Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77626R0003
About this file
This is an architectural drawing set for interior construction work at the Edith Nourse Memorial Veterans Hospital in Bedford, Massachusetts. The drawings are part of the EHRM Infrastructure Upgrades project (Project Number 518-22-700) issued for construction on June 4, 2025, with an addendum dated February 25, 2026.
The work involves renovation of Room 150, including demolition of existing construction elements and installation of new components. Key requirements include: installation of a new 45-minute fire-rated hollow metal door with frame (3'-0" W x 7'-0" H); application of two paint finishes—California Paints matching Benjamin Moore Manchester Tan HC-81 (eggshell) for walls and Benjamin Moore White Down OC-131 (semi-gloss) for metal doors and trim; repair of existing finishes as needed for new door installation; and provision of temporary dust-tight barriers during dusty construction activities. Contractors are responsible for all costs associated with moving, storing, and returning furnishings and equipment, including disassembly and reassembly of systems furniture following manufacturer warranties. Field verification of all dimensions, conditions, and site-specific information is required at the time of bidding. The specifications reference additional details in sections 08 71 00 (door hardware) and 09 91 00 (paint), with coordination required between construction trades and electrical systems. The design is fully sprinklered and must comply with VA Physical Security Standards and campus standards.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
UPUP
UP
DN
DN
DN
DN
SHEET SYMBOL LEGEND
KEYNOTES
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES
INFORMATION.
C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED
AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,
AND CAMPUS STANDARDS.
E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.
F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.
G. SEE TYPICAL CEILING DETAILS ON SHEET A-531
H. ALL PHOTOS SHOWN REFLECT EXISTING CONDITIONS AS OF THE
DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE
TIME OF BIDDING.
I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH
MOVING, STORING AND RETURNING FURNISHINGS AND EQUIPMENT
TO THE PROPOSED WORK AREA(S). ANY DISASSEMBLY AND
REASSEMBLY OF SYSTEMS FURNITURE IN THE PROPOSED WORK
AREAS IS THE RESPONSIBILITY OF THE CONTRACTOR AND MUST
FOLLOW THE MANUFACTURER'S WARRANTY.
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
6 7 8
F
G
6 7 8
F
G
ROOM
272 SF
H W
-S H
-3 F
05A-401
B7
ROOM
150150
STORAGE
114A114A
ROOM
272 SF
INTERIOR FINISHES
PAINT
FIELD
CALIFORNIA PAINTS*
TO MATCH BENJAMIN MOORE
MANCHESTER TAN HC-81
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
NB KLM
Project Number
Board Number
Office of Construction and Facilities Management
*BASIS OF DESIGN
**MATCH EXISTING CAMPUS PAINT COLORS
EHRM INFRASTRUCTURE
UPGRADES
518-22-700
200 Springs Road, Bedford, MA 01730
EDITH NOURSE MEMORIAL VETERANS HOSPITAL
P-1
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
PAINT
METAL DOORS & TRIM
CALIFORNIA PAINTS*
TO MATCH BENJAMIN MOORE
WHITE DOWN OC-131
P-2
1/2" 1/2"
VARIES
SEE PLAN
WALL - SEE PLAN
FOR TYPE
SEALANT - EA. SIDE
& ALL AROUND,
TYP.
HOLLOW METAL
FRAME
/2
V
A R
IE
S
S E
E P
L A
N
/2
UNO
4" 2"
ADJACENT WALL
WHERE OCCURS
SEALANT - EA SIDE &
ALL AROUND, TYP.
HOLLOW METAL FRAME
WALL - SEE PLAN
FOR TYPE
E5
TYPICAL FRAME
H E
IG
H
T
2" WIDTH 2"
E6
FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS
F
FLUSH
ROOM
150150
ROOM
150150
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
100 Pearl Street, 14th Floor
Hartford, CT 06103
MAT PERKINS
860-270-0753 mat.perkins@triplecaeg.com
A u to d e s k D o c s /3
C
R
.P ro je c t.
-2
-7
.E H
R M
.I U
.B e d fo rd
.M A
.R
/5
-2 -7
.B e d fo rd .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:5
:0
A
M
05A-401
ARCHITECTURAL ENLARGED VIEWS & INTERIOR
FINISH SCHEDULES
518-22-700
06/04/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
200 Springs Rd, Bedford, MA 01730
NTS
C2
COLOR BOARD
1/4" = 1'-0"
C7
ARCHITECTURAL FLOOR PLAN - FIRST LEVEL - RM 150 - DEMO
1/4" = 1'-0" B7
ARCHITECTURAL FLOOR PLAN - FIRST LEVEL - RM 150 - NEW
1/32" = 1'-0" F7
FIRST FLOOR REFERENCE PLAN
1 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA
DURING ANY ACTIVITIES WHICH PRODUCE DUST - TYPICAL
2 REMOVE EXISTING DOOR AND FRAME
3 NEW 45 MIN. FIRE RATED DOOR. SEE DOOR SCHEDULE AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY DOOR AS
REQUIRED FOR NEW ACCESS CONTROL HARDWARE.
4 EXISTING CEILING TO REMAIN
5 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.
REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS
BUILDING.
FINISH LEGEND
SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES
P-1 PAINT CALIFIRNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD
P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM
ROOM FINISH SCHEDULE
LEVEL NO. NAME
FLOOR WALLS CEILING
NOTESFINISH BASE
NORTH EAST SOUTH WEST
MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
LEVEL 1 150 ROOM EXISTING EXISTING GWB EXISTING GWB EXISTING GWB EXISTING GWB EXISTING EXISTING REPAIR EXISTING FINISHES AS NEEDED FOR NEW DOOR INSTALLATION.
DOOR AND FRAME SCHEDULE
IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL FIRE
RATING
HARDWARE
NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB GROUP ELECTRICAL
LEVEL 1 150 ROOM 150 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 E5/ 05A-401 E6/ 05A-401 45 MIN. HW-SH-3F SEE SPEC 1
3" = 1'-0" E5
HOLLOW METAL HEAD DETAIL
3" = 1'-0"
E6
HOLLOW METAL JAMB DETAIL
1/4" = 1'-0" E2
WRAPPED FRAME TYPES ELEVATIONS
1/4" = 1'-0" C5
ARCHITECTURAL REFLECTED CEILING PLAN - FIRST LEVEL - RM 150 - DEMO
1/4" = 1'-0" B5
ARCHITECTURAL REFLECTED CEILING PLAN - FIRST LEVEL - RM 150 - NEW
1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.
NOT TO SCALE
F5
EXISTING CONDITIONS - RM 150
Revisions: Date:
Addendum 1 02/25/2026
02/25/2026
| Sheets |
| 05A-401 - ARCHITECTURAL ENLARGED VIEWS & INTERIOR FINISH SCHEDULES |
File details come from the government source that posted it. Updated .