Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf

PDF 1 MB Posted

Attached to
Y1DA--518-22-700 EHRM Infrastructure Upgrades Construction Bedford VAMC
Solicitation number
36C77626R0003
Issued by

About this file

This is an architectural drawing set for interior construction work at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts, part of the EHRM Infrastructure Upgrades project (Project Number 518-22-700).

The work involves reconfiguration of Office Room 104 on the first level, including demolition of existing construction and installation of new partitions, doors, and finishes. Key requirements include: installation of a new 3'-6" by 7'-0" hollow metal door with 45-minute fire rating (Door No. HW-SH-3F) and coordinating frame; construction of new interior walls using metal studs (4" or 6" width per schedule) with 5/8" gypsum wallboard both sides, sound attenuation batts, and acoustical or rated sealant; painting of new construction in California Paints Manchester Tan HC-81 (P-1) and metal doors and trim in California Paints White Down OC-131 (P-2); repair of existing finishes as needed; temporary dust barriers during construction; and handling of furnishings and equipment relocation. The contractor is responsible for field verification of all dimensions and conditions at time of bidding, abatement of potential asbestos-containing materials at floor penetrations, and compliance with manufacturer warranties for any systems furniture disassembly and reassembly. The drawing set was issued for construction on June 4, 2025, with Addendum 1 issued on February 25, 2026.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

C. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

D. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

E. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

E5

TYPICAL FRAME

H E

IG

H

T

2" WIDTH 2"

E7

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

81A-400

B7

OFFICE

104104

B

A

A6 A4

H W

-S H

-3 F

OFFICE

104104

OFFICE

105105

OFFICE

101101

OFFICE

1031033

B

A

OFFICE

112 SF

OFFICE

105105

OFFICE

101101

OFFICE

103103

OFFICE

104104

OFFICE

105105

OFFICE

101101

OFFICE

103103

OFFICE

104104

OFFICE

105105

OFFICE

101101

OFFICE

103103

ACOUSTICAL OR RATED

SEALANT BOTH SIDES

FLOOR LINE

5/8" GWB BOTH SIDES

SOUND ATTENUATION

BATTS (SAB) PER

SCHEDULE.

CEILING LINE

STRUCTURAL DECK

METAL STUDS, SIZE

PER SCHEDULE

81A-512

E5

A/C GRADE, 3/4" FIRE-

TREATED PLYWOOD

81A-512

B4

AT FIRE RATED

PARTITIONS

AT SMOKE RATED

PARTITIONS

BOTTOM OF PLYWOOD TO

BE AT 12" AFF

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:0

:0

P

M

81A-400

ARCHITECTURAL ENLARGED VIEWS & INTERIOR

FINISH SCHEDULE

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

NTS

D2

COLOR BOARD

3" = 1'-0" E5

HOLLOW METAL HEAD DETAIL

3" = 1'-0"

E7

HOLLOW METAL JAMB DETAIL

1/4" = 1'-0" E2

DOOR AND FRAME TYPES ELEVATIONS

1 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA

DURING ACTIVITIES WHICH PRODUCE DUST

2 REMOVE EXISTING DOOR AND FRAME.

3 NEW 45 MIN FIRE RATED DOOR. SEE DOOR SCHEDULE AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY DOOR AS

REQUIRED FOR NEW ACCESS CONTROL HARDWARE.

4 EXISTING CEILING TO REMAIN.

5 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL IN

ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN OR

APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE COR.

6 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

1/16" = 1'-0" F7

FIRST LEVEL REFERENCE PLAN

1/4" = 1'-0" B7

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- ROOM 104 - NEW

1/4" = 1'-0" D7

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- ROOM 104 - DEMO

1/4" = 1'-0" B5

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - ROOM 104 - NEW

1/4" = 1'-0" D5

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - ROOM 104 - DEMO

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB GROUP ELECTRICAL

LEVEL 1 104 OFFICE 104 3' - 6" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 45 MIN, HW-SH-3F SEE ELEC 1

NOTE: FIRE RESISTANCE TEST FOR ONE HOUR RATED WALLS: UL

U465

(TYPE A) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

A4 4" 5 1/4" 35

A6 6" 7 1/4" 35

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

P-1 PAINT CALIFORNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

LEVEL 1 104 OFFICE EXISTING EXISTING GWB EXISTING GWB EXISTING GWB EXISTING GWB EXISTING EXISTING REPAIR EXISTING FINISHES AS NEEDED FOR NEW DOOR INSTALLATION

NOTES

1. SEE SPECIFICATION 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

Number Revisions: Date:

1 Addendum 1 2/25/2026

02/25/2026

Sheets
81A-400 - ARCHITECTURAL ENLARGED VIEWS & INTERIOR FINISH SCHEDULE

File details come from the government source that posted it. Updated .