGNAGE REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

SIGN SYMBOL LEGEND

F1

16IN101

TYP.

F4

16IN101

TYP.

1 2 5 6

TELECOM ROOM FINISH DIAGRAM,

CONTRACTOR TO REFERENCE

ARCHITECTURE FOR ACTUAL WALL

CONSTRUCTION LOCATIONS

IN-08.02

IN-04.01A IN-01.31

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:0

:0

P

M

16IN101

INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

NTS

C1

COLOR BOARD

3" = 1'-0" D3

IN-04.01A SIGN DETAIL - PRIMARY ROOM

IDENTIFICATION

3" = 1'-0"

D1

IN-08.02 SIGN DETAIL - PROHIBIT

INSTRUCTIONAL AND CONTROL

NTS

D5

EXAMPLE OF EXISTING SIGNAGE

6" = 1'-0" F4

RESILIENT BASE (TOE BASE)

6" = 1'-0"

F1

THRESHOLD - CONCRETE TO EXISTING FLOORING

1 REMOVE EXISTING FLOORING, ADHESIVES, AND INSTALL NEW WALL

BASE

2 EXISTING WALLS ARE TO BE PATCHED AND PAINTED.SCHEDULE

THIS SHEET FOR FINISHES.

3 ALL WALLS TO RECEIVE NEW PLYWOOD, COORDINATE WITH

ELECTRICAL DRAWINGS FOR FIXTURE LOCATIONS

4 PROVIDE NEW ROOM SIGNAGE, SEE SIGNAGE SCHEDULE THIS

SHEET

5 REFER TO ARCHITECTURAL PLANS FOR DETAILED ROOM

CONFIGURATION INFORMATION

6 TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE

SEALER

REFER TO THIS SHEET FOR ROOM FINISH SCHEDULE & FINISH LEGEND

3" = 1'-0" D6

IN-01.31 SIGN DETAIL - FIRE EQUIPMENT

IDENTIFICATION SIGN

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

BASEMENT 015 TELECOM ROOM C-1/ SDC RB-1 GWB P-1/WD GWB P-1/WD GWB P-1/WD GWB P-1/WD OPEN PAINT TO 10'-0" AFF

BUILDING SIGNAGE SCHEDULE

VERSION

TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE

ADA

BRAILLE TEXT COLOR BACKGROUND COLOR

DIMENSIONS

CommentsSIGN_HEIGHT SIGN_WIDTH MOUNTING HEIGHT

IN-01.31 1 FIRE IDENTIFICATION SIGN D6 / IN101 FEC REFER TO PAGE 429 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO WHITE RED 9" 9" 6' - 8" INSTALLED AT FIRE EXTINGUISHER CABINETS AT ALL

NEW TELECOM ROOMS

IN-04.01A 1 ROOM NUMBER IDENTIFICATION D3 / IN101 TELECOM ROOM REFER TO PAGE 261 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

YES REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 0" INSTALLED AT ALL NEW TELECOM ROOMS

IN-08.02 1 PROHIBIT INSTRUCTIONAL AND

CONTROL

D1 / IN101 TELECOM ROOM REFER TO PAGE 279 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 9" INSTALLED AT ALL NEW TELECOM ROOMS MOUNTED

DIRECTLY ABOVE ROOM NAME SIGN

Grand total: 3

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

C-1/ SDC SEALED CONCRETE WITH STATIC DISSIPATIVE COATING SEALED CONCRETE* - - - - - TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE SEALER

F-1 FILM 3M* FASARA 7725SE-324 FROSTED CRYSTAL - 08 87 33 WINDOW FILM

P-1 PAINT CALIFIRNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

RB-1 RESILIENT BASE JOHNSONITE* TRADITIONAL TOE BASE BEIGE 49 4" 09 65 13

TR-1 TRIM SCHLUTER * - RENO-U SATIN ANODIZED ALUMINUM - 09 30 13 FLOOR TRANSITION

WD PLYWOOD FIRE TREATED PLYWOOD* - - HIGH GLOSS WHITE MPI (MASTER PAINTERS INSTITUTE)

67 OR SIM

4' X 8' - PLYWOOD TO BE PAINTED WITH 2 COATS OF FIRE RESISTANT PAINT; FIRE

RATING STAMPS SHALL NOT BE PAINTED OVER

*Materials are approved as basis of design, all material substitutions are subject to owner approval. Contractor to provide VA Interior Design Department with samples of all specified finish materials. VA COR/ Interior Design department shall approve all finishes prior to installation.

1/2" = 1'-0" F7

ROOM FINISH DIAGRAM - BASEMENT LEVEL - RM 015 - NEW

Number Revisions: Date:

1 Addendum 1 02/25/2026

02/25/2026

Sheets
16A-400 - ARCHITECTURAL ENLARGED VIEWS - BASEMENT & FIRST LEVELS
16IN101 - INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES

File details come from the government source that posted it. Updated .