This file contains architectural construction documents for hazardous material abatement and infrastructure upgrades at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts. The project, numbered 518-22-700, is being managed by the U.S. Department of Veterans Affairs Office of Construction and Facilities Management, with TRIPLE C - The A/E Group serving as the Architect/Engineer of Record.

The documents detail comprehensive architectural specifications for the first level of the facility, including hazardous material abatement planning, partition construction requirements, door and frame schedules, and interior finishes. Key construction elements include fire-rated and non-rated partition wall specifications using metal studs and gypsum wallboard, hollow metal door frames with specific hardware requirements, head-of-wall conditions for both fire-rated and smoke partition installations, and detailed specifications for flooring transitions and interior finish materials. Interior finishes include paint specifications (California Paints matched to Benjamin Moore colors), resilient base, plywood installation, and signage requirements for room identification and safety (including fire equipment identification signs and instructional control signage). The specifications reference various UL design standards for fire-resistance ratings and include detailed construction notes addressing firestopping, sound attenuation, and smoke partition sealing requirements. Addendum 1 was issued on February 25, 2026, indicating active project development and document revision.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

UP

DN

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND

DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF

MASSACHUSETTS AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF

LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, STATE OF MASSACHUSETTS DEPARTMENT OF PUBLIC HEALTH, AND THE STATE OF

MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL CONSERVATION

2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM

DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. COORDINATE USAGE OF STAIRS VS USAGE OF CHUTE FOR DISPOSAL OF REMOVED HAZARDOUS MATERIAL ON THE FIRST LEVEL. THE ABATEMENT

CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE

REGULATIONS. WHERE OVERLAPS OCCUR, THE MOST STRINGENT REQUIREMENTS APPLY.

4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A MAS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A MAS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS

SHALL BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR

ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR

ASBESTOS EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE

ENVIRONMENT.

8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED

MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT

DOCUMENTS. THE OWNER OR THEIR REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR LOST,

DAMAGED OR STOLEN ITEMS.

10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, MASDPH, AND THE MASDEC.

12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS

BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE

PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS

SHOWING THE NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES.

THE GROUND LEVEL IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG

METHODS ON THE GROUND LEVEL TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD

ABATEMENT REQUIREMENTS, AND THE COR.

18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR.

ALL OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL

BE RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM

ON HVAC EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS.

COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED

TO THE OWNER WITHIN 35 DAYS OF WASTE LEAVING THE SITE.

22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, SPECIFIC ORIGINAL FLOORING MATERIALS, AND IN TRANSITE PANELS AT RADIATORS BELOW WINDOWS. NO ASBESTOS CONTENT HAS BEEN IDENTIFIED IN SAMPLING OF CEILING TILES, DRYWALL, JOINT COMPOUND, SKIM COAT, FIBERBOARD, FIRESTOP, COVE BASE, MASONRY WINDOW CAULK, BATHROOM CAULK, TILE GROUT, TILE GLUE, CERAMIC TILES, OR SPECIFIC FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY.

SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION.

UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR ANALYZE BULK SAMPLES OF

SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY

BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

24. COORDINATE WITH INDUSTRIAL HYGIENIST FOR REVIEW OF MONITORING, AND FINAL CONFIRMATION OF

ABATED AREAS, REFER TO SPEC SECTION 02 82 13.13

KEYNOTES#

QUANTITIES - ACM /LEAD MATERIALSLEGEND

REMOVAL PATH

SAMPLE

HA ## SAMPLE LOCATION

ASBESTOS /

LEAD PAINT

NOT ALL SAMPLE LOCATIONS SHOWN FOR CLARITY. ONLY

POSITIVE OR POSITIVE STOP SAMPLES ARE LOCATED.

SAMPLE NUMBER PER SURVEY REPORT FROM TERRACON.

REFER TO SURVEY REPORT FOR SPECIFIC SAMPLE

INFORMATION

PATH INDICATED IS PROVIDED FOR INTENT ONLY.

COORDINATE FINAL REMOVAL PATHWAYS, PHASING, AND

METHODS WITH GENERAL CONTRACTOR AND COR.

