Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf
PDF 240 KB Posted
- Solicitation number
- 36C77626R0003
About this file
This is an Addendum (ADD-1) to construction drawing documents for project 518-22-700 Bedford EHRM, dated February 25, 2026, issued by Triple C – The A&E Group, a Service-Disabled Veteran-Owned Small Business.
The addendum documents comprehensive revisions made to final construction drawings per Department of Veterans Affairs (VA) request. Specification changes include updates to the Table of Contents with specification dates and added sections, and the addition of Section 08 87 33 for window film. Drawing revisions span multiple document sets across site infrastructure, mechanical/electrical/plumbing (MCR), and 27 individual buildings (Buildings 1-10, 13-16, 17_29, 18, 20, 21_19, 22, 33, 61-62, 70, 78, 80-82, and BCH). All sheets have been stamped for construction. Common revisions across building drawings include removal of General Note H, addition of supplementary general notes, clarifications to wall type finishes (Types A, B, and J), updates to metal frame clarifications, addition of north arrows, door height increases to 8 feet, window film specifications in finish legends, lead-based paint removal keynotes, updated code references and signage heights, and clarifications to painted wall specifications. Specialized revisions include building connection revisions from coil box to core drill on multiple site sheets, fiber routing reroutes through storage areas and attic spaces on telecommunications sheets, security and low voltage device adjustments for relocated doors, and masonry control joint location revisions on structural sheets.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRIPLE C – THE A&E GROUP
OUR REASONABLE SERVICE - TO PROVIDE YOU WITH EXEMPLARY SERVICE
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
ADDENDUM-01
Project: 518-22-700 Bedford EHRM
Date: 02/25/2026
Summary of Clarifications
Triple C has revised the final construction drawing documents for project 518-22-700, per request of the VA.
Specifications:
SECTION DESCRIPTION OF/REASON FOR CHANGE
00 01 00 Updated TOC with specification dates and added sections
08 87 33 Window film
Drawing Changes: SITE
SHEET NUMBER REVISION
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
General all sheets ADD-1 All sheets have been stamped for construction.
ES101 ADD-1 Updated view title to be on page.
TS100 ADD-1 Location address updated on titleblock.
TS101 ADD-1 Location address updated on titleblock. Keynote 32 updated.
TS102 ADD-1 Location address updated on titleblock. Keynote 32 updated.
TS103 ADD-1
Location address updated on titleblock. Keynote 32 updated.
TS104 ADD-1 Location address updated on titleblock. Keynote 32 updated.
TS201 ADD-1 Revised building connection from coil box to core drill.
TS202 ADD-1 Revised building connection from coil box to core drill.
TS204 ADD-1 Revised building connection from coil box to core drill.
TS205 ADD-1 Revised building connection from coil box to core drill.
TS206 ADD-1 Revised building connection from coil box to core drill.
CVE Verified Service-Disabled Veteran-Owned Small Business
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
TS207 ADD-1 Revised building connection from coil box to core drill.
TS208 ADD-1 Revised building connection from coil box to core drill.
TS209 ADD-1 Revised building connection from coil box to core drill.
TS210 ADD-1 Revised building connection from coil box to core drill.
T-501 ADD-1 B3 detail updated for underground. Pipe penetration detail added.
T-601 ADD-1 Linetype notes updated. One line diagram updated between service provider and Buildings 3, 4, 5, 6, and MCR.
Drawing Changes: MCR
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
MCRIN001 ADD-1 Color board image and info changed updated PT-1 to a USA made tile
MCRIN101 ADD-1 Finish legend updated for tile and paint. Sign type IN-01.31 height changed. General note code note updated to current year
MCRIN501 ADD-1 D6 detail updated
MCRS-001 ADD-1 Added “MCJ” to list of structural abbreviations.
MCRS-002 ADD-1
Updated code reference in masonry general structural notes section.
MCRS-201 ADD-1 Revised top of pier elevation in Plan Notes.
MCRS-201 ADD-1 Revised masonry control joint locations.
MCRS-402 ADD-1 Fixed overlapping text in detail 10.
MCRS-701 ADD-1 Revised weld in detail 2.
MCRS-701 ADD-1 Added weld arrow in detail 7.
Drawing Changes: Building 1
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
01A-401 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, D1 metal frame clarification. North arrow added. Keynote 4 and 5 clarified. Wall tags added at windows. Wall type J added.
Door height changed to 8’.
01A-512 ADD-1 Detail clarification
01IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Finish legend update paint notes for the plywood. Window film added to finish legend.
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Drawing Changes: Building 2
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
02A-401 ADD-1 General note H removed. Additional general notes provided.
North arrow added. Additional keynotes and information added to accurately reflect existing conditions and scope of work. Added furring wall at window. Updated keynotes for window film.
02A-402 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, D1 metal frame clarification. North arrow added. Added wall type J.
02A-512 ADD-1 Detail clarification
02IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Drawing Changes: Building 3
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
03A-401 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, D1 metal frame clarification. North arrow added. Door increased to 8’.
03IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Finish legend update paint notes for the plywood.
Drawing Changes: Building 4
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
04H-100 ADD-1 Keynote added to provide further direction on how to address lead based paint.
04H-101 ADD-1 Keynote added to provide further direction on how to address lead based paint.
04A-400 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, D1 metal frame clarification. North arrow added. Wall type J added.
04A-401 ADD-1 General note H removed. Additional general notes provided.
North arrow added. Keynote 9 updated.
04A-512 ADD-1 Detail clarification
04IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Drawing Changes: Building 5
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
05A-401 ADD-1 General note H removed. Additional general notes provided.
E6 metal frame clarification. North arrow added.
Drawing Changes: Building 6
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
06A-401 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, E1 metal frame clarification. North arrow added. Wall type J added.
Door schedule updated with 8’ door heights. Keynote 5 updated.
06A-402 ADD-1 General note H removed. Additional general notes provided.
North arrow added.
06A-512 ADD-1 Detail clarification
06IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. Keynote 3 clarification.
General notes Code reference updated. Signage height for
IN-01.31 updated. Finish legend update paint notes for the plywood. Window film added to finish legend.
Drawing Changes: Building 7
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
07A-400 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, D1 metal frame clarification. North arrow added. Wall type J added.
Keynote 7 updated.
07A-401 ADD-1 General note H removed. Additional general notes provided.
North arrow added. Wall tags added to views. Keynote 5 updated.
07A-512 ADD-1 Detail clarification
07IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. Keynote 3 clarification.
General notes Code reference updated. Signage height for
IN-01.31 updated. Finish legend update paint notes for the plywood. Window film added to finish legend.
Drawing Changes: Building 8
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
08A-401 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, D1 metal
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053 frame clarification. North arrow added. Wall type J added.
Keynote 6 updated. Wall tags added to view.
08A-512 ADD-1 Detail clarification
08IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Drawing Changes: Building 9
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
09A-400 ADD – 1 General note H removed. Additional general notes provided.
North arrow added. Edits made to wall type A and B finish clarification, D1 metal frame clarification. Wall type J added.
Door schedule updated with 8’ door heights. Added CMU door details.
09A-401 ADD-1 General note H removed. Additional general notes provided.
North arrow added. Keynote 13 updated. Wall tags added to view. Keynote 17 added.
09A-512 ADD-1 Detail clarification
09IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Drawing Changes: Building 10
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
10H-102 ADD – 1 Keynote added to provide further direction on how to address lead based paint. Quantities updated.
10A-401 ADD – 1 General note H removed. Additional general notes provided.
North arrow added. Edits made to wall type B finish clarification, E1 metal frame clarification. Wall type J added.
Keynote 8 updated. Wall tags added to view.
10A-512 ADD-1 Detail clarification
10IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Finish legend update paint notes for the plywood. Window film added to finish legend.
10T-100 ADD-1 Reroute fiber through storage 100D up to attic space
10T-101 ADD-1 Reroute fiber through storage 100D up to attic space
And rename view name. Reroute fiber route to TR room
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Drawing Changes: Building 13
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
13A-401 ADD – 1 General note H removed. Additional general notes provided.
North arrow added. Edits made to wall type A and B finish clarification, D1 metal frame clarification. Wall type J added.
Keynote 15 added. Wall tags added to view.
13A-512 ADD-1 Detail clarification
13IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Drawing Changes: Building 14
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
14H-102 ADD – 1 Keynote added to provide further direction on how to address lead based paint.
14A-401 ADD – 1 General note H removed. Additional general notes provided.
North arrow added. Edits made to wall type B finish clarification, E2 metal frame clarification. Wall type J added.
Keynote 4 updated. Wall tags added to view.
14A-512 ADD-1 Detail clarification
14IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Drawing Changes: Building 15
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
15H-102 ADD – 1 Keynote added to provide further direction on how to address lead based paint.
15A-401 ADD – 1 General note H removed. Additional general notes provided.
North arrow added. Edits made to wall type B finish clarification, E1 metal frame clarification. Wall type J added.
Keynote 7 updated. Wall tags added to view. Door schedule updated with 8’ door height.
15A-512 ADD-1 Detail clarification
15IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Drawing Changes: Building 16
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
16A-401 ADD – 1 General note H removed. Additional general notes provided.
North arrow added. Edits made to wall type B finish clarification, F4 metal frame clarification. Wall type J added.
Keynote 4 updated.
16IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Drawing Changes: B17_29
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
17_29A-401 ADD-1 General note H removed. Additional general notes provided. North arrow added. Keynote 5 updated. B8 added J2 wall type at window. Edits made to wall type B finish clarification, added wall type J2. Keynote 11 added.
Height of door changed to 8’-0”
17_29A A-512 ADD-1 Detail clarification
17_29IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes
Code reference updated. Signage height for IN-01.31 updated. Finish legend update paint notes for the plywood, add film.
17_29T-100 ADD-1 Reroute fiber point of entry location
Drawing Changes: B18
SHEET NUMBER REVISION
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
18H-101 ADD-1 Keynote 2 added for lead paint removal
18A-401 ADD-1 General note H removed. Additional general notes provided. North arrow added. Keynote 7 updated. B8 added J2 wall type at window. Edits made to wall type B finish clarification, added wall type J2
18IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes
Code reference updated. Signage height for IN-01.31 updated. Finish legend update paint notes for the plywood, add film.
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
18FX101 ADD-1 Demo sidewall sprinkler in storage RM110
18T-100 ADD-1 Reroute fiber point of entry into building. Reroute fiber through Crawl Space avoiding stairs.
Drawing Changes: B20
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
20A-400 ADD-1 General note H removed. Additional general notes provided. Edits made to E6 metal frame clarification. North arrow added. E2 door detail numbers updated
Drawing Changes: B21_19
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
21_19A-400 ADD-1 General note H removed. Additional general notes provided. Edits made to E4 metal frame clarification. North arrow added.
Drawing Changes: B22
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
22A-400 ADD-1 General note H removed. Additional general notes provided. Edits made to E6 metal frame clarification. North arrow added. Keynote 6 added
Drawing Changes: B33
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
33A-400 ADD-1 General note H removed. Additional general notes provided. Edits made to wall type A and B finish clarification, E6 metal frame clarification. North arrow added. F5 keynotes added to chase wall, keynotes 9,10,11 added.
Drawing Changes: B61
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
61H-101 ADD-1 Keynote 2 added for lead paint removal
61A-400 ADD-1 General note H removed. Additional general notes provided. North arrow added. Keynote 16 added
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
61A-401 ADD-1 General note H removed. Additional general notes provided. Edits made to wall type A and B finish clarification, B5 metal frame clarification. North arrow added
61A-512 ADD-1 Detail clarification
61IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code
Drawing Changes: B62
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
62H-103 ADD-1 Keynote 2 added for lead paint removal
62A-400 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, C1 metal frame clarification. North arrow added. B7 door location updated, keynote 17 added. D7 demo of wall updated, keynote 16 added. Wall type J2 added.
62A-401 ADD-1 General note H removed. Additional general notes provided.
North arrow added. B3/B7 wall type J2 added at window, key note 11 updated
62A-512 ADD-1 Detail clarification
62IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Finish legend update paint notes for the plywood, window film added
62E-401 ADD-1 Adjusted security and low voltage devices to relocated door.
62T-100 ADD-1 Reroute fiber in conduit sweeping up to the floor above.
62T-101 ADD-1 Provide new cable tray and new location of fiber route to above floor.
62T-401 ADD-1 Reroute fiber in conduit sweeping up to the floor above.
Provide new cable tray and new location of fiber route to above floor.
Drawing Changes: B70
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
70A-400 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, C1 metal frame clarification. North arrow added. B7 wall type adjusted to A6, dimension added to locate new door, wall type J2 add at window. Keynote 6 updated. J2 wall type
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053 added
70A-401 ADD-1 General note H removed. Additional general notes provided.
North arrow added. B3/B7 door dimension added, wall type
J2 added at windows. Keynote 12 updated
70A-512 ADD-1 Detail clarification
70IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code
Finish legend update paint notes for the plywood, film added
Drawing Changes: B78
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
78H-103 ADD-1 Keynote 2 added for lead paint removal
78A-400 ADD-1 General note H removed. Additional general notes provided. North arrow added. Keynote 20 added
78A-401 ADD-1 General note H removed. Additional general notes provided. North arrow added. Room number corrected for room 228 in titles. Door tag corrected for 228.
78A-402 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, D1 metal frame clarification. North arrow added. Wall typ J2 added, Door heights changed to 8’-0” for doors 1232,228,342,401.
Door tag corrected for 228.
78A-512 ADD-1 Detail clarification
78IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code reference updated. Signage height for IN-01.31 updated.
Finish legend update paint notes for the plywood. Room schedule updated room name for B30
Drawing Changes: B80
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
80A-400,401 ADD-1 General note H removed. Additional general notes provided.
Edits made to wall type A and B finish clarification, E2 metal frame clarification. North arrow added.
78A-512 ADD-1 Detail clarification
78IN101 ADD-1 F1 and F4 clarification to finish notes. Keynote 2 clarification on what walls are to be painted. General notes Code
410 Grand Avenue, Suite 201C � Laramie, Wyoming 82070 � Telephone: (307) 460-2054 � Fax: (307) 460-2053
Drawing Changes: B81
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
81A-401 ADD-1 General note H removed. Additional general notes provided.
Clarification, E7 metal frame clarification, Edits made to wall type B finish clarification. North arrow added.
Drawing Changes: B82
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
82A-401 ADD-1 General note H removed. Additional general notes provided.
Clarification, E6 metal frame clarification. North arrow added.
Drawing Changes: BCH
NUMBER
DESCRIPTION OF/REASON FOR CHANGE
BCHA-401 ADD-1 F3 note updated. General notes updated
End of ASI
Notes
File details come from the government source that posted it. Updated .