Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf
PDF 4 MB Posted
- Solicitation number
- 36C77626R0003
About this file
This document is an architectural drawing set for hazardous material abatement work at the Edith Nourse Memorial Veterans Hospital (EHRM) Infrastructure Upgrades project located at 200 Springs Road, Bedford, Massachusetts. The project is managed by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management.
The work involves the removal and abatement of asbestos-containing materials (ACM) and lead-based paint (LBP) from the facility's first level. Key requirements include: compliance with federal regulations from OSHA (29 CFR 1926.1153 and 1910.134 for silica dust control), EPA, NIOSH, and Massachusetts Department of Public Health and Environmental Conservation; removal performed only by Massachusetts-licensed asbestos and lead abatement contractors; containment and decontamination procedures with HEPA-filtered negative pressure equipment and airlocks; daily debris removal with proper hazardous waste packaging and labeling; waste shipment records to be provided within 35 days of site departure; and coordination with the Contracting Officer's Representative (COR) for work scheduling, utility shutdowns, and staging areas. The contractor must assume all untested original building materials contain asbestos or lead unless confirmed otherwise through testing. Confirmed ACM locations include pipe insulation, fittings, specific flooring materials, and transite panels at radiators. Lead-based paint has been identified in at least one facility area with approximately 260 square feet requiring abatement. The ground level must remain operational during construction, requiring glovebag methods to minimize disruption. All work shall maintain means of egress pathways and include protection of controls, conduit, electrical panels, and other building components scheduled to remain.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
UP
DN
DN
DN
HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES
1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND
DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF
MASSACHUSETTS AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF
LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, STATE OF MASSACHUSETTS DEPARTMENT OF PUBLIC HEALTH, AND THE STATE OF
MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL CONSERVATION
2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134
3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.
CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM
DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. COORDINATE USAGE OF STAIRS VS USAGE OF CHUTE FOR DISPOSAL OF REMOVED HAZARDOUS MATERIAL ON THE FIRST LEVEL. THE ABATEMENT
CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE
REGULATIONS. WHERE OVERLAPS OCCUR, THE MOST STRINGENT REQUIREMENTS APPLY.
4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A MAS LICENSED
ASBESTOS ABATEMENT CONTRACTOR.
5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A MAS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS
SHALL BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.
6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL
CONTRACTOR, AND THE COR.
7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR
ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR
ASBESTOS EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE
ENVIRONMENT.
8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.
9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED
MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT
DOCUMENTS. THE OWNER OR THEIR REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR LOST,
DAMAGED OR STOLEN ITEMS.
10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE
NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.
11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE
LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, MASDPH, AND THE MASDEC.
12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.
13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS
BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.
14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION
MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.
15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE
PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS
SHOWING THE NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.
16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES.
THE GROUND LEVEL IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG
METHODS ON THE GROUND LEVEL TO MINIMIZE IMPACT ON BUILDING OPERATIONS.
17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD
ABATEMENT REQUIREMENTS, AND THE COR.
18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR.
ALL OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.
19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.
20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL
BE RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM
ON HVAC EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.
21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS.
COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED
TO THE OWNER WITHIN 35 DAYS OF WASTE LEAVING THE SITE.
22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, SPECIFIC ORIGINAL FLOORING MATERIALS, AND IN TRANSITE PANELS AT RADIATORS BELOW WINDOWS. NO ASBESTOS CONTENT HAS BEEN IDENTIFIED IN SAMPLING OF CEILING TILES, DRYWALL, JOINT COMPOUND, SKIM COAT, FIBERBOARD, FIRESTOP, COVE BASE, MASONRY WINDOW CAULK, BATHROOM CAULK, TILE GROUT, TILE GLUE, CERAMIC TILES, OR SPECIFIC FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY.
SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION.
UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR ANALYZE BULK SAMPLES OF
SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.