125 SF LEAD CONTAINING PAINT TO BE ABATED

SAMPLE

PNT ##

OFFICE

105105

OFFICE

104104

VESTIBULE

XX

STAIRS

106106

HAC

102102

CONFERENCE

RM

108108

OFFICE

120120

OFFICE

119119

VESTIBULE

XX

STAIRS

111111

CLOSET

118118 OFFICE

112112

CONFERENCE

RM

114114

OFFICE

113113

TOILET

110110

RESTROOM

107107

KITCHEN

109109

SAMPLE

PNT#185

SAMPLE

PNT#187

2 1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753 mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:4

:4

A

M

14H-101

HAZARDOUS MATERIAL ABATEMENT PLAN -

FIRST LEVEL

518-22-700

06/04/2025 M PERKINS J SONES

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1/8" = 1'-0" F5

HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL

1 PRIOR TO DEMO PROVIDE CONTAINMENT BARRIER AND PERSONNEL DECONTAMINATION FACILITY PER 02 82 11 DURING ABATEMENT WORK. COORDINATE TIMING WITH COR (48 HR MAX) TO MINIMIZE

DISRUPTION TO OCCUPIED SPACES.

2 ABATE AND REMOVE LEAD BASED PAINT THROUGHOUT ENTIRE ROOM. ASSUMED DOOR FRAMES ALSO CONTAIN LEAD BASED PAINT. DISPOSE OF FRAME PROPERLY WHERE FRAME IS BEING REMOVED.

WHERE FRAME IS TO REMAIN, ABATE AND REMOVE PAINT ON DOOR FRAME.

Revisions: Date:

Addendum 1 02/25/2026

02/25/2026

UP

DN

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED

AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,

AND CAMPUS STANDARDS.

E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

G. SEE TYPICAL CEILING DETAILS ON SHEET A-531

H. ALL PHOTOS SHOWN REFLECT EXISTING CONDITIONS AS OF THE

DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH

MOVING, STORING AND RETURNING FURNISHINGS AND EQUIPMENT

TO THE PROPOSED WORK AREA(S). ANY DISASSEMBLY AND

REASSEMBLY OF SYSTEMS FURNITURE IN THE PROPOSED WORK

AREAS IS THE RESPONSIBILITY OF THE CONTRACTOR AND MUST

FOLLOW THE MANUFACTURER'S WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

14A-401

C8

TELECOM

ROOM

124 SF

A

B

TELECOM

ROOM

124 SF

E X

IS

T

V

IF

'-3

/4

EXIST (VIF)

11'-0"

H W

-S H

-3 F

B

B

B

B

J2

A

B

7 8

OFFICE

124 SF

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

C2

TYPICAL FRAME

H E

IG

H

T

2" WIDTH 2"

E2

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

ACOUSTICAL OR RATED

FLEXIBLE SEALANT

FLOOR LINE

ADD ONE LAYER OF 5/8" GWB,

ONE-SIDE WITH APPROVED UL

SETTING COMPOUND BETWEEN

LAYERS AND FASTENED TO

WALL AS REQUIRED, AT

EXISTING GWB WALL

ASSEMBLIES

STRUCTURAL DECK

EXISTING METAL STUDS AND

BATT INSULATION TO REMAIN

A/C GRADE, 3/4" FIRE-TREATED

PLYWOOD, ADHERED TO CONCRETE

AT EXISTING CONCRETE WALL

ASSEMBLIES

BOTTOM OF PLYWOOD

TO BE AT 12" AFF

UL DESIGN V497

1-HOUR PARTITION RATED FROM BOTH SIDES

EXISTING GWB OR

CONCRETE WALL

ASSEMBLY, WHERE OCCURS

SIDE OF

EXISTING

ROOM OR

CORRIDOR TO

REMAIN

14A-512

D5

14A-512

B5

A

B

TELECOM

ROOM

124 SF

OFFICE

124 SF

LINE OF

STRUCTURE

LINE OF

STRUCTURE

09 29 00

SOUND ATTENUATION BATTS

(SAB), WHERE OCCURS

NOTE:

IF PARTITION TYPE IS USED IN A

CHASE WALL CONDITION, PROVIDE

CROSS BRACING GUSSETS AT 48"

O.C. MAX VERTICALLY. FABRICATED

FROM 6" MTL STUDS.

6”

09 29 00

5/8" GWB

09 29 00

SAB RETAINER STRAP

WHERE SAB OCCURS

CEILING

07 92 00

SEALANT

09 22 16

METAL STUDS

14A-512

D5

14A-512

B5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:4

:4

A

M

14A-401

ARCHITECTURAL ENLARGED VIEWS - FIRST

LEVEL

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

3" = 1'-0" C2

HOLLOW METAL HEAD DETAIL

3" = 1'-0" E2

HOLLOW METAL JAMB DETAIL

1/4" = 1'-0" F2

WRAPPED FRAME TYPES ELEVATIONS

3/32" = 1'-0" F8

FIRST LEVEL REFERENCE PLAN

1/4" = 1'-0" C8

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 119 - NEW

1/4" = 1'-0" E8

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 119- DEMO

1 EXISTING WALLS TO BECOME 1 HR FIRE AND SMOKE-RATED.

PATCH AND SEAL ALL PENETRATIONS AS NECESSARY.

2 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A:10B:C

CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN 75

FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE

THE NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A

NEW FEC FOR EACH TR IN THE SCOPE OF WORK. SEE

SPECIFICATION 10 44 13.

3 NEW 45 MIN. FIRE RATED DOOR AND FRAME. SEE DOOR SCHEDULE

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY

DOOR AS REQUIRED FOR NEW ACCESS CONTROL HARDWARE.

4 NEW FURRING WALL AT EXTERIOR WALL TO ENCLOSE WINDOW.

MAINTAIN 1/2" GAP BETWEEN EXISTING WALL INTERIOR FACE AND

NEW STUDS. MODIFY/ REMOVE INTERIOR WINDOW TRIM AS

REQUIRED. INSTALL WINDOW FILM AT ALL FURRED WINDOWS. SEE

14IN101 FOR MORE INFORMATION.

5 REMOVE EXISTING DOOR AND FRAME.

6 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA

DURING ANY ACTIVITIES WHICH PRODUCE DUST - TYPICAL.

7 REMOVE EXISTING FLOORING, ADHESIVE AND WALL BASE.

8 ALL ITEMS/ EQUIPMENT TO BE REMOVED FROM SPACE PRIOR TO

DEMO.

9 REMOVE EXISTING CEILING AND LIGHTS. MODIFY AND/OR PROVIDE

ADDITIONAL SUPPORTS AS REQUIRED FOR EXISTING CEILING

ITEMS TO REMAIN

10 TELECOM ROOM OPEN TO DECK

11 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED WALLS: UL

V438, UL U411

(TYPE B) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

B 2 1/2" 3/4" 45

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL

LEVEL 1 119 TELECOM ROOM 119 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 C2/14A-401 E2/14A-401 F1/14IN101 45 MIN HW-SH-3F SEE SPEC 1.

1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

1/4" = 1'-0" C6

ARCHITECTURAL CEILING PLAN - FIRST

LEVEL - RM 119- NEW

1/4" = 1'-0" E6

ARCHITECTURAL CEILING PLAN - FIRST

LEVEL - RM 119- DEMO

NOT TO SCALE

F5

EXISITNG CONDITIONS RM 119

Revisions: Date:

Addendum 1 02/25/2026

(TYPE J) NON-RATED PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

J2 2 1/2" 3 1/8" -

"FIRE-RATED WALLS"- ADDITIONAL NOTES:

1. CONDITIONS INDICATED TO SHOW DESIGN INTENT. THEY ARE NOT INTENDED TO BE PROPRIETARY. CONTRACTOR MAY EMPLOY SIMILAR A UL-APPROVED TOP-OF-WALL DESIGNS THAT ARE APPROPRIATE FOR CONDITIONS.

2. REFER TO SECTION 07 84 00 / FIRESTOPPING FOR ADDITIONAL REQUIREMENTS REGARDING HEAD-OF-WALL CONDITION FOR FIRE-RATED WALLS.

SLOTTED TOP

TRACK

STUD

DESIGN BASIS: UL-HW-D-0082

CONCRETE SLAB

DESIGN BASIS: UL-HW-D-0042

METAL DECK

(PERPENDICULAR TO FLUTES)

/8

DESIGN BASIS: UL-HW-D-0264

METAL DECK

(PARALLEL TO FLUTES)

1" 1" 2"x20 GA

STRAPS @ 16"

O.C.

DESIGN BASIS: UL-HW-D-0259

STEEL BEAM

20 GA Z-BARS

TO

ACCOMMODATE

SFRM

SPRAY-APPLIED

FIRE-RESISTIVE

MATERIAL

(SFRM)

SAB

1 OR 2 LAYERS OF GWB;

SEE WALL TYPE

FIRE STOP SEALANT

FIRE STOP JOINT

SPRAY

MINERAL WOOL

FORMING MATERIAL

/8

/8

FIRE STOP JOINT

SPRAY

SLOTTED TOP

TRACK

STUD

SAB

1 OR 2 LAYERS OF GWB;

SEE WALL TYPE

/8

MINERAL WOOL

FORMING MATERIAL

SLOTTED TOP

TRACK

STUD

CONCRETE SLAB METAL DECK

(PERPENDICULAR TO FLUTES)

/8

/8

METAL DECK

(PARALLEL TO FLUTES)

1" 1"

/8

SLOTTED TOP

TRACK

2"x20 GA

STRAPS @ 16"

O.C.

STEEL BEAM

/8

20 GA Z-BARS

TO

ACCOMMODATE

SFRM

SPRAY-APPLIED

FIRE-RESISTIVE

MATERIAL

(SFRM)

SAB

GWB

ACOUSTICAL SEALANT

CUT ONE LAYER GWB TO

FOLLOW PROFILE OF DECKING.

SEAL CONTINUOUSLY WITH

ACOUSTICAL SEALANT.

FILL FLUTE VOID W/

SAB

GWB SOUND AND

SMOKE CLOSURE

STRIP SECURE TO

STRUCTURE AND SEAL

WITH ACOUSTICAL

SEALANT

ACOUSTICAL

SEALANT (BOTH

SIDES)

STUD

SAB

GWB

ACOUSTICAL SEALANT

(BOTH SIDES)

"SMOKE PARTITIONS AND SOUND-CONTROL WALLS"- ADDITIONAL NOTES:

1. UPGRADE TO DETAIL "B5" WHERE WALL IS DESIGNATED WITH A FIRE-RESISTANCE RATING.

2. FILL VOIDS WITH SOUND ATTENUATION BATTS (SAB).

3. SOUND WALLS AND SMOKE PARTITIONS REQUIRE THAT AT LEAST ONE LAYER OF GWB BE CUT TO FOLLOW UNDULATING SURFACES OF SUPERSTRUCTURES INCLUDING BUT NOT LIMITED TO FLUTES METAL DECKING. JOINT GWB TO SUPERSTRUCTURE WITH A CONTINUOUS BEAD OF ACOUSTICAL SEALANT.

4. BUILDING CODE REQUIRES THAT "SMOKE PARTITIONS" BE SEALED TO STRUCTURE AS INDICATED TO SUCCESSFULLY "….LIMIT THE PASSAGE OF SMOKE….".

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753 mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:4

:4

A

M

14A-512

ARCHITECTURAL PARTITION HEAD DETAILS 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

3" = 1'-0" B5

HEAD-OF-WALL CONDITIONS - STUD WALLS - FIRE RATED WALLS

3" = 1'-0" D5

HEAD-OF-WALL CONDITIONS - STUD WALLS - SMOKE PARTITIONS AND SOUND CONTROL WALLS

NOTE:

STANDARD DETAILS APPLY TO TYPICAL CONSTRUCTION

TYPES AND ASSEMBLIES. NOT ALL DETAILS MAY BE

USED. CONTRACTOR SHALL VERIFY ACTUAL CONDITIONS

ON-SITE.

Revisions: Date:

Addendum 1 02/25/2026

SHEET SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

GENERAL INTERIOR NOTES

KEYNOTES

GENERAL FINISH NOTES:

1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND

INSTALLATION REQUIREMENTS.

2. REFER TO THIS SHEET FOR FINISH LEGEND AND ROOM FINISH

SCHEDULE.

3. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN

FOR CONSISTENCY.

SUBSTITUTION NOTES:

1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR

SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.

TRANSITION NOTES:

1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.

2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT

DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR

WHEN DOOR PANEL IS IN THE CLOSED POSITION.

SIGNAGE NOTES:

1. REFER TO THIS SHEET SERIES SHEETS FOR SIGNAGE INFORMATION,

REFER TO SPECIFICATIONS FOR ADDITIONAL SIGNAGE,

IDENTIFICATION AND SYSTEMS/EQUIPMENT LABELING

REQUIREMENTS.

PAINTING NOTES:

1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED

ITEMS OR INSTALLER FINISHED ITEMS.

3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.

PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD

TO ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.

CODE NOTES:

1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE

WITH IBC 2024 803.13 INTERIOR WALL AND CEILING FINISH

REQUIREMENTS BY OCCUPANCY.

INSTALLATION NOTES:

1. PROVIDE BACKING FOR ALL WALL MOUNTED EQUIPMENT.

MATERIAL FLOOR CHANGE (REFER TO THIS SHEET FOR DETAILS)

INTERIOR FINISH SYMBOLS

CONCRETE WITH STATIC DISSIPATIVE COATING (C-1/SDC)

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

WALL BASE

JOHNSONITE*

BEIGE 49

RB-1

PAPER INSERT CARRIER, MAGNETIC

MOUNT, WITH NON-GLARE LENS

TEXT: 5/8"H LASER-PRINTED TEXT,

HELVETICA MEDIUM

COLOR: TO MATCH STATION

STANDARDS

1-1/2" x 1/32" ADA

TACTILE NUMERALS

AND GRADE II BRAILLE234

9"

Restricted Access5-3/16" X 9" CLEAR

ACETATE INSERT W/

COPY

9"X9" MAGNETICALLY

REMOVABLE SIGN

(ONE-PIECE)

RED SYMBOL AND

BLACK TEXT

1/2" 9" 1/2"

/2

/2

QUARTER-ROUND

SILVER FRAME

EXISTING FLOORING

TO BE REMOVED

TOP OF SLAB

EXISTING

FLOORING TO

REMAIN, EXISTING

ROOM SIDE EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

RESILIENT BASE AS

SCHEDULED, EACH

SIDE OF NEW WALL

INSTALL 3/4"

PLYWOOD TO 8'AFF,

MOUNT BOTTOM OF

PLYWOOD 12" AFF

ADJACENT SPACE

TELECOM

ROOM SIDE

PARTITION AS SCHEDULED

EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

LOCATION OF FLOOR

FINISH CHANGE;

SEAM OR ADAPTER

TRANSITION SHALL

OCCUR AT

CENTERLINE OF

DOOR IN CLOSED

POSITION

DOOR AS SCHEDULED

EXISTING FLOORING

TOP OF SLAB

CORRIDOR SIDE

DOOR FRAME BEYOND

C CENTER LINE OF DOORL

TRANSITION STRIP

(TR-1) OR EQUAL,

REFER TO SCHEDULE

FOR INFORMATION

TELECOM ROOM SIDE

SIGNAGE REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

SIGN SYMBOL LEGEND

IN-08.02

IN-04.01A

IN-01.31

F1

14IN101

TYP.

F4

14IN101

TYP.

TELECOM ROOM FINISH

DIAGRAM, CONTRACTOR TO

REFERENCE ARCHITECTURE

FOR ACTUAL WALL

CONSTRUCTION LOCATIONS

1 2 5 6

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:4

:4

A

M

14IN101

INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

NTS

C1

COLOR BOARD

3" = 1'-0" D3

IN-04.01A SIGN DETAIL - PRIMARY ROOM

IDENTIFICATION

3" = 1'-0"

D1

IN-08.02 SIGN DETAIL - PROHIBIT

INSTRUCTIONAL AND CONTROL

NTS

D5

EXAMPLE OF EXISTING SIGNAGE

6" = 1'-0" F4

RESILIENT BASE (TOE BASE)

6" = 1'-0"

F1

THRESHOLD - CONCRETE TO EXISTING FLOORING

1 REMOVE EXISTING FLOORING, ADHESIVES, AND INSTALL NEW WALL

BASE

2 EXISTING WALLS ARE TO BE PATCHED AND PAINTED. SEE ROOM

FINISH SCHEDULE THIS SHEET FOR FINISHES.

3 ALL WALLS TO RECEIVE NEW PLYWOOD, COORDINATE WITH

ELECTRICAL DRAWINGS FOR FIXTURE LOCATIONS

4 PROVIDE NEW ROOM SIGNAGE, SEE SIGNAGE SCHEDULE THIS

SHEET

5 REFER TO ARCHITECTURAL PLANS FOR DETAILED ROOM

CONFIGURATION INFORMATION

6 TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE

SEALER

REFER TO THIS SHEET FOR ROOM FINISH SCHEDULE & FINISH LEGEND

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

LEVEL 1 119 TELECOM ROOM C-1/SDC RB-1 GWB P-1/WD GWB P-1/WD GWB P-1/WD GWB P-1/WD OPEN

BUILDING SIGNAGE SCHEDULE

VERSIO

N TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE

ADA

BRAILLE TEXT COLOR BACKGROUND COLOR

DIMENSIONS

CommentsSIGN_HEIGHT SIGN_WIDTH MOUNTING HEIGHT

IN-01.31 1 FIRE IDENTIFICATION SIGN D6/ IN101 FEC REFER TO PAGE 429 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO WHITE RED 9" 9" 6' - 8" INSTALLED AT FIRE EXTINGUISHER CABINETS AT ALL

NEW TELECOM ROOMS

IN-04.01A 1 ROOM NUMBER IDENTIFICATION D3/ IN101 TELECOM ROOM REFER TO PAGE 261 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

YES REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 0" INSTALLED AT ALL NEW TELECOM ROOMS

IN-08.02 1 PROHIBIT INSTRUCTIONAL AND

CONTROL

D1/ IN101 TELECOM ROOM REFER TO PAGE 279 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 9" INSTALLED AT ALL NEW TELECOM ROOMS MOUNTED

DIRECTLY ABOVE ROOM NAME SIGN

Grand total: 3

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

C-1/SDC CONCRETE WITH STATIC DISSIPATIVE COATING SEALED CONCRETE* - - - - - TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE SEALER

F-1 WINDOW FILM 3M* FASARA 7725SE-324 FROSTED CRYSTAL - 08 87 33

P-1 PAINT CALIFORNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

RB-1 RESILIENT BASE JOHNSONITE* TRADITIONAL TOE BASE BEIGE 49 4" 09 65 13

TR-1 TRIM SCHLUTER * - RENO-U SATIN ANODIZED ALUMINUM - 09 30 13 FLOOR TRANSITION

WD PLYWOOD FIRE TREATED PLYWOOD* - - HIGH GLOSS WHITE MPI (MASTER PAINTERS INSTITUTE)

67 OR SIM

4' X 8' - PLYWOOD TO BE PAINTED WITH 2 COATS OF FIRE RESISTANT PAINT; ;FIRE RATING

STAMPS SHALL NOT BE PAINTED OVER

*Materials are approved as basis of design, all material substitutions are subject to owner approval. Contractor to provide VA Interior Design Department with samples of all specified finish materials. VA COR/ Interior Design department shall approve all finishes prior to installation.

3" = 1'-0" D6

IN-01.31 SIGN DETAIL - FIRE EQUIPMENT

IDENTIFICATION SIGN

1/2" = 1'-0" F7

TYPICAL TELECOM ROOM FINISH DIAGRAM

Revisions: Date:

Addendum 1 02/25/2026

EXISTING FLOORING

TO BE REMOVED

TOP OF SLAB

EXISTING

FLOORING TO

REMAIN, EXISTING

ROOM SIDE EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

RESILIENT BASE AS

SCHEDULED, EACH

SIDE OF NEW WALL

INSTALL 3/4"

PLYWOOD, MOUNT

BOTTOM OF

PLYWOOD 12" AFF

ADJACENT SPACE

TELECOM

ROOM SIDE

PARTITION AS SCHEDULED

Sheets
14A-401 - ARCHITECTURAL ENLARGED VIEWS - FIRST LEVEL
14A-512 - ARCHITECTURAL PARTITION HEAD DETAILS
14H-101 - HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL
14IN101 - INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES