Amend 5 - ATT 21-518-22-700.Bedford.EHRM.IFC.Add1.B18.20260225.pdf

PDF 8 MB Posted

Attached to
Y1DA--518-22-700 EHRM Infrastructure Upgrades Construction Bedford VAMC
Solicitation number
36C77626R0003
Issued by

About this file

Federal Contract Opportunity Summary

This document is a Hazardous Material Abatement Plan (set of architectural and MEP drawings) for infrastructure upgrades at Edith Nourse Memorial Veterans Hospital in Bedford, Massachusetts. The project involves removal and abatement of asbestos-containing materials (ACM), lead-based paint (LBP), and associated contaminated materials from the first level of Building 18, with 160 square feet of lead-containing paint identified for abatement. The U.S. Department of Veterans Affairs (VA) is the federal agency overseeing the project under Project Number 518-22-700. TRIPLE C - The A/E Group serves as the Architect/Engineer of Record (100 Pearl Street, 14th Floor, Hartford, CT 06103).

The contract requires contractors to comply with all applicable federal, state, and local regulations including OSHA standards for silica dust control (29 CFR 1926.1153 and 29 CFR 1910.134), EPA requirements, and Massachusetts Department of Public Health and Environmental Conservation directives. All asbestos disturbance must be performed by a Massachusetts-licensed asbestos abatement contractor, and all lead-based paint disturbance by a Massachusetts-licensed lead abatement contractor. Key deliverables include: written standard operating procedures for worker and environmental protection; drawings indicating negative pressure equipment, airlocks, and decontamination chambers with air change calculations; daily debris removal with proper packaging and warning labels; waste shipment records provided within 35 days; and coordination with an industrial hygienist for final confirmation of abated areas. The contractor must maintain means of egress, provide containment barriers, coordinate phasing with the Contracting Officer Representative (COR), and restore any damaged building components to original condition at no additional cost to the VA.

View the file

Other files

File Type Posted
36C77626R0003 0011.pdf PDF
36C77626R0003 0010.pdf PDF
36C77626R0003 0009.pdf PDF
Amendment 9 - ATT 1 - RFI Responses updated 041426.pdf PDF
Amendment 8 - ATT 2 - 518-22-700 Summary Log_ADD4_20260413.pdf PDF
Amendment 8 - ATT 3 - 518-22-700.Bedford.MA.EHRM.Specs.IFC.20260413.pdf PDF
Amendment 8 - ATT 1 - RFI Responses updated 041326.pdf PDF
36C77626R0003 0008.pdf PDF
Amendment 7 -ATT 2 - 25 10 10 - Advanced Utility Metering System.Add3.20260408.pdf PDF
Amendment 7 - ATT 1 - 518-22-700.Summary Log_ADD3.20260408.pdf PDF
36C77626R0003 0007.pdf PDF
36C77626R0003 0006.pdf PDF
Amendment 6 - ATT 1 - RFI Responses updated 033126.pdf PDF
Amend 5 - ATT 9 -518-22-700.Bedford.EHRM.IFC.Add1.B04.20260225.pdf PDF
Amend 5 - ATT 26 -518-22-700.Bedford.EHRM.IFC.Add1.B61.2060225.pdf PDF
Amend 5 - ATT 6 -518-22-700.Bedford.EHRM.IFC.Add1.B01.20260225.pdf PDF
Amend 5 - ATT 24-518-22-700.Bedford.EHRM.IFC.Add1.B22.2060225.pdf PDF
Amend 5 - ATT 2 - Inspection and Lead Paint Screening Report Final.pdf PDF
Amend 5 - ATT 28-518-22-700.Bedford.EHRM.IFC.Add1.B70.2060225.pdf PDF
Amend 5 - ATT 14-518-22-700.Bedford.EHRM.IFC.Add1.B09.20260225.pdf PDF
Amend 5 - ATT 3 - 04 72 00 - Cast Stone Spec.pdf PDF
Amend 5 - ATT 16-518-22-700.Bedford.EHRM.IFC.Add1.B13.20260225.pdf PDF
Amend 5 - ATT 23-518-22-700.Bedf.EHRM.IFC.Add1.B21_19.2060225.pdf PDF
Amend 5 - ATT 22-518-22-700.Bedford.EHRM.IFC.Add1.B20.2060225.pdf PDF
Amend 5 - ATT 18-518-22-700.Bedford.EHRM.IFC.Add1.B15.20260225.pdf PDF
Amend 5 - ATT 29-518-22-700.Bedford.EHRM.IFC.Add1.B78.2060225.pdf PDF
Amend 5 - ATT 8 -518-22-700.Bedford.EHRM.IFC.Add1.B03.20260225.pdf PDF
36C77626R0003 0005.pdf PDF
Amend 5 - ATT 19-518-22-700.Bedford.EHRM.IFC.Add1.B16.2060225.pdf PDF
Amend 5 - ATT 20-518-22-700.Bedford.EHRM.IFC.Add1.B17.20260225.pdf PDF
Amend 5 - ATT 17-518-22-700.Bedford.EHRM.IFC.Add1.B14.20260225.pdf PDF
Amend 5 - ATT 11-518-22-700.Bedford.EHRM.IFC.Add1.B06.20260225.pdf PDF
Amend 5 - ATT 1 - 518-22-700.Summary Log_ADD1.20260225.pdf PDF
Amend 5 - ATT 31-518-22-700.Bedford.EHRM.IFC.Add1.B81.2060225.pdf PDF
Amend 5 - ATT 15-518-22-700.Bedford.EHRM.IFC.Add1.B10.20260225.pdf PDF
Amend 5 - ATT 27-518-22-700.Bedford.EHRM.IFC.Add1.B62.20260225.pdf PDF
Amend 5 - ATT 10-518-22-700.Bedford.EHRM.IFC.Add1.B05.20260225.pdf PDF
Amend 5 - ATT 7 -518-22-700.Bedford.EHRM.IFC.Add1.B02.20260225.pdf PDF
Amend 5 - ATT 13-518-22-700.Bedford.EHRM.IFC.Add1.B08.20260225.pdf PDF
Amend 5 - ATT 4 - 08 87 33 - Decorative Film.pdf PDF
Amend 5 - ATT 25 -518-22-700.Bedford.EHRM.IFC.Add1.B33.2060225.pdf PDF
Amend 5 - ATT 35-518-22-700.Bedf.EHRM.IFC.Add1.SITE.20260225.pdf PDF
Amend 5 - ATT 32-518-22-700.Bedford.EHRM.IFC.Add1.B82.2060225.pdf PDF
Amend 5 - ATT 30-518-22-700.Bedford.EHRM.IFC.Add1.B80.2060225.pdf PDF
Amend 5 - ATT 12-518-22-700.Bedford.EHRM.IFC.Add1.B07.20260225.pdf PDF
Amend 5 - ATT 33-518-22-700.Bedford.EHRM.IFC.Add1.BCH.2060225.pdf PDF
Amend 5 - ATT 34-518-22-700.Bedford.EHRM.IFC.Add1.MCR.2060225.pdf PDF
Amend 5 - ATT 5 - 34 71 13 PASSIVE VEHICLE BARRIERS.pdf PDF
Amendment 4 - ATT 1 - RFI Responses updated 032626.pdf PDF
S06 - Amendment 0003 - ATT 1 - RFI Responses_Bedford.pdf PDF
Show 40 more

Latest 50 of 105 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZARDOUS MATERIAL ABATEMENT GENERAL NOTES

1. ALL HAZARDOUS MATERIAL REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS, REGULATIONS, ORDERS AND

DIRECTIVES INCLUDING WITHOUT LIMITATIONS THOSE OF THE RESPONSIBLE STATE OF

MASSACHUSETTS AGENCIES, U.S. ENVIRONMENTAL PROTECTION AGENCY, U.S. DEPARTMENT OF

LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, NATIONAL INSTITUTE OF OCCUPATIONAL SAFETY AND HEALTH, STATE OF MASSACHUSETTS DEPARTMENT OF PUBLIC HEALTH, AND THE STATE OF

MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL CONSERVATION

2. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS FOR SILICA DUST CONTROL 29 CFR 1926.1153, 29 CFR 1910.134

3. CONTRACTOR SHALL USE EXTREME CARE AND CAUTION DURING ALL ABATEMENT PROCEDURES.

CONTRACTOR SHALL CONDUCT REMOVAL OF ALL MATERIALS FROM THE SITE WITH A MINIMUM

DISTURBANCE AND PROVIDE REGULAR MAINTENANCE AND PROTECTION OF THE BUILDING PREMISES, STAGING AREA, TRANSPORTATION ROUTES, ETC, THROUGHOUT THE BUILDING. REFER TO THE ICRA PLANS FOR GUIDANCE ON PLANNED DEBRIS TRANSPORT PATHS. COORDINATE PHASING OF WORK AND HAZARDOUS MATERIAL CONTAINMENT PLANS WITH THE COR. COORDINATE USAGE OF STAIRS VS USAGE OF CHUTE FOR DISPOSAL OF REMOVED HAZARDOUS MATERIAL ON THE FIRST LEVEL. THE ABATEMENT

CONTRACTOR SHALL PREPARE THE WORK AREA FOR REMOVAL IN ACCORDANCE WITH APPLICABLE

REGULATIONS. WHERE OVERLAPS OCCUR, THE MOST STRINGENT REQUIREMENTS APPLY.

4. THE DISTURBANCE OF ANY ACM, OR SUSPECT ACM, SHALL BE PERFORMED BY A MAS LICENSED

ASBESTOS ABATEMENT CONTRACTOR.

5. THE DISTURBANCE OF ANY LEAD-BASED PAINT, OR SUSPECT LBP, SHALL BE PERFORMED BY A MAS LICENSED LEAD ABATEMENT CONTRACTOR. LEAD CONTAINING PAINT AND CONTAMINATED MATERIALS

SHALL BE REMOVED AND DISPOSED OF IN COMPLIANCE WITH EPA AND OSHA REGULATIONS.

6. CONTRACTOR TO MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM OWNER AND AHJ IF EXISTING MEANS OF EGRESS MUST BE COMPROMISED OF MATERIAL EQUIPMENT, WASTE TRAILERS/DUMPSTERS, AS WELL AS CONTRACTOR PARKING SHALL BE COORDINATED WITH THE REST OF THE CONTRACT DOCUMENTS, THE GENERAL

CONTRACTOR, AND THE COR.

7. CONTRACTOR SHALL DEVELOP AND IMPLEMENT WRITTEN STANDARD OPERATING PROCEDURES FOR

ABATEMENT WORK TO ENSURE MAXIMUM PROTECTION AND SAFEGUARDS FOR LEAD AND/OR

ASBESTOS EXPOSURE TO WORKERS, PATIENTS, EMPLOYEES, GENERAL PUBLIC, AND THE

ENVIRONMENT.

8. THE LOCATIONS OF SITE STORAGE SHALL BE COORDINATED WITH THE VA COR.

9. CONTRACTOR SHALL PROVIDE ALL TOOLS, SCAFFOLDING, LADDERS, BARRIERS, AND ASSOCIATED

MATERIALS AND EQUIPMENT REQUIRED TO COMPLETE ALL WORK INDICATED IN THE CONTRACT

DOCUMENTS. THE OWNER OR THEIR REPRESENTATIVE SHALL NOT BE RESPONSIBLE FOR LOST,

DAMAGED OR STOLEN ITEMS.

10. CONTRACTOR SHALL PROVIDE ALL SIGNS, LABELS, WARNINGS, AND POSTED INSTRUCTIONS THAT ARE

NECESSARY TO PROTECT, INFORM, AND WARN OF THE HAZARD FROM ASBESTOS EXPOSURE.

11. CONTRACTOR SHALL POST IN A PROMINENT AND CONVENIENT PLACE FOR LABORERS, A COPY OF THE

LATEST APPLICABLE REGULATIONS FROM OSHA, EPA, NIOSH, MASDPH, AND THE MASDEC.

12. CONTRACTOR SHALL COMPLETELY PROTECT ALL CONTROLS, CONDUIT, TUBING, ELECTRICAL PANELS, EQUIPMENT, ETC, SCHEDULED TO REMAIN WITHIN THE WORK AREAS.

13. ALL BUILDING FINISHES, CONSTRUCTION EQUIPMENT, OR OTHER COMPONENTS OF THE BUILDING WHICH ARE SCHEDULED TO REMAIN, THAT ARE DAMAGED OR ARE IN ANY WAY DISRUPTED AS A RESULT OF THE EXECUTION OF THIS CONTRACT ARE TO BE REPLACED OR RESTORED TO ORIGINAL CONDITIONS

BY THE CONTRACTOR, WITHOUT ADDITIONAL COST TO THE OWNER.

14. THE VA AND THE HAZARDOUS MATERIAL ABATEMENT CONTRACTOR SHALL MUTUALLY AGREE ON THE NUMBER AND LOCATION OF ANY REMOTE DECONTAMINATION UNITS DURING THE PRE-CONSTRUCTION

MEETING. TWO RECOMMENDED LOCATIONS HAVE BEEN PROVIDED ON THE DRAWINGS.

15. SUBMIT DRAWINGS INDICATING THE LOCATION AND NUMBER OF HEPA FILTER EQUIPPED NEGATIVE

PRESSURE MACHINES, AIRLOCKS, AND DECONTAMINATION CHAMBERS. SUBMIT CALCULATIONS

SHOWING THE NUMBER OF AIR CHANGES FOR EACH CONTAINMENTS AREA.

16. PHASE WORK AS REQUIRED BY THE GENERAL CONTRACTOR AND VA. CONTRACTOR TO COORDINATE DEMOLITION ACTIVITIES WITH COR TO MAINTAIN FULL FUNCTIONALITY OF ADJACENT OCCUPIED SPACES.

THE GROUND LEVEL IS INTENDED TO REMAIN OPERATIONAL DURING THIS PROJECT. UTILIZE GLOVEBAG

METHODS ON THE GROUND LEVEL TO MINIMIZE IMPACT ON BUILDING OPERATIONS.

17. CONTRACTOR TO PROVIDE FIRE, SMOKE, DIRT, DUST AND NOISE CONTAINMENT BARRIERS BETWEEN WORK AREA AND ADJACENT OCCUPIED SPACES. COORDINATE WITH VA ICRA, ASBESTOS, AND LEAD

ABATEMENT REQUIREMENTS, AND THE COR.

18. CONTRACTOR TO COORDINATE ALL UTILITY SYSTEM SHUTDOWN ACTIVITIES IN ADVANCE WITH THE COR.

ALL OCCUPIED SPACES ADJACENT TO THE AREA OF WORK ARE TO REMAIN OPERATIONAL.

19. WORK OUTSIDE OF NORMAL HOURS MUST BE APPROVED BY THE COR.

20. THE ASBESTOS ABATEMENT CONTRACTOR AND THE MECHANICAL AND PLUMBING CONTRACTORS SHALL

BE RESPONSIBLE FOR DISMANTLING ANY HVAC EQUIPMENT AS NECESSARY TO GAIN ACCESS TO ACM

ON HVAC EQUIPMENT FOR PROPER REMOVAL AND DISPOSAL.

21. CONTRACTOR TO REMOVE ALL DEMOLITION AND CONSTRUCTION DEBRIS ON A DAILY BASIS.

COORDINATE MEANS, METHODS AND ROUTES WITH VA ASBESTOS AND ICRA REQUIREMENTS, AND THE COR. ALL REMOVED HAZARDOUS MATERIALS AND HAZARDOUS MATERIAL CONTAMINATED WASTE SHALL BE PROPERLY PACKAGED PRIOR TO REMOVAL FROM THE WORK AREAS. WARNING LABELS SHALL BE APPLIED TO ASBESTOS WASTE AS APPROPRIATE. ALL ACM OR LCP REMOVED SHALL BE ACCOMPANIED BY A WASTE SHIPMENT RECORDS. COMPLETED WASTE SHIPMENT RECORDS SHALL BE PROVIDED TO THE OWNER AS A PART OF THE CLOSEOUT DOCUMENTATION, ORIGINAL RECORDS SHALL BE PROVIDED

TO THE OWNER WITHIN 35 DAYS OF WASTE LEAVING THE SITE.

22. CONTRACTOR TO ASSUME THAT ALL UNTESTED ORIGINAL BUILDING MATERIALS TO CONTAIN ASBESTOS OR LEAD, UNLESS SAID MATERIAL IS TESTED AND CONFIRMED AS CONTAINING LESS THAN THE REGULATED PERCENTAGE OF ASBESTOS AND/OR LEAD. EXISTING ACM HAS BEEN CONFIRMED IN PIPE INSULATION AND FITTINGS, SPECIFIC ORIGINAL FLOORING MATERIALS, AND IN TRANSITE PANELS AT RADIATORS BELOW WINDOWS. NO ASBESTOS CONTENT HAS BEEN IDENTIFIED IN SAMPLING OF CEILING TILES, DRYWALL, JOINT COMPOUND, SKIM COAT, FIBERBOARD, FIRESTOP, COVE BASE, MASONRY WINDOW CAULK, BATHROOM CAULK, TILE GROUT, TILE GLUE, CERAMIC TILES, OR SPECIFIC FLOORING MATERIALS. LEAD CONTAINING PAINT HAS BEEN IDENTIFIED IN AT LEAST ONE AREA IN THE FACILITY.

SHOULD ANY PREVIOUSLY UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL BE IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY OWNER FOR FURTHER DIRECTION.

UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR COLLECT OR ANALYZE BULK SAMPLES OF

SUSPECT MATERIALS WITHOUT THE APPROVAL OF THE OWNER.

23. ALL MATERIAL MEASUREMENTS, QUANTITIES, AND LOCATIONS ARE APPROXIMATE AND FOR GENERAL ORIENTATION ONLY. AS HIDDEN CONDITIONS ARE UNCOVERED, ADDITIONAL HAZARDOUS MATERIAL MAY

BE UNCOVERED THAT REQUIRE ABATEMENT. REFER TO SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

24. COORDINATE WITH INDUSTRIAL HYGIENIST FOR REVIEW OF MONITORING, AND FINAL CONFIRMATION OF

ABATED AREAS, REFER TO SPEC SECTION 02 82 13.13

KEYNOTES#

QUANTITIES - ACM /LEAD MATERIALSLEGEND

REMOVAL PATH

SAMPLE

HA ## SAMPLE LOCATION

ASBESTOS /

LEAD PAINT

NOT ALL SAMPLE LOCATIONS SHOWN FOR CLARITY. ONLY

POSITIVE OR POSITIVE STOP SAMPLES ARE LOCATED.

SAMPLE NUMBER PER SURVEY REPORT FROM TERRACON.

REFER TO SURVEY REPORT FOR SPECIFIC SAMPLE

INFORMATION

PATH INDICATED IS PROVIDED FOR INTENT ONLY.

COORDINATE FINAL REMOVAL PATHWAYS, PHASING, AND

METHODS WITH GENERAL CONTRACTOR AND COR.

160 SF LEAD CONTAINING PAINT TO BE ABATED

SAMPLE

PNT ##

OFFICE

101101

LAB

102102

OFFICE

103103

TOILET

104104

OFFICE

105105

HAC

106106

Room 107107

CONFERENCE

RM

108108

OFFICE

109109

STORAGE

110110

TOILET

111111

OFFICE

112112

Room 113113

OFFICE

114114

LAB

115115

OFFICE

116116

Room

OFFICE

118118

Room

CORRIDOR

120120

CORRIDOR

121121

STAIR

122122

HAC

121B121B

STAIR

111B111B

TELECOM

111A111A

UTILITY

CLOSET

121A121A

CLOSET

108A108A

CORRIDOR

123123CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

CLOSET

SAMPLE

PNT#219

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:3

:0

P

M

18H-101

HAZARDOUS MATERIAL ABATEMENT PLAN -

FIRST LEVEL

518-22-700

06/04/2025 M PERKINS J SONES

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1/8" = 1'-0" F3

HAZARDOUS MATERIAL ABATEMENT PLAN - FIRST LEVEL

1 PRIOR TO DEMO PROVIDE CONTAINMENT BARRIER AND PERSONNEL DECONTAMINATION FACILITY PER 02 82 11 DURING ABATEMENT WORK. COORDINATE TIMING WITH COR (48 HR MAX) TO MINIMIZE

DISRUPTION TO OCCUPIED SPACES.

2 ABATE AND REMOVE LEAD BASED PAINT THROUGHOUT ENTIRE ROOM. ASSUMED DOOR FRAMES ALSO CONTAIN LEAD BASED PAINT. DISPOSE OF FRAME PROPERLY WHERE FRAME IS BEING REMOVED.

WHERE FRAME IS TO REMAIN, ABATE AND REMOVE PAINT ON DOOR FRAME.

Number Revisions: Date:

1 Addendum 1 02/25/2026

02/25/2026

SHEET SYMBOL LEGEND

KEYNOTES

GENERAL NOTES

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

A

A. SEE GENERAL NOTES AND PLANS FOR TYPICAL GENERAL PROJECT

REQUIREMENTS AND PROJECT LOCATION DRAWINGS.

B. SEE INTERIOR FINISH DRAWINGS FOR ADDITIONAL FINISHES

INFORMATION.

C. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

SYSTEMS INFORMATION.

D. NEW TELECOM ROOMS SHALL BE 1 HOUR FIRE AND SMOKE RATED

AND COMPLY WITH THE LATEST VA PHYSICAL SECURITY STANDARDS,

AND CAMPUS STANDARDS.

E. SEE TYPICAL WALL FRAMING DETAILS ON SHEET A-511.

F. SEE TYPICAL HEAD OF WALL DETAIL ON SHEET A-512.

G. SEE TYPICAL CEILING DETAILS ON SHEET A-531

H. DATE OF THIS DRAWING SET. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS, CONDITIONS, AND SITE-SPECIFIC INFORMATION AT THE

TIME OF BIDDING.

I. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED

WITH MOVING, STORING AND RETURNING FURNISHINGS AND

EQUIPMENT TO THE PROPOSED WORK AREA(S). ANY

DISASSEMBLY AND REASSEMBLY OF SYSTEMS FURNITURE IN THE

PROPOSED WORK AREAS IS THE RESPONSIBILITY OF THE

CONTRACTOR AND MUST FOLLOW THE MANUFACTURER'S

WARRANTY.

PARTITION RATING GRAPHICS:

4 HR FIRE BARRIER

3 HR FIRE BARRIER

2 HR FIRE & SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE BARRIER/SHAFT

1 HR FIRE & SMOKE BARRIER

1 HR FIRE BARRIER

1 HR FIRE BARRIER/SHAFT

SMOKE PARTITION (NON RATED)

NON RATED

PARTITION RATING GRAPHIC DESIGNATION: PRIORITY

1 HIGHEST

5 LOWEST

PARTITIONS REQUIRED TO BE SMOKE RESISTANT, FIRE

RESISTANT, OR BOTH FIRE AND SMOKE RESISTANT ARE SHOWN

GRAPHICALLY ON PLANS WITH HATCH PATTERNS.

B

C

7 8

CORRIDOR

121121

3'-7 1/2"

3' -0

/2

3' -0

/2

3'-6"

10 10

B

C

7 8

E X

IS

T

V

IF

'-1

1/

2"

EXIST (VIF)

11'-8 1/2"

TELECOM

ROOM

168 SF

H W

-S H

-3 F

CORRIDOR

121121

B B

B

B

B

B

B

B B

B

B

BJ2

18A-401

B8

TELECOM

ROOM

110110

STORAGE

151 SF

ACOUSTICAL OR RATED

FLEXIBLE SEALANT

FLOOR LINE

ADD ONE LAYER OF 5/8" GWB,

ONE-SIDE WITH APPROVED UL

SETTING COMPOUND BETWEEN

LAYERS AND FASTENED TO

WALL AS REQUIRED, AT

EXISTING GWB WALL

ASSEMBLIES

STRUCTURAL DECK

EXISTING METAL STUDS AND

BATT INSULATION TO REMAIN

A/C GRADE, 3/4" FIRE-TREATED

PLYWOOD, ADHERED TO CONCRETE

AT EXISTING CONCRETE WALL

ASSEMBLIES

BOTTOM OF PLYWOOD

TO BE AT 12" AFF

UL DESIGN V497

1-HOUR PARTITION RATED FROM BOTH SIDES

EXISTING GWB OR

CONCRETE WALL

ASSEMBLY, WHERE OCCURS

SIDE OF

EXISTING

ROOM OR

CORRIDOR TO

REMAIN

18A-512

E5

18A-512

B4

1/2" 1/2"

VARIES

SEE PLAN

WALL - SEE PLAN

FOR TYPE

SEALANT - EA. SIDE

& ALL AROUND,

TYP.

HOLLOW METAL

FRAME

/2

V

A R

IE

S

S E

E P

L A

N

/2

UNO

4" 2"

ADJACENT WALL

WHERE OCCURS

SEALANT - EA SIDE &

ALL AROUND, TYP.

HOLLOW METAL FRAME

WALL - SEE PLAN

FOR TYPE

B4

TYPICAL FRAME

H E

IG

H

T

2" WIDTH 2"

C4

FRAME TYPE ELEVATIONS DOOR TYPE ELEVATIONS

F

FLUSH

B

C

7 8

TELECOM

ROOM

168 SF

STORAGE

110110

LINE OF

STRUCTURE

LINE OF

STRUCTURE

09 29 00

SOUND ATTENUATION BATTS

(SAB), WHERE OCCURS

NOTE:

IF PARTITION TYPE IS USED IN A

CHASE WALL CONDITION, PROVIDE

CROSS BRACING GUSSETS AT 48"

O.C. MAX VERTICALLY. FABRICATED

FROM 6" MTL STUDS.

6”

09 29 00

5/8" GWB

09 29 00

SAB RETAINER STRAP

WHERE SAB OCCURS

CEILING

07 92 00

SEALANT

09 22 16

METAL STUDS

18A-512

B4 18A-512

E5

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:5

:1

A

M

18A-401

ARCHITECTURAL ENLARGED VIEWS - FIRST

LEVEL

518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

1 REMOVE EXISTING FLOORING, ADHESIVES, AND WALL BASE

2 REMOVE EXISTING DOOR AND FRAME

3 NEW 45 MIN. FIRE RATED DOOR AND FRAME. SEE DOOR SCHEDULE

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. MODIFY DOOR

AS REQUIRED FOR NEW ACCESS CONTROL HARDWARE.

4 PROVIDE NEW FIRE EXTINGUISHER CABINET WITH A TYPE 2A: 10B: C

CLEAN AGENT FIRE EXTINGUISHER LOCATED NO GREATER THAN 75

FEET AWAY FROM THE NEW TR. CONTRACTOR TO COORDINATE THE

NEW LOCATION WITH THE COR. CONTRACTOR SHALL BID A NEW FEC

FOR EACH TR IN THE SCOPE

5 PROVIDE TEMPORARY DUST TIGHT BARRIER AROUND WORK AREA

DURING ACTIVITIES WHICH PRODUCE DUST

6 REMOVE EXISTING CEILING AND LIGHTS. MODIFY AND/OR PROVIDE

ADDITIONAL SUPPORTS AS REQUIRED FOR EXISTING CEILING ITEMS

TO REMAIN.

7 NEW FURRING WALL AT EXTERIOR WALL TO ENCLOSE WINDOW.

MAINTAIN 1/2" GAP BETWEEN EXISTING WALL INTERIOR FACE AND

NEW STUDS. MODIFY/ REMOVE INTERIOR WINDOW TRIM AS

REQUIRED. INSTALL WINDOW FILM AT ALL FURRED WINDOWS. SEE

18IN101 FOR MORE INFORMATION.

8 EXISTING WALL TO BECOME 1 HOUR FIRE AND SMOKE-RATED. PATCH

AND SEAL ALL PENETRATIONS AS NECESSARY.

9 OPEN TO DECK

10 DEMO EXISTING WALL AND FRAMING AS SHOWN ON PLAN

11 POTENTIAL ABATEMENT AT FLOOR FOR FLOOR PENETRATIONS.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS WITHIN THIS

BUILDING.

1/4" = 1'-0" D8

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 110 - DEMO

1/4" = 1'-0" B8

ARCHITECTURAL FLOOR PLAN - FIRST LEVEL

- RM 110 - NEW

1/16" = 1'-0" F6

FIRST LEVEL REFERENCE PLAN

NOTE: FIRE RESISTANCE TEST FOR TWO HOUR RATED WALLS: UL

V438, UL U411

(TYPE B) TYPICAL PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

B 2 1/2" 3/4" 45

DOOR AND FRAME SCHEDULE

IDENTIFICATION DIMENSIONS PANEL FRAME DETAIL

FIRE RATING

HARDWARE

NOTESLEVEL ROOM NO. ROOM NAME DOOR NO. W1 H T TYPE MATERIAL FINISH GLAZING UNDERCUT TYPE MATERIAL FINISH HEAD JAMB SILL GROUP ELECTRICAL

LEVEL 1 110 TELECOM ROOM 110 3' - 0" 7' - 0" 1 3/4" F HM P-2 NONE 3/8" 1 HM P-2 B4/18A-401 C4/18A-401 F1/18IN101 45 MIN. HW-SH-3F SEE SPEC 1

1. SEE SPECIFICATIONS 08 71 00 FOR DOOR HARDWARE REQUIREMENTS. COORDINATE WITH ELECTRICAL.

3" = 1'-0" B4

HOLLOW METAL HEAD DETAIL

3" = 1'-0" C4

HOLLOW METAL JAMB DETAIL

1/4" = 1'-0" D4

DOOR AND FRAME TYPES ELEVATIONS

1/4" = 1'-0" B6

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - RM 110 - NEW

1/4" = 1'-0" D6

ARCHITECTURAL REFLECTED CEILING PLAN -

FIRST LEVEL - RM 110 - DEMO

NOT TO SCALE

F5

EXISTING CONDITIONS 110

Number Revisions: Date:

1 Addendum 1 02/25/2026

(TYPE J) NON-RATED PARTITION

MARK STUD WIDTH PRTN WIDTH DESIGN STC

J2 2 1/2" 3 1/8" -

SHEET SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED

NEW CONSTRUCTION, WITH PARTITION TYPE

GENERAL INTERIOR NOTES

KEYNOTES

GENERAL FINISH NOTES:

1. REFER TO SPECIFICATIONS FOR ADDITIONAL MATERIAL AND

INSTALLATION REQUIREMENTS.

2. REFER TO THIS SHEET FOR FINISH LEGEND AND ROOM FINISH

SCHEDULE.

3. IF POSSIBLE PROVIDE MATERIALS FROM SAME PRODUCTION RUN

FOR CONSISTENCY.

SUBSTITUTION NOTES:

1. COLOR IS AN IMPORTANT PART OF THIS PROJECT. ANY COLOR

SUBSTITUTION WILL REQUIRE APPROVAL BY THE COR.

TRANSITION NOTES:

1. INSTALL TRANSITIONS AT ALL DISSIMILAR FLOOR MATERIALS.

2. FOR ALL FLOOR FINISH AND PATTERN TRANSITIONS THAT OCCUR AT

DOORWAYS, TRANSITION MATERIALS AT CENTERLINE OF DOOR

WHEN DOOR PANEL IS IN THE CLOSED POSITION.

SIGNAGE NOTES:

1. REFER TO THIS SHEET SERIES SHEETS FOR SIGNAGE INFORMATION,

REFER TO SPECIFICATIONS FOR ADDITIONAL SIGNAGE,

IDENTIFICATION AND SYSTEMS/EQUIPMENT LABELING

REQUIREMENTS.

PAINTING NOTES:

1. ALL ADHESIVES AND PAINT TO BE LOW VOC/ODOR.

2. UNLESS OTHERWISE INDICATED, DO NOT PAINT FACTORY-FINISHED

ITEMS OR INSTALLER FINISHED ITEMS.

3. COORDINATE APPLICATIONS OF PAINTS AND ADHESIVES WITH COR.

PROVIDE SEALED ENVIRONMENT DURING HVAC FLUSH OUT PERIOD

TO ENSURE ODORS DO NOT TRANSMIT TO ADJACENT SPACES.

CODE NOTES:

1. ALL INTERIOR FINISHES SHALL HAVE FLAME SPREAD IN COMPLIANCE

WITH IBC 2024 803.13 INTERIOR WALL AND CEILING FINISH

REQUIREMENTS BY OCCUPANCY

INSTALLATION NOTES:

1. PROVIDE BACKING FOR ALL WALL MOUNTED EQUIPMENT.

MATERIAL FLOOR CHANGE (REFER TO THIS SHEET FOR DETAILS)

INTERIOR FINISH SYMBOLS

SEALED CONCRETE WITH STATIC DISSIPATIVE COATING (C-1/SDC)

INTERIOR FINISHES

PAINT

FIELD

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

MANCHESTER TAN HC-81

ARCHITECT/ENGINEERS:

INTERIOR FINISHES

Drawing Title

Approved: Project Director

Project Title

Location

Date Checked Drawn

NB KLM

Project Number

Board Number

Office of Construction and Facilities Management

*BASIS OF DESIGN

**MATCH EXISTING CAMPUS PAINT COLORS

EHRM INFRASTRUCTURE

UPGRADES

518-22-700

200 Springs Road, Bedford, MA 01730

EDITH NOURSE MEMORIAL VETERANS HOSPITAL

P-1

DIGITAL IMAGES MAY HAVE COLOR INACCURACIES, REFER

TO ACTUAL SAMPLE FOR TRUEST COLOR DEPICTION

PAINT

METAL DOORS & TRIM

CALIFORNIA PAINTS*

TO MATCH BENJAMIN MOORE

WHITE DOWN OC-131

P-2

WALL BASE

JOHNSONITE*

BEIGE 49

RB-1

PAPER INSERT CARRIER, MAGNETIC

MOUNT, WITH NON-GLARE LENS

TEXT: 5/8"H LASER-PRINTED TEXT,

HELVETICA MEDIUM

COLOR: TO MATCH STATION

STANDARDS

1-1/2" x 1/32" ADA

TACTILE NUMERALS

AND GRADE II BRAILLE234

9"

Restricted Access

5-3/16" X 9" CLEAR

ACETATE INSERT W/

COPY

9"X9" MAGNETICALLY

REMOVABLE SIGN

(ONE-PIECE)

RED SYMBOL AND

BLACK TEXT

1/2" 9" 1/2"

/2

/2

QUARTER-ROUND

SILVER FRAME

EXISTING FLOORING

TO BE REMOVED

TOP OF SLAB

EXISTING

FLOORING TO

REMAIN, EXISTING

ROOM SIDE EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE (C-1/SDC)

RESILIENT BASE AS

SCHEDULED, EACH

SIDE OF NEW