23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY
BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
24. COORDINATE WITH INDUSTRIAL HYGIENIST FOR REVIEW OF MONITORING, AND FINAL CONFIRMATION OF
ABATED AREAS, REFER TO SPEC SECTION 02 82 13.13
KEYNOTES#
QUANTITIES - ACM /LEAD MATERIALSLEGEND
REMOVAL PATH
SAMPLE
HA ## SAMPLE LOCATION
ASBESTOS /
LEAD PAINT
NOT ALL SAMPLE LOCATIONS SHOWN FOR CLARITY. ONLY
POSITIVE OR POSITIVE STOP SAMPLES ARE LOCATED.
SAMPLE NUMBER PER SURVEY REPORT FROM TERRACON.
REFER TO SURVEY REPORT FOR SPECIFIC SAMPLE
INFORMATION
PATH INDICATED IS PROVIDED FOR INTENT ONLY.
COORDINATE FINAL REMOVAL PATHWAYS, PHASING, AND
METHODS WITH GENERAL CONTRACTOR AND COR.
260 SF LEAD CONTAINING PAINT TO BE ABATED
SAMPLE
PNT ##
OFFICE
OFFICE
106106
ROOM
104104
ROOM
OFFICE
102102
CORRIDOR
TOILET
101101 ROOM
STAIR
KITCHEN
108108
ROOM
OFFICE
109109
OFFICE
124124
HAC
123123
ROOM
ROOM
STAIR
ROOM
-- TOILET
OFFICE
118118
ROOM
ROOM
CORRIDOR
OFFICE
113113
ROOM
112112
OFFICE
114114
BREAK
RM
110110
ROOM
ROOM
SAMPLE
PNT#196
SAMPLE
PNT#199
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
100 Pearl Street, 14th Floor
Hartford, CT 06103
MAT PERKINS
860-270-0753 mat.perkins@triplecaeg.com
A u to d e s k D o c s /3
C
R
.P ro je c t.
-2
-7
.E H
R M
.I U
.B e d fo rd
.M A
.R
/5
-2 -7
.B e d fo rd .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:5
:3
A
M
15H-101
HAZARDOUS MATERIAL ABATEMENT PLAN -
FIRST LEVEL
518-22-700
06/04/2025 M PERKINS J SONES
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
200 Springs Rd, Bedford, MA 01730
1/8" = 1'-0" F5
HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL
1 PRIOR TO DEMO PROVIDE CONTAINMENT BARRIER AND PERSONNEL DECONTAMINATION FACILITY PER 02 82 11 DURING ABATEMENT WORK. COORDINATE TIMING WITH COR (48 HR MAX) TO MINIMIZE
DISRUPTION TO OCCUPIED SPACES.
2 ABATE AND REMOVE LEAD BASED PAINT THROUGHOUT ENTIRE ROOM. ASSUMED DOOR FRAMES ALSO CONTAIN LEAD BASED PAINT. DISPOSE OF FRAME PROPERLY WHERE FRAME IS BEING REMOVED.
WHERE FRAME IS TO REMAIN, ABATE AND REMOVE PAINT ON DOOR FRAME.
Revisions: Date:
Addendum 1 02/25/2026
02/25/2026
UP
DN
UP
DN
UP
DN
SHEET SYMBOL LEGEND
KEYNOTES
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED
AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,
AND CAMPUS STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
H. ALL PHOTOS SHOWN REFLECT EXISTING CONDITIONS AS OF THE
DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE
TIME OF BIDDING.
I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH
MOVING, STORING AND RETURNING FURNISHINGS AND EQUIPMENT
TO THE PROPOSED WORK AREA(S). ANY DISASSEMBLY AND
REASSEMBLY OF SYSTEMS FURNITURE IN THE PROPOSED WORK
AREAS IS THE RESPONSIBILITY OF THE CONTRACTOR AND MUST
FOLLOW THE MANUFACTURER'S WARRANTY.
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
4 5
B
9'-9 3/4"
E X
IS
T
V
IF
'-1
1/
2"
OFFICE
109109
4 5
B2
E X
IS
T
V
IF
'-1
1/
2"
TELECOM
ROOM
124A
121 SF
OFFICE
109109
A3
A3
'-8
/8
8'-7 1/2" +/- 1'-0 1/8"
109A
HW-SH-3F
B
B
J2
OFFICE
261 SF
15A-401
D8
TELECOM
ROOM
124A
121 SF
1/2" 1/2"
VARIES
SEE PLAN
WALL - SEE PLAN
FOR TYPE
SEALANT - EA. SIDE
& ALL AROUND,
TYP.
HOLLOW METAL
FRAME
/2
V
A R
IE
S
S E
E P
L A
N
/2
UNO
4" 2"
ADJACENT WALL
WHERE OCCURS
SEALANT - EA SIDE &
ALL AROUND, TYP.
HOLLOW METAL FRAME
WALL - SEE PLAN
FOR TYPE
C1
TYPICAL FRAME
H E
IG
H
T
2" WIDTH 2"
E1
FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS
F
FLUSH
9'-9 3/4"
ACOUSTICAL OR RATED
FLEXIBLE SEALANT
FLOOR LINE
ADD ONE LAYER OF 5/8" GWB,
ONE-SIDE WITH APPROVED UL
SETTING COMPOUND BETWEEN
LAYERS AND FASTENED TO
WALL AS REQUIRED, AT
EXISTING GWB WALL
ASSEMBLIES
STRUCTURAL DECK
EXISTING METAL STUDS AND
BATT INSULATION TO REMAIN
A/C GRADE, 3/4" FIRE-TREATED
PLYWOOD, ADHERED TO CONCRETE
AT EXISTING CONCRETE WALL
ASSEMBLIES
BOTTOM OF PLYWOOD
TO BE AT 12" AFF
UL DESIGN V497
1-HOUR PARTITION RATED FROM BOTH SIDES
EXISTING GWB OR
CONCRETE WALL
ASSEMBLY, WHERE OCCURS
SIDE OF
EXISTING
ROOM OR
CORRIDOR TO
REMAIN
15A-512
D5
15A-512
B5
ACOUSTICAL OR RATED
SEALANT BOTH SIDES
FLOOR LINE
5/8" GWB BOTH SIDES
SOUND ATTENUATION
BATTS (SAB) PER
SCHEDULE.
CEILING LINE
STRUCTURAL DECK
METAL STUDS, SIZE
PER SCHEDULE
15A-512
D5
A/C GRADE, 3/4" FIRE-
TREATED PLYWOOD
15A-512
B5
AT FIRE RATED
PARTITIONS
AT SMOKE RATED
PARTITIONS
BOTTOM OF PLYWOOD TO
BE AT 12" AFF
OFFICE
124124
OFFICE
124124
LINE OF
STRUCTURE
LINE OF
STRUCTURE
09 29 00
SOUND ATTENUATION BATTS
(SAB), WHERE OCCURS
NOTE:
IF PARTITION TYPE IS USED IN A
CHASE WALL CONDITION, PROVIDE
CROSS BRACING GUSSETS AT 48"
O.C. MAX VERTICALLY. FABRICATED
FROM 6" MTL STUDS.
6”
09 29 00
5/8" GWB
09 29 00
SAB RETAINER STRAP
WHERE SAB OCCURS
CEILING
07 92 00
SEALANT
09 22 16
METAL STUDS
15A-512
D5
15A-512
B5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
100 Pearl Street, 14th Floor
Hartford, CT 06103
MAT PERKINS
(860)-270-0753
A u to d e s k D o c s /3
C
R
.P ro je c t.
-2
-7
.E H
R M
.I U
.B e d fo rd
.M A
.R
/5
-2 -7
.B e d fo rd .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:5
:3
A
M
15A-401
ARCHITECTURAL ENLARGED VIEWS - FIRST
LEVEL
518-22-700
06/04/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
200 Springs Rd, Bedford, MA 01730
3" = 1'-0" C1
HOLLOW METAL HEAD DETAIL
3" = 1'-0" E1
HOLLOW METAL JAMB DETAIL
1/4" = 1'-0" F1
WRAPPED FRAME TYPES ELEVATIONS
1/4" = 1'-0" E8
ARCHITECTURAL FLOOR PLAN - FIRST LEVEL
- RM 124 - DEMO
1/4" = 1'-0" D8
ARCHITECTURAL FLOOR PLAN - FIRST LEVEL
- RM 124A - NEW
1/16" = 1'-0" F8
FIRST LEVEL REFERENCE PLAN
NOT TO SCALE
E4
FIRST LEVEL EXISTING RM 124
1 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA
DURING ACTIVITIES WHICH PRODUCE DUST
2 NEW 45 MIN. FIRE RATED DOOR. SEE DOOR SCHEDULE AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY DOOR AS
REQUIRED FOR NEW ACCESS CONTROL HARDWARE.
3 REMOVE EXISTING FLOORING, ADHESIVES, AND INSTALL NEW WALL
BASE
4 REMOVED EXISTING DOOR AND FRAME
5 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A: 10B: C
CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN 75
FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE
THE NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A
NEW FEC FOR EACH TR IN THE SCOPE
6 EXTENTS OF FLOORING TO BE REMOVED
7 NEW FURRING WALL AT EXTERIOR WALL TO ENCLOSE WINDOW.
MAINTAIN 1/2" GAP BETWEEN EXISTING WALL INTERIOR FACE AND
NEW STUDS. MODIFY/ REMOVE INTERIOR WINDOW TRIM AS
REQUIRED. INSTALL WINDOW FILM AT ALL FURRED WINDOWS. SEE
15IN101 FOR MORE INFORMATION.
8 EXISTING WALL TO BECOME 1 HOUR FIRE AND SMOKE-RATED.
PATCH AND SEAL ALL PENETRATIONS AS NECESSARY.
9 AT NEW WALL INSTALLATIONS, CONTRACTOR TO PAINT NEW WALL
IN ITS ENTIRETY. INSTALL NEW WALL BASE AT ENTIRE WALL SPAN
OR APPROPRIATE TRANSITION LOCATION AS APPROVED BY THE
COR.
10 REMOVE EXISTING CEILING AND LIGHTS. MODIFY AND/OR PROVIDE
ADDITIONAL SUPPORTS AS REQUIRED FOR EXISTING CEILING
ITEMS TO REMAIN
11 EXISTING CEILING AND LIGHTS TO REMAIN. PROTECT IN PLACE.
MODIFY AND/OR PROVIDE ADDITIONAL SUPPORTS AS REQUIRED
FOR EXISTING CEILING ITEMS TO REMAIN
12 TELECOM ROOM OPEN TO DECK
13 ALIGN NEW WALL TO EDGE OF WINDOW
14 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.
REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS
BUILDING.
DOOR AND FRAME SCHEDULE
IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL
FIRE RATING
HARDWARE
NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL
LEVEL 1 124A TELECOM ROOM 109A 3' - 0" 8' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 C1/15A-101 E1/15A-101 F1/15IN101 45 MIN HW-SH-3F SEE SPEC 1.
1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.
1/4" = 1'-0" E5
ARCHITECTURAL CEILING PLAN - FIRST
LEVEL - RM 124- DEMO
1/4" = 1'-0" D5
ARCHITECTURAL CEILING PLAN - FIRST
LEVEL - RM 124A- NEW
NOTE: FIRE RESISTANCE TEST FOR ONE HOUR RATED WALLS: UL
U465
(TYPE A) TYPICAL PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
A3 3 5/8" 4 7/8" 35
NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED WALLS: UL
V438, UL U411
(TYPE B) TYPICAL PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
B 2 1/2" 3/4" 45
Revisions: Date:
Addendum 1 02/25/2026
(TYPE J) NON-RATED PARTITION
MARK STUD WIDTH PRTN WIDTH DESIGN STC
J2 2 1/2" 3 1/8" -
"FIRE-RATED WALLS"- ADDITIONAL NOTES:
1. CONDITIONS INDICATED TO SHOW DESIGN INTENT. THEY ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR A UL-APPROVED TOP-OF-WALL DESIGNS THAT ARE APPROPRIATE FOR CONDITIONS.
2. REFER TO SECTION 07 84 00 / FIRESTOPPING FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITION FOR FIRE-RATED WALLS.
SLOTTED TOP
TRACK
STUD
DESIGN BASIS: UL-HW-D-0082
CONCRETE SLAB
DESIGN BASIS: UL-HW-D-0042
METAL DECK
(PERPENDICULAR TO FLUTES)
/8
DESIGN BASIS: UL-HW-D-0264
METAL DECK
(PARALLEL TO FLUTES)
1" 1" 2"x20 GA
STRAPS @ 16"
O.C.
DESIGN BASIS: UL-HW-D-0259
STEEL BEAM
20 GA Z-BARS
TO
ACCOMMODATE
SFRM
SPRAY-APPLIED
FIRE-RESISTIVE
MATERIAL
(SFRM)
SAB
1 OR 2 LAYERS OF GWB;
SEE WALL TYPE
FIRE STOP SEALANT
FIRE STOP JOINT
SPRAY
MINERAL WOOL
FORMING MATERIAL
/8
/8
FIRE STOP JOINT
SPRAY
SLOTTED TOP
TRACK
STUD
SAB
1 OR 2 LAYERS OF GWB;
SEE WALL TYPE
/8
MINERAL WOOL
FORMING MATERIAL
SLOTTED TOP
TRACK
STUD
CONCRETE SLAB METAL DECK
(PERPENDICULAR TO FLUTES)
/8
/8
METAL DECK
(PARALLEL TO FLUTES)
1" 1"
/8
SLOTTED TOP
TRACK
2"x20 GA
STRAPS @ 16"
O.C.
STEEL BEAM
/8
20 GA Z-BARS
TO
ACCOMMODATE
SFRM
SPRAY-APPLIED
FIRE-RESISTIVE
MATERIAL
(SFRM)
SAB
GWB
ACOUSTICAL SEALANT
CUT ONE LAYER GWB TO
FOLLOW PROFILE OF DECKING.
SEAL CONTINUOUSLY WITH
ACOUSTICAL SEALANT.
FILL FLUTE VOID W/
SAB
GWB SOUND AND
SMOKE CLOSURE
STRIP SECURE TO
STRUCTURE AND SEAL
WITH ACOUSTICAL
SEALANT
ACOUSTICAL
SEALANT (BOTH
SIDES)
STUD
SAB
GWB
ACOUSTICAL SEALANT
(BOTH SIDES)
"SMOKE PARTITIONS AND SOUND-CONTROL WALLS"- ADDITIONAL NOTES:
1. UPGRADE TO DETAIL "B5" WHERE WALL IS DESIGNATED WITH A FIRE-RESISTANCE RATING.
2. FILL VOIDS WITH SOUND ATTENUATION BATTS (SAB).
3. SOUND WALLS AND SMOKE PARTITIONS REQUIRE THAT AT LEAST ONE LAYER OF GWB BE CUT TO FOLLOW UNDULATING SURFACES OF SUPERSTRUCTURES INCLUDING BUT NOT LIMITED TO FLUTES METAL DECKING. JOINT GWB TO SUPERSTRUCTURE WITH A CONTINUOUS BEAD OF ACOUSTICAL SEALANT.
4. BUILDING CODE REQUIRES THAT "SMOKE PARTITIONS" BE SEALED TO STRUCTURE AS INDICATED TO SUCCESSFULLY "….LIMIT THE PASSAGE OF SMOKE….".
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
100 Pearl Street, 14th Floor
Hartford, CT 06103
MAT PERKINS
(860)-270-0753
A u to d e s k D o c s /3
C
R
.P ro je c t.
-2
-7
.E H
R M
.I U
.B e d fo rd
.M A
.R
/5
-2 -7
.B e d fo rd .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:5
:3
A
M
15A-512
ARCHITECTURAL PARTITION HEAD DETAILS 518-22-700
06/04/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
200 Springs Rd, Bedford, MA 01730
3" = 1'-0" B5
HEAD-OF-WALL CONDITIONS - STUD WALLS - FIRE RATED WALLS
3" = 1'-0" D5
HEAD-OF-WALL CONDITIONS - STUD WALLS - SMOKE PARTITIONS AND SOUND CONTROL WALLS
NOTE:
STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION
TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE
USED. CONTRACTOR SHALL VERIFY ACTUAL CONDITIONS
ON-SITE.
Revisions: Date:
Addendum 1 02/25/2026
SHEET SYMBOL LEGEND
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
GENERAL INTERIOR NOTES
KEYNOTES
GENERAL FINISH NOTES:
1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND
INSTALLATION REQUIREMENTS.
2. REFER TO THIS SHEET FOR FINISH LEGEND AND ROOM FINISH
SCHEDULE.
3. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN
FOR CONSISTENCY.
SUBSTITUTION NOTES:
1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR
SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.
TRANSITION NOTES:
1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.
2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT
DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR
WHEN DOOR PANEL IS IN THE CLOSED POSITION.
SIGNAGE NOTES:
1. REFER TO THIS SHEET SERIES SHEETS FOR SIGNAGE INFORMATION,
REFER TO SPECIFICATIONS FOR ADDITIONAL SIGNAGE,
IDENTIFICATION AND SYSTEMS/EQUIPMENT LABELING
REQUIREMENTS.
PAINTING NOTES:
1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.
2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED
ITEMS OR INSTALLER FINISHED ITEMS.
3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.
PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD
TO ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.
CODE NOTES:
1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE
WITH IBC 2024 803.13 INTERIOR WALL AND CEILING FINISH
REQUIREMENTS BY OCCUPANCY.
INSTALLATION NOTES:
1. PROVIDE BACKING FOR ALL WALL MOUNTED EQUIPMENT.
MATERIAL FLOOR CHANGE (REFER TO THIS SHEET FOR DETAILS)
INTERIOR FINISH SYMBOLS
CONCRETE WITH STATIC DISSIPATIVE COATING (C-1/ SDC)
INTERIOR FINISHES
PAINT
FIELD
CALIFORNIA PAINTS*
TO MATCH BENJAMIN MOORE
MANCHESTER TAN HC-81
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
NB KLM
Project Number
Board Number
Office of Construction and Facilities Management
*BASIS OF DESIGN
**MATCH EXISTING CAMPUS PAINT COLORS
EHRM INFRASTRUCTURE
UPGRADES
518-22-700
200 Springs Road, Bedford, MA 01730
EDITH NOURSE MEMORIAL VETERANS HOSPITAL
P-1
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
PAINT
METAL DOORS & TRIM
CALIFORNIA PAINTS*
TO MATCH BENJAMIN MOORE
WHITE DOWN OC-131
P-2
WALL BASE
JOHNSONITE*
BEIGE 49
RB-1
PAPER INSERT CARRIER, MAGNETIC
MOUNT, WITH NON-GLARE LENS
TEXT: 5/8"H LASER-PRINTED TEXT,
HELVETICA MEDIUM
COLOR: TO MATCH STATION
STANDARDS
1-1/2" x 1/32" ADA
TACTILE NUMERALS
AND GRADE II BRAILLE234
9"
Restricted Access
5-3/16" X 9" CLEAR
ACETATE INSERT W/
COPY
9"X9" MAGNETICALLY
REMOVABLE SIGN
(ONE-PIECE)
RED SYMBOL AND
BLACK TEXT
1/2" 9" 1/2"
/2
/2
QUARTER-ROUND
SILVER FRAME
EXISTING FLOORING
TO BE REMOVED
TOP OF SLAB
EXISTING
FLOORING TO
REMAIN, EXISTING
ROOM SIDE EXISTING CONCRETE
FLOOR WITH STATIC
DISSIPATIVE (C-1/SDC)
RESILIENT BASE AS
SCHEDULED, EACH
SIDE OF NEW WALL
INSTALL 3/4"
PLYWOOD TO 8'AFF,
MOUNT BOTTOM OF
PLYWOOD 12" AFF
ADJACENT SPACE
TELECOM
ROOM SIDE
PARTITION AS SCHEDULED
1EXISTING CONCRETE
FLOOR WITH STATIC
DISSIPATIVE (C-1/SDC)
LOCATION OF FLOOR
FINISH CHANGE;
SEAM OR ADAPTER
TRANSITION SHALL
OCCUR AT
CENTERLINE OF
DOOR IN CLOSED
POSITION
DOOR AS SCHEDULED
EXISTING FLOORING
TOP OF SLAB
CORRIDOR SIDE
DOOR FRAME BEYOND
C CENTER LINE OF DOORL
TRANSITION STRIP
(TR-1) OR EQUAL,
REFER TO SCHEDULE
FOR INFORMATION
TELECOM ROOM SIDE
SIGNAGE REFERENCES
VA SIGNAGE DESIGN MANUAL
SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE
SPECIFICATIONS
https://www.cfm.va.gov/til/spclRqmts.asp#SIGN
SIGN SYMBOL LEGEND
IN-08.02
IN-04.03D
IN-01.31
TELECOM ROOM FINISH DIAGRAM,
CONTRACTOR TO REFERENCE
ARCHITECTURE FOR ACTUAL WALL
CONSTRUCTION LOCATIONS
1 2 5 6
F4
15IN101
TYP.
F1
15IN101
TYP.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
100 Pearl Street, 14th Floor
Hartford, CT 06103
MAT PERKINS
(860)-270-0753
A u to d e s k D o c s /3
C
R
.P ro je c t.
-2
-7
.E H
R M
.I U
.B e d fo rd
.M A
.R
/5
-2 -7
.B e d fo rd .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:5
:3
A
M
15IN101
INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES 518-22-700
06/04/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
200 Springs Rd, Bedford, MA 01730
NTS
C1
COLOR BOARD
3" = 1'-0" D3
IN-04.01A SIGN DETAIL - PRIMARY ROOM
IDENTIFICATION
3" = 1'-0"
D1
IN-08.02 SIGN DETAIL - PROHIBIT
INSTRUCTIONAL AND CONTROL
NTS
D5
EXAMPLE OF EXISTING SIGNAGE
6" = 1'-0" F4
RESILIENT BASE (TOE BASE)
6" = 1'-0"
F1
THRESHOLD - CONCRETE TO EXISTING FLOORING
1 REMOVE EXISTING FLOORING, ADHESIVES, AND INSTALL NEW WALL
BASE
2 EXISTING WALLS ARE TO BE PATCHED AND PAINTED. SEE ROOM
FINISH SCHEDULE THIS SHEET FOR FINISHES.
3 ALL WALLS TO RECEIVE NEW PLYWOOD, COORDINATE WITH
ELECTRICAL DRAWINGS FOR FIXTURE LOCATIONS
4 PROVIDE NEW ROOM SIGNAGE, SEE SIGNAGE SCHEDULE THIS
SHEET
5 REFER TO ARCHITECTURAL PLANS FOR DETAILED ROOM
CONFIGURATION INFORMATION
6 TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE
SEALER
REFER TO THIS SHEET FOR ROOM FINISH SCHEDULE & FINISH LEGEND
ROOM FINISH SCHEDULE
LEVEL NO. NAME
FLOOR WALLS CEILING
NOTESFINISH BASE
NORTH EAST SOUTH WEST
MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
LEVEL 1 124A TELECOM ROOM C-1/SCD RB-1 GWB P-1 GWB P-1 GWB P-1 GWB P-1 OPEN
BUILDING SIGNAGE SCHEDULE
VERSIO
N TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE
ADA
BRAILLE TEXT COLOR BACKGROUND COLOR
DIMENSIONS
CommentsSIGN_HEIGHT SIGN_WIDTH MOUNTING HEIGHT
IN-01.31 1 FIRE IDENTIFICATION SIGN D6 / IN101 FEC REFER TO PAGE 429 OF SIGNAGE DESIGN
MANUAL DATED 05/2023
NO WHITE RED 9" 9" 6' - 8" INSTALLED AT FIRE EXTINGUISHER CABINETS AT ALL
NEW TELECOM ROOMS
IN-04.03D 1 PRIMARY ROOM IDENTIFICATION
WITH INSERT
D3 / IN101 PUBLIC SPACES REFER TO PAGE 261 OF SIGNAGE DESIGN
MANUAL DATED 05/2023
YES REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
9" 9" 5' - 0" INSTALLED AT ALL NEW TELECOM ROOMS
IN-08.02 1 PROHIBIT INSTRUCTIONAL AND
CONTROL
D1 / IN101 TELECOM ROOM REFER TO PAGE 279 OF SIGNAGE DESIGN
MANUAL DATED 05/2023
NO REFERENCE EXISTING
CAMPUS STANDARDS
REFERENCE EXISTING
CAMPUS STANDARDS
9" 9" 5' - 9" INSTALLED AT ALL NEW TELECOM ROOMS MOUNTED
DIRECTLY ABOVE ROOM NAME SIGN
Grand total: 3
FINISH LEGEND
SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES
C-1/SDC CONCRETE WITH STATIC DISSIPATIVE COATING SEALED CONCRETE* - - - - - TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE SEALER
F-1 WINDOW FILM 3M* FASARA 7725SE-324 FROSTED CRYSTAL - 08 87 33
P-1 PAINT CALIFORNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD
P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM
RB-1 RESILIENT BASE JOHNSONITE* TRADITIONAL TOE BASE BEIGE 49 4" 09 65 13
TR-1 TRIM SCHLUTER * - RENO-U SATIN ANODIZED ALUMINUM - 09 30 13 FLOOR TRANSITION
WD PLYWOOD FIRE TREATED PLYWOOD* - - HIGH GLOSS WHITE MPI (MASTER PAINTERS INSTITUTE)
67 OR SIM
4' X 8' - PLYWOOD TO BE PAINTED WITH 2 COATS OF FIRE RESISTANT PAINT;FIRE RATING
STAMPS SHALL NOT BE PAINTED OVER
*Materials are approved as basis of design, all material substitutions are subject to owner approval. Contractor to provide VA Interior Design Department with samples of all specified finish materials. VA COR/ Interior Design department shall approve all finishes prior to installation.
3" = 1'-0" D6
IN-01.31 SIGN DETAIL - FIRE EQUIPMENT
IDENTIFICATION SIGN
1/2" = 1'-0" F7
TYPICAL TELECOM ROOM FINISH DIAGRAM
Revisions: Date:
Addendum 1 02/25/2026
EXISTING FLOORING
TO BE REMOVED
TOP OF SLAB
EXISTING
FLOORING TO
REMAIN, EXISTING
ROOM SIDE EXISTING CONCRETE
FLOOR WITH STATIC
DISSIPATIVE (C-1/SDC)
RESILIENT BASE AS
SCHEDULED, EACH
SIDE OF NEW WALL
INSTALL 3/4"
PLYWOOD, MOUNT
BOTTOM OF
PLYWOOD 12" AFF
ADJACENT SPACE
TELECOM
ROOM SIDE
PARTITION AS SCHEDULED
| Sheets |
| 15A-401 - ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL |
| 15A-512 - ARCHITECTURAL PARTITION HEAD DETAILS |
| 15H-101 - HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL |
| 15IN101 - INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES |
File details come from the government source that posted it. Updated .