This is a set of architectural drawings and specifications for hazardous material abatement work at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts, as part of the EHRM Infrastructure Upgrades project (Project Number 518-22-700).

The contract requires comprehensive removal and disposal of asbestos-containing materials (ACM) and lead-based paint (LBP) throughout the facility in compliance with OSHA regulations (29 CFR 1926.1153 and 29 CFR 1910.134), EPA standards, and Massachusetts state requirements. The contractor must employ MAS-licensed asbestos and lead abatement specialists, establish written standard operating procedures for worker and public protection, and implement containment barriers and negative pressure systems with HEPA filtration. Specific abatement locations identified include pipe insulation, fittings, transite panels at radiators, and lead-containing paint in at least 95 square feet of space distributed across multiple rooms (153 SF, 145 SF, 99 SF, 44 SF, 32 SF, and 185 SF across rooms 153, 124, 104, 125, 137, and 120 respectively). The contractor must coordinate phasing with the Contracting Officer's Representative (COR) to minimize disruption to ground-level operations, utilize glovebag methods where applicable, maintain means of egress pathways, remove debris daily, and provide waste shipment records within 35 days of removal. Three new telecom rooms are being constructed on the basement, first, and second levels with 1-hour fire and smoke ratings, sealed concrete floors with static dissipative coating, and standardized interior finishes specified in the architectural drawings.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

UP

UP

DN

DN

DN

DN

DN

DN

UP

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND

DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF

MASSACHUSETTS AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF

LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, STATE OF MASSACHUSETTS DEPARTMENT OF PUBLIC HEALTH, AND THE STATE OF

MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL CONSERVATION

2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM

DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. COORDINATE USAGE OF STAIRS VS USAGE OF CHUTE FOR DISPOSAL OF REMOVED HAZARDOUS MATERIAL ON THE FIRST LEVEL. THE ABATEMENT

CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE

REGULATIONS. WHERE OVERLAPS OCCUR, THE MOST STRINGENT REQUIREMENTS APPLY.

4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A MAS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A MAS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS

SHALL BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR

ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR

ASBESTOS EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE

ENVIRONMENT.

8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED

MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT

DOCUMENTS. THE OWNER OR THEIR REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR LOST,

DAMAGED OR STOLEN ITEMS.

10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, MASDPH, AND THE MASDEC.

12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS

BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE

PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS

SHOWING THE NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES.

THE GROUND LEVEL IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG

METHODS ON THE GROUND LEVEL TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD

ABATEMENT REQUIREMENTS, AND THE COR.

18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR.

ALL OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL

BE RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM

ON HVAC EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS.

COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED

TO THE OWNER WITHIN 35 DAYS OF WASTE LEAVING THE SITE.

22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, SPECIFIC ORIGINAL FLOORING MATERIALS, AND IN TRANSITE PANELS AT RADIATORS BELOW WINDOWS. NO ASBESTOS CONTENT HAS BEEN IDENTIFIED IN SAMPLING OF CEILING TILES, DRYWALL, JOINT COMPOUND, SKIM COAT, FIBERBOARD, FIRESTOP, COVE BASE, MASONRY WINDOW CAULK, BATHROOM CAULK, TILE GROUT, TILE GLUE, CERAMIC TILES, OR SPECIFIC FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY.

SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION.

UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR ANALYZE BULK SAMPLES OF

SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY

BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

24. COORDINATE WITH INDUSTRIAL HYGIENIST FOR REVIEW OF MONITORING, AND FINAL CONFIRMATION OF

ABATED AREAS, REFER TO SPEC SECTION 02 82 13.13

KEYNOTES#

QUANTITIES - ACM /LEAD MATERIALSLEGEND

REMOVAL PATH

SAMPLE

HA ## SAMPLE LOCATION

ASBESTOS /

LEAD PAINT

NOT ALL SAMPLE LOCATIONS SHOWN FOR CLARITY. ONLY

POSITIVE OR POSITIVE STOP SAMPLES ARE LOCATED.

SAMPLE NUMBER PER SURVEY REPORT FROM TERRACON.

REFER TO SURVEY REPORT FOR SPECIFIC SAMPLE

INFORMATION

PATH INDICATED IS PROVIDED FOR INTENT ONLY.

COORDINATE FINAL REMOVAL PATHWAYS, PHASING, AND

METHODS WITH GENERAL CONTRACTOR AND COR.

95 SF LEAD CONTAINING PAINT TO BE ABATED

SAMPLE

PNT ##

ROOM

145 SF

COPY

ROOM

99 SF

ROOM

32 SF

STORAGE

44 SF

COMP RM

185 SF

CLASSROOM

120120

OPERATION

120A120A

OFFICE

119119 ROOM

118118

TOILET

119A119A

ROOM

119B119B

TOILET

116116

ROOM

115A115A

OFFICE

115115

CONF. RM

112112

OFFICE

111111

OFFICE

110110

ELECTRICAL

109109

STORAGE

107107

ELECTR.

108108

OFFICE

106106

CLASS RM

113113

STAIR

NO 5NO 5

OFFICE

105105

OFFICE

104104

EDUCATION

103103

STORAGE

102102

CONTROL

101101

ELEVATOR

TOILET

154154

STORAGE

155A155A

LOBBY

100100

COMP RM

152152

ROOM

151151

ELECTR.

150150

ELECTRICAL

149149

OFFICE

148148

TOILET

140140

ROOM

141141

OFFICE

142142

OFFICE

147B147B

OFFICE

143143

OFFICE

146146

OFFICE

144144

CONFERENCE

RM

145145

STAIR

NO 1NO 1

RESTROOM

138138

OFFICE

135135

ROOM

134134

OFFICE

133133

OFFICE

132132

OFFICE

131131

STAIR

NO 2NO 2

UTILITY

130130OFFICE

129129

ROOM

128A128A

STORAGE

128A128A

ROOM

127B127B

ELECTRICAL

127A127A

OFFICE

123123

KITCHEN

122122

CONFERENCE

RM

127127

STAIR

NO 3NO 3

RECORDS

121121

STAIR

NO 4NO 4

CORRIDOR

C1-6C1-6

CORRIDOR

C1-5C1-5

CORRIDOR

C1-1C1-1

CORRIDOR

C1-2C1-2

CORRIDOR

C1-3C1-3

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:2

A

M

61H-101

HAZARDOUS MATERIAL ABATEMENT PLAN -

FIRST LEVEL

518-22-700

06/04/2025 M PERKINS J SONES

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1/8" = 1'-0" F2

HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL

1 PRIOR TO DEMO PROVIDE CONTAINMENT BARRIER AND PERSONNEL DECONTAMINATION FACILITY PER 02 82 11 DURING ABATEMENT WORK. COORDINATE TIMING WITH COR (48 HR MAX) TO MINIMIZE

DISRUPTION TO OCCUPIED SPACES.

2 ABATE AND REMOVE LEAD BASED PAINT THROUGHOUT ENTIRE ROOM. ASSUMED DOOR FRAMES ALSO CONTAIN LEAD BASED PAINT. DISPOSE OF FRAME PROPERLY WHERE FRAME IS BEING REMOVED.

WHERE FRAME IS TO REMAIN, ABATE AND REMOVE PAINT ON DOOR FRAME.

Number Revisions: Date:

1 Addendum 1 02/25/2026

02/25/2026

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED

AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,

AND CAMPUS STANDARDS.

E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

G. SEE TYPICAL CEILING DETAILS ON SHEET A-531

H. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

61A-400

B8

TELECOM

ROOM

B13

185 SF

I

J

8 9

+- 6'-1"

5 8

+- 5'-6 7/8" CORRIDOR

B13JB13J

'-1

1/

2"

6'-10" 8' -6

5 8

15 16

RESTROOM

B13H-B

48 SF

Room B13H-A

48 SF

Room B13

94 SF

TYP.

B

H W

-S H

-3 F

I

J

8 9

12'-5 5/8"

'-3

/4

TELECOM

ROOM

B13

185 SF

B

A

A6

E X

IS

T

V

IF

'-0

EXIST (VIF)

+- 1'-3 1/8"

A

ALIGN

B

B

CORRIDOR

B13JB13J

EXIST (VIF)

+- 5'-6 7/8"

RESTROOM

B13H-B

48 SF

Room B13H-A

48 SF

Room B13

94 SF

I

J

8 9

TELECOM

ROOM

B13

185 SF

EXIST (VIF)

+- 1'-3 1/8"

E X

IS

T

V

IF

'-0

CORRIDOR

B13JB13J

I

J

8 9

TELECOM

ROOM

197 SF

TYP.

TYP.

(EXIST VIF)

11'-10"

(E X

IS

T

V

IF

'-8

/8 "B

H W

-S H

-3 F

B

B

B

A4

B

A 4B

2' -1

0"

I

J

8 9

5 8

'-5

/2

5'-4"

5 8

COPY

ROOM

99 SF

ROOM

32 SF

STORAGE

44 SF

COPY

ROOM

99 SF

ROOM

32 SF

STORAGE

44 SF

I

J

8 9

TELECOM

ROOM

197 SF

61A-400

B4

TELECOM

ROOM

124124

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:2

A

M

61A-400

ARCHITECTURAL ENLARGED VIEWS - BASEMENT

AND FIRST LEVEL

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1 REMOVE EXISTING DOOR AND FRAME

2 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A: 10B: C

CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN 75

FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE THE

NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A NEW FEC

FOR EACH TR IN THE SCOPE

3 EXISTING WALL TO BECOME 1 HOUR FIRE AND SMOKE-RATED. PATCH

AND SEAL ALL PENETRATIONS AS NECESSARY.

4 REMOVE EXTENT OF FLOORING FINISH

5 REMOVE EXISTING FLOORING, ADHESIVES, AND WALL BASE

6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA

DURING ACTIVITIES WHICH PRODUCE DUST

7 REMOVE EXISTING ACOUSTICAL CEILING AND LIGHTS. MODIFY

AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR

EXISTING CEILING ITEMS TO REMAIN.

8 ALL ITEMS/EQUIPMENT TO BE REMOVED FROM SPACE PRIOR TO

DEMO

9 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL IN

ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN OR

APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE COR

10 INSTALL NEW CEILING AND FINISH. NEW FINISH AND CEILING TYPE

TO MATCH EXISTING FINISH AND TYPE IN ADJACENT AREA

11 EXISTING CEILING TO REMAIN

12 TELECOM ROOM TO BE OPEN TO DECK ABOVE

13 INSTALL NEW FLOORING FINISH. NEW FINISH TO MATCH EXISTING

FINISH IN ADJACENT AREA. VA COR/INTERIOR DESIGNER TO PROVIDE

FINISH SELECTION

14 NEW 45 MIN. FIRE RATED DOOR AND FRAME. SEE DOOR SCHEDULE

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY DOOR

AS REQUIRED FOR NEW ACCESS CONTROL HARDWARE.

15 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

16 EXISTING CMU WALL

1/32" = 1'-0" F8

BASEMENT LEVEL REFERENCE PLAN

1/4" = 1'-0" D8

ARCHITECTURAL FLOOR PLAN - BASEMENT

LEVEL - RM C1-62/ C1-17/ C1-59 - DEMO

1/4" = 1'-0" B8

ARCHITECTURAL FLOOR PLAN - BASEMENT

LEVEL - RM B13 - NEW

1/4" = 1'-0" D6

ARCHITECTURAL RCP - BASEMENT LEVEL -

RM C1-62/ C1-17/ C1-59 - DEMO

1/4" = 1'-0" B6

ARCHITECTURAL RCP - BASEMENT LEVEL -

RM B13 - NEW

1/4" = 1'-0"

B4

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 124 - NEW

1/4" = 1'-0" D4

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 124 - DEMO

1/4" = 1'-0"

D2

ARCHITECTURAL RCP - FIRST LEVEL - RM 124

- DEMO

1/4" = 1'-0" B2

ARCHITECTURAL RCP - FIRST LEVEL - RM 124

- NEW

1/32" = 1'-0" F4

FIRST LEVEL REFERENCE PLAN

Number Revisions: Date:

1 Addendum 1 02/25/2026

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED

AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,

AND CAMPUS STANDARDS.

E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

G. SEE TYPICAL CEILING DETAILS ON SHEET A-531

H. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

TELECOM

ROOM

226226

61A-401

B8

I

J

8 9

H W

-S H

-3 F

B

B

B

B

B

A4

A4

BA

TELECOM

ROOM

184 SF

E X

IS

T

V

IF

'-1

0"

EXIST (VIF)

11'-11"

ROOM

229229

CORRIDOR

C2-4C2-4

CORRIDOR

C2-3C2-3

ACTING

CHIEF

CLINICAL

ENGINEER

OFFICE

225225

CORRIDOR

C2-5C2-5

TYP.

ALIGN

ALIGN

ALIGN

4' -0

/8

7 1

7 1

7 1

'-1

0"

5'-6"

7' -7

3' -5

/2

2'-2 1/2"

I

J

8 9

COPY

95 SF

WAITING

42 SF

ROOM

37 SF

OFFICE

225225

CORRIDOR

C2-5C2-5

CORRIDOR

C2-4C2-4

ROOM

239239

CORRIDOR

C2-3C2-3

COPY

226226

WAITING

228228

ROOM

227227

CORRIDOR

C2-4C2-4

CORRIDOR

C2-5C2-5

OFFICE

225225

ROOM

239239

CORRIDOR

C2-3C2-3

I

J

8 9

TELECOM

ROOM

226226

ROOM

229229

CORRIDOR

C2-4C2-4

CORRIDOR

C2-3C2-3

CORRIDOR

C2-5C2-5

ACTING

CHIEF

CLINICAL

ENGINEER

OFFICE

225225

ACOUSTICAL OR RATED

FLEXIBLE SEALANT

FLOOR LINE

ADD ONE LAYER OF 5/8" GWB,

ONE-SIDE WITH APPROVED UL

SETTING COMPOUND BETWEEN

LAYERS AND FASTENED TO

WALL AS REQUIRED, AT

EXISTING GWB WALL

ASSEMBLIES

STRUCTURAL DECK

EXISTING METAL STUDS AND

BATT INSULATION TO REMAIN

A/C GRADE, 3/4" FIRE-TREATED

PLYWOOD, ADHERED TO CONCRETE

AT EXISTING CONCRETE WALL

ASSEMBLIES

BOTTOM OF PLYWOOD

TO BE AT 12" AFF

UL DESIGN V497

1-HOUR PARTITION RATED FROM BOTH SIDES

EXISTING GWB OR

CONCRETE WALL

ASSEMBLY, WHERE OCCURS

SIDE OF

EXISTING

ROOM OR

CORRIDOR TO

REMAIN

61A-512

E5

61A-512

B4

B3

TYPICAL FRAME

H

E

IG

H T

2" WIDTH 2"

B5

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

ACOUSTICAL OR RATED

SEALANT BOTH SIDES

FLOOR LINE

5/8" GWB BOTH SIDES

SOUND ATTENUATION

BATTS (SAB) PER

SCHEDULE.

CEILING LINE

STRUCTURAL DECK

METAL STUDS, SIZE

PER SCHEDULE

61A-512

E5

A/C GRADE, 3/4" FIRE-

TREATED PLYWOOD

61A-512

B4

AT FIRE RATED

PARTITIONS

AT SMOKE RATED

PARTITIONS

BOTTOM OF PLYWOOD TO

BE AT 12" AFF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:2

A

M

61A-401

ARCHITECTURAL ENLARGED VIEWS - SECOND

LEVEL

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1 ALL ITEMS/EQUIPMENT TO BE REMOVED FROM SPACE PRIOR TO

DEMO

2 NEW 45 MIN. FIRE RATED DOOR. SEE DOOR SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY DOOR

AS REQUIRED FOR NEW ACCESS CONTROL HARDWARE.

3 EXISTING WALL TO BECOME 1 HOUR FIRE AND SMOKE-RATED.

PATCH AND SEAL ALL PENETRATIONS AS NECESSARY.

4 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:

10B: C CLEAN AGENT FIRE EXTINGUISHER LOCATED NO

GREATER THAN 75 FEET AWAY FROM THE NEW TR. CONTRACTOR

TO COORDINATE THE NEW LOCATION WITH THE COR.

CONTRACTOR SHALL BID A NEW FEC FOR EACH TR IN THE SCOP

5 REMOVE EXISTING DOOR AND FRAME

6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK

AREA DURING ACTIVITIES WHICH PRODUCE DUST

7 REMOVE EXISTING FLOORING, ADHESIVES, AND INSTALL NEW

WALL BASE

8 EXISTING CEILING TO REMAIN

9 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW

WALL IN ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE

WALL SPAN OR APPROPRIATE TRANSITION LOCATION AS

APPROVED BY THE COR

10 AT NEW INFILL, VERIFY SIZE OF EXISTING STUD AND FINISH. NEW

STUD AND FINISH TO MATCH EXISTING

11 REMOVE EXISTING ACOUSTICAL CEILING AND LIGHTS. MODIFY

AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED FOR

EXISTING CEILING ITEMS TO REMAIN.

12 TELECOM ROOM TO BE OPEN TO DECK ABOVE

13 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

1/32" = 1'-0" F8

SECOND LEVEL REFERENCE PLAN

1/4" = 1'-0" B8

ARCHITECTURAL FLOOR PLAN - SECOND

LEVEL - RM 226 - NEW

1/4" = 1'-0" D8

ARCHITECTURAL FLOOR PLAN - SECOND

LEVEL - RM 228/230/229 - DEMO

1/4" = 1'-0"

D6

ARCHITECTURAL RCP - SECOND LEVEL - RM

228/230/229 - DEMO

1/4" = 1'-0" B6

ARCHITECTURAL RCP - SECOND LEVEL - RM

226 - NEW

NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED WALLS: UL

V438, UL U411

(TYPE B) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

B 2 1/2" 3/4" 45

1/4" = 1'-0" B1

DOOR AND FRAME TYPES ELEVATIONS

3" = 1'-0"

B5

HOLLOW METAL JAMB DETAIL

3" = 1'-0" B3

HOLLOW METAL HEAD DETAIL

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL

BASEMENT B13 TELECOM ROOM B13 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 B3/61A-401 B5/61A-401 F1/61IN101 45 MIN HW-SH-3F SEE SPEC 1

LEVEL 1 124 TELECOM ROOM 124 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 B3/61A-401 B5/61A-401 F1/61IN101 45 MIN HW-SH-3F SEE SPEC 1

LEVEL 2 226 TELECOM ROOM 226 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 B3/61A-401 B5/61A-401 F1/61IN101 45 MIN HW-SH-3F SEE SPEC 1

NOTE: FIRE RESISTANCE TEST FOR ONE HOUR RATED WALLS: UL

U465

(TYPE A) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

A4 4" 5 1/4" 35

A6 6" 7 1/4" 45

1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

Number Revisions: Date:

1 Addendum 1 02/25/2026

"FIRE-RATED WALLS"- ADDITIONAL NOTES:

1. CONDITIONS INDICATED TO SHOW DESIGN INTENT. THEY ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR A UL-APPROVED TOP-OF-WALL DESIGNS THAT ARE APPROPRIATE FOR CONDITIONS.

2. REFER TO SECTION 07 84 00 / FIRESTOPPING FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITION FOR FIRE-RATED WALLS.

SLOTTED TOP

TRACK

STUD

DESIGN BASIS: UL-HW-D-0082

CONCRETE SLAB

DESIGN BASIS: UL-HW-D-0042

METAL DECK

(PERPENDICULAR TO FLUTES)

/8

DESIGN BASIS: UL-HW-D-0264

METAL DECK

(PARALLEL TO FLUTES)

1" 1" 2"x20 GA

STRAPS @ 16"

O.C.

DESIGN BASIS: UL-HW-D-0259

STEEL BEAM

20 GA Z-BARS

TO

ACCOMMODATE

SFRM

SPRAY-APPLIED

FIRE-RESISTIVE

MATERIAL

(SFRM)

SAB

1 OR 2 LAYERS OF GWB;

SEE WALL TYPE

FIRE STOP SEALANT

FIRE STOP JOINT

SPRAY

MINERAL WOOL

FORMING MATERIAL

/8

/8

FIRE STOP JOINT

SPRAY

SLOTTED TOP

TRACK

STUD

SAB

1 OR 2 LAYERS OF GWB;

SEE WALL TYPE

/8

MINERAL WOOL

FORMING MATERIAL

SLOTTED TOP

TRACK

STUD

CONCRETE SLAB METAL DECK

(PERPENDICULAR TO FLUTES)

/8

/8

METAL DECK

(PARALLEL TO FLUTES)

1" 1"

/8

SLOTTED TOP

TRACK

2"x20 GA

STRAPS @ 16"

O.C.

STEEL BEAM

/8

20 GA Z-BARS

TO

ACCOMMODATE

SFRM

SPRAY-APPLIED

FIRE-RESISTIVE

MATERIAL

(SFRM)

SAB

GWB

ACOUSTICAL SEALANT

CUT ONE LAYER GWB TO

FOLLOW PROFILE OF DECKING.

SEAL CONTINUOUSLY WITH

ACOUSTICAL SEALANT.

FILL FLUTE VOID W/

SAB

GWB SOUND AND

SMOKE CLOSURE

STRIP SECURE TO

STRUCTURE AND SEAL

WITH ACOUSTICAL

SEALANT

ACOUSTICAL

SEALANT (BOTH

SIDES)

STUD

SAB

GWB

ACOUSTICAL SEALANT

(BOTH SIDES)

"SMOKE PARTITIONS AND SOUND-CONTROL WALLS"- ADDITIONAL NOTES:

1. UPGRADE TO DETAIL "B4" WHERE WALL IS DESIGNATED WITH A FIRE-RESISTANCE RATING.

2. FILL VOIDS WITH SOUND ATTENUATION BATTS (SAB).

3. SOUND WALLS AND SMOKE PARTITIONS REQUIRE THAT AT LEAST ONE LAYER OF GWB BE CUT TO FOLLOW UNDULATING SURFACES OF SUPERSTRUCTURES INCLUDING BUT NOT LIMITED TO FLUTES METAL DECKING. JOINT GWB TO SUPERSTRUCTURE WITH A CONTINUOUS BEAD OF ACOUSTICAL SEALANT.

4. BUILDING CODE REQUIRES THAT "SMOKE PARTITIONS" BE SEALED TO STRUCTURE AS INDICATED TO SUCCESSFULLY "….LIMIT THE PASSAGE OF SMOKE….".

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:2

A

M

61A-512

ARCHITECTURAL PARTITION HEAD DETAILS 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

3" = 1'-0" B4

HEAD-OF-WALL CONDITIONS - STUD WALLS - FIRE RATED WALLS

3" = 1'-0" E5

HEAD-OF-WALL CONDITIONS - STUD WALLS - SMOKE PARTITIONS AND SOUND CONTROL WALLS

NOTE:

STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION

TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE

USED. CONTRACTOR SHALL VERIFY ACTUAL CONDITIONS

ON-SITE.

Number Revisions: Date:

1 Addendum 1 02/25/2026

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

GENERAL INTERIOR NOTES

KEYNOTES

GENERAL FINISH NOTES:

1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND

INSTALLATION REQUIREMENTS.

2. REFER TO THIS SHEET FOR FINISH LEGEND AND ROOM FINISH

SCHEDULE.

3. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN

FOR CONSISTENCY.

SUBSTITUTION NOTES:

1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR

SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.

TRANSITION NOTES:

1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.

2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT

DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR

WHEN DOOR PANEL IS IN THE CLOSED POSITION.

SIGNAGE NOTES:

1. REFER TO THIS SHEET SERIES SHEETS FOR SIGNAGE INFORMATION,

REFER TO SPECIFICATIONS FOR ADDITIONAL SIGNAGE,

IDENTIFICATION AND SYSTEMS/EQUIPMENT LABELING

REQUIREMENTS.

PAINTING NOTES:

1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED

ITEMS OR INSTALLER FINISHED ITEMS.

3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.

PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD

TO ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.

CODE NOTES:

1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE

WITH IBC 2024 803.13 INTERIOR WALL AND CEILING FINISH

REQUIREMENTS BY OCCUPANCY

INSTALLATION NOTES:

1. PROVIDE BACKING FOR ALL WALL MOUNTED EQUIPMENT.

MATERIAL FLOOR CHANGE (REFER TO THIS SHEET FOR DETAILS)

INTERIOR FINISH SYMBOLS

SEALED CONCRETE WITH STATIC DISSIPATIVE COATING (C-1/SDC)

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

WALL BASE

JOHNSONITE*

BEIGE 49

RB-1

PAPER INSERT CARRIER, MAGNETIC

MOUNT, WITH NON-GLARE LENS

TEXT: 5/8"H LASER-PRINTED TEXT,

HELVETICA MEDIUM

COLOR: TO MATCH STATION

STANDARDS

1-1/2" x 1/32" ADA

TACTILE NUMERALS

AND GRADE II BRAILLE234

9"

Restricted Access

5-3/16" X 9" CLEAR

ACETATE INSERT W/

COPY

9"X9" MAGNETICALLY

REMOVABLE SIGN

(ONE-PIECE)

RED SYMBOL AND

BLACK TEXT

1/2" 9" 1/2"

/2

/2

QUARTER-ROUND

SILVER FRAME

EXISTING FLOORING

TO BE REMOVED

TOP OF SLAB

EXISTING

FLOORING TO

REMAIN, EXISTING

ROOM SIDE EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

RESILIENT BASE AS

SCHEDULED, EACH

SIDE OF NEW WALL

INSTALL 3/4"

PLYWOOD, MOUNT

BOTTOM OF

PLYWOOD 12" AFF

ADJACENT SPACE

TELECOM

ROOM SIDE

PARTITION AS SCHEDULED

EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

LOCATION OF FLOOR

FINISH CHANGE; SEAM

OR ADAPTER

TRANSITION SHALL

OCCUR AT CENTERLINE

OF DOOR IN CLOSED

POSITION

DOOR AS SCHEDULED

EXISTING FLOORING

TOP OF SLAB

CORRIDOR SIDE

DOOR FRAME BEYOND

C CENTER LINE OF DOORL

TRANSITION STRIP

(TR-1) OR EQUAL,

REFER TO SCHEDULE

FOR INFORMATION

TELECOM ROOM SIDE

SIGNAGE REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

SIGN SYMBOL LEGEND

TELECOM ROOM FINISH DIAGRAM,

CONTRACTOR TO REFERENCE

ARCHITECTURE FOR ACTUAL WALL

CONSTRUCTION LOCATIONS

2 5 6

IN-08.02IN-01.31

IN-04.01A

F4

61IN101

TYP.

F1

61IN101

TYP.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:1

:2

A

M

61IN101

INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

NTS

C1

COLOR BOARD

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

BASEMENT B13 TELECOM ROOM C-1/ SDC RB-1 GWB P-1/ WD GWB P-1/ WD GWB P-1/ WD GWB P-1/ WD OPEN

LEVEL 1 124 TELECOM ROOM C-1/ SDC RB-1 GWB P-1/ WD GWB P-1/ WD GWB P-1/ WD GWB P-1/ WD OPEN

LEVEL 2 226 TELECOM ROOM C-1/ SDC RB-1 GWB P-1/ WD GWB P-1/ WD GWB P-1/ WD GWB P-1/ WD OPEN

BUILDING SIGNAGE SCHEDULE

VERSION

TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE

ADA

BRAILLE TEXT COLOR BACKGROUND COLOR

DIMENSIONS

CommentsSIGN_HEIGHT SIGN_WIDTH MOUNTING HEIGHT

IN-01.31 2 FIRE IDENTIFICATION SIGN D6 / IN101 FEC REFER TO PAGE 429 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO WHITE RED 9" 9" 6' - 8" INSTALLED AT FIRE EXTINGUISHER CABINETS AT ALL

NEW TELECOM ROOMS

IN-04.01A 2 ROOM NUMBER IDENTIFICATION D3 / IN101 TELECOM ROOM REFER TO PAGE 259 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

YES REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 0" INSTALLED AT ALL NEW TELECOM ROOMS

IN-08.02 2 PROHIBIT INSTRUCTIONAL AND

CONTROL

D1/ IN101 TELECOM ROOM REFER TO PAGE 279 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 9" INSTALLED AT ALL NEW TELECOM ROOMS MOUNTED

DIRECTLY ABOVE ROOM NAME SIGN

Grand total: 6

3" = 1'-0" E3

IN-04.01A SIGN DETAIL - PRIMARY ROOM

IDENTIFICATION

3" = 1'-0"

E1

IN-08.02 SIGN DETAIL - PROHIBIT

INSTRUCTIONAL AND CONTROL

NTS

C4

EXAMPLE OF EXISTING SIGNAGE

6" = 1'-0" F4

RESILIENT BASE (TOE BASE)

6" = 1'-0"

F1

THRESHOLD - CONCRETE TO EXISTING FLOORING

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

C-1/ SDC SEALED CONCRETE WITH DISSIPATIVE STATIC COATING SEALED CONCRETE* - - - - - TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE SEALER

P-1 PAINT CALIFORNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

RB-1 RESILIENT BASE JOHNSONITE* TRADITIONAL TOE BASE BEIGE 49 4" 09 65 13

TR-1 TRIM SCHLUTER * - RENO-U SATIN ANODIZED ALUMINUM - 09 30 13 FLOOR TRANSITION

WD PLYWOOD FIRE TREATED PLYWOOD* - - HIGH GLOSS WHITE MPI (MASTER PAINTERS INSTITUTE)

67 OR SIM

4' X 8' - PLYWOOD TO BE PAINTED WITH 2 COATS OF FIRE RESISTANT PAINT; FIRE

RATING STAMPS SHALL NOT BE PAINTED OVER

1 REMOVE EXISTING FLOORING, ADHESIVES, AND INSTALL NEW WALL

BASE

2 EXISTING WALLS ARE TO BE PATCHED AND PAINTED. SEE ROOM

FINISH SCHEDULE THIS SHEET FOR FINISHES.

3 ALL WALLS TO RECEIVE NEW PLYWOOD, COORDINATE WITH

ELECTRICAL DRAWINGS FOR FIXTURE LOCATIONS

4 PROVIDE NEW ROOM SIGNAGE, SEE SIGNAGE SCHEDULE THIS

SHEET

5 REFER TO ARCHITECTURAL PLANS FOR DETAILED ROOM

CONFIGURATION INFORMATION

6 TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE

SEALER

REFER TO THIS SHEET FOR ROOM FINISH SCHEDULE & FINISH LEGEND

1/2" = 1'-0" F7

TYPICAL TELECOM ROOM FINISH DIAGRAM

3" = 1'-0" E6

IN-01.31 SIGN DETAIL - FIRE EQUIPMENT

IDENTIFICATION SIGN

*Materials are approved as basis of design, all material substitutions are subject to owner approval. Contractor to provide VA Interior Design Department with samples of all specified finish materials. VA COR/ Interior Design department shall approve all finishes prior to installation.

Number Revisions: Date:

1 Addendum 1 02/25/2026

Sheets
61A-400 - ARCHITECTURAL ENLARGED VIEWS - BASEMENT AND FIRST LEVEL
61A-401 - ARCHITECTURAL ENLARGED VIEWS - SECOND LEVEL
61A-512 - ARCHITECTURAL PARTITION HEAD DETAILS
61H-101 - HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL
61IN101 - INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES