Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf
PDF 3 MB Posted
- Solicitation number
- 36C77626R0003
About this file
This is an architectural drawing set for interior finishes and construction details at the Edith Nourse Rogers Memorial Veterans Hospital in Bedford, Massachusetts, as part of the EHRM Infrastructure Upgrades project (Project Number 518-22-700).
The drawings specify interior renovation work for Room 100A (M&O Foreman Office, 202 square feet) on the First Level of Building B19, including demolition of existing doors and frames and installation of new 45-minute fire-rated hollow metal doors with frames. The architectural documents include floor plans, reflected ceiling plans, door and frame type elevations, and detailed hollow metal head and jamb construction details. Interior finishes include two paint specifications: P-1 (California Paints semi-gloss to match Benjamin Moore White Down OC-131 for metal doors and trim) and P-2 (California Paints eggshell to match Benjamin Moore Manchester Tan HC-81 for field application). The door schedule identifies Door 167 (3'-0" wide by 7'-0" tall, 1¾" thick flush hollow metal panel door with hardware group HW-SH-3F). Construction requirements include temporary dust-tight barriers, coordination with mechanical and electrical systems, contractor responsibility for moving and storing furnishings and equipment, and VA Interior Design Department approval of all finish material samples prior to installation. The drawing set was issued for construction on June 4, 2025, with one addendum issued on February 25, 2026, prepared by TRIPLE C – The A/E Group (Hartford, Connecticut) under the direction of Architect/Engineer of Record Mat Perkins.
View the file
Other files
Show 40 more
Latest 50 of 105 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
UP
SHEET SYMBOL LEGEND
KEYNOTES
GENERAL NOTES
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE DEMOLISHED
NEW CONSTRUCTION, WITH PARTITION TYPE
A
A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT
REQUIREMENTS AND PROJECT LOCATION DRAWINGS.
B. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
SYSTEMS INFORMATION.
C. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL
DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE
TIME OF BIDDING.
D. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED
WITH MOVING, STORING AND RETURNING FURNISHINGS AND
EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY
DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE
PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE
CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S
WARRANTY.
PARTITION RATING GRAPHICS:
4 HR FIRE BARRIER
3 HR FIRE BARRIER
2 HR FIRE & SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE BARRIER/SHAFT
1 HR FIRE & SMOKE BARRIER
1 HR FIRE BARRIER
1 HR FIRE BARRIER/SHAFT
SMOKE PARTITION (NON RATED)
NON RATED
PARTITION RATING GRAPHIC DESIGNATION: PRIORITY
1 HIGHEST
5 LOWEST
PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE
RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN
GRAPHICALLY ON PLANS WITH HATCH PATTERNS.
1/2" 1/2"
VARIES
SEE PLAN
WALL - SEE PLAN
FOR TYPE
SEALANT - EA. SIDE
& ALL AROUND,
TYP.
HOLLOW METAL
FRAME
/2
V
A R
IE
S
S E
E P
L A
N
/2
UNO
4" 2"
ADJACENT WALL
WHERE OCCURS
SEALANT - EA SIDE &
ALL AROUND, TYP.
HOLLOW METAL FRAME
WALL - SEE PLAN
FOR TYPE
E3
TYPICAL FRAME
H E
IG
H
T
2" WIDTH 2"
E4
FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS
F
FLUSH
ELECTRICAL/
PIPE
FITTING
WORK
LEADERS
OFFICE
100C100C
M&O
FOREMAN
OFFICE
100A
202 SF
N
O
M&O
FOREMAN
OFFICE
100A
202 SF
H W
-S H
-3 F
M&O
FOREMAN
OFFICE
100A100A
21_19A-401
B8
M&O
FOREMAN
OFFICE
100A100A
N
O
M&O
FOREMAN
OFFICE
100A100A
INTERIOR FINISHES
ARCHITECT/ENGINEERS:
INTERIOR FINISHES
Drawing Title
Approved: Project Director
Project Title
Location
Date Checked Drawn
NB KLM
Project Number
Board Number
Office of Construction and Facilities Management
*BASIS OF DESIGN
**MATCH EXISTING CAMPUS PAINT COLORS
EHRM INFRASTRUCTURE
UPGRADES
518-22-700
200 Springs Road, Bedford, MA 01730
EDITH NOURSE MEMORIAL VETERANS HOSPITAL
DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER
TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION
PAINT
METAL DOORS & TRIM
CALIFORNIA PAINTS*
TO MATCH BENJAMIN MOORE
WHITE DOWN OC-131
P-2
PAINT
FIELD
CALIFORNIA PAINTS*
TO MATCH BENJAMIN MOORE
MANCHESTER TAN HC-81
P-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
TRIPLE C - The A/E Group
100 Pearl Street, 14th Floor
Hartford, CT 06103
MAT PERKINS
(860)270-0753
A u to d e s k D o c s /3
C
R
.P ro je c t.
-2
-7
.E H
R M
.I U
.B e d fo rd
.M A
.R
/5
-2 -7
.B e d fo rd .E
H R
M .A
R C
H .B
R
.r v t
/2
/2
:1
:4
A
M
21_19A-401
ARCHITECTURAL ENLARGED VIEWS AND
INTERIOR FINISH SCHEDULES
518-22-700
21_19
06/04/2025 M. Perkins K. McDermott
ISSUED FOR
CONSTRUCTION
EHRM INFRASTRUCTURE
UPGRADES
200 Springs Rd, Bedford, MA 01730
NTS
C3
COLOR BOARD
3" = 1'-0" E3
HOLLOW METAL HEAD DETAIL
3" = 1'-0"
E4
HOLLOW METAL JAMB DETAIL
1/4" = 1'-0" E1
DOOR AND FRAME TYPES ELEVATIONS
1 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA
DURING ACTIVITIES WHICH PRODUCE DUST
2 DEMO EXISTING DOOR AND FRAME
3 NEW 45 MIN. FIRE RATED DOOR AND FRAME. SEE DOOR SCHEDULE
AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY
DOOR AS REQUIRED FOR NEW ACCESS CONTROL HARDWARE.
4 EXISTING CEILING TO REMAIN
1/32" = 1'-0" F8
FIRST LEVEL REFERENCE PLAN
1/4" = 1'-0" D8
ARCHITECTURAL FLOOR PLAN - FIRST LEVEL
- RM 100A - DEMO
1/4" = 1'-0" B8
ARCHITECTURAL FLOOR PLAN - FIRST LEVEL
- RM 100A - NEW
DOOR AND FRAME SCHEDULE
IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL
FIRE RATING
HARDWARE
NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL
B19-LEVEL 1 100A M&O FOREMAN OFFICE 167 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 C3/21_19A-401 D3/21_19A-401 - 45 MIN HW-SH-3F SEE SPEC 1.
1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.
1/4" = 1'-0" D6
ARCHITECTURAL REFLECTED CEILING PLAN -
FIRST LEVEL - RM 100A - DEMO
1/4" = 1'-0" B6
ARCHITECTURAL REFLECTED CEILING PLAN -
FIRST LEVEL - RM 100A- NEW
ROOM FINISH SCHEDULE
LEVEL NO. NAME
FLOOR WALLS CEILING
NOTESFINISH BASE
NORTH EAST SOUTH WEST
MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH
B19-LEVEL 1 100A M&O FOREMAN OFFICE EXISTING EXISTING GWB EXISTING GWB EXISTING GWB EXISTING GWB EXISTING EXISTING REPAIR EXISTING FINISHES AS NEEDED FOR NEW DOOR INSTALLATION.
FINISH LEGEND
SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES
P-1 PAINT CALIFORNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD
P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM
*Materials are approved as basis of design, all material substitutions are subject to owner approval. Contractor to provide VA Interior Design Department with samples of all specified finish materials. VA COR/ Interior Design department shall approve all finishes prior to installation.
1/32" = 1'-0" F6
FIRST LEVEL - RM 100
Number Revisions: Date:
1 Addendum 1 02/25/2026
02/25/2026
| Sheets |
| 21_19A-401 - ARCHITECTURAL ENLARGED VIEWS AND INTERIOR FINISH SCHEDULES |
File details come from the government source that posted it. Updated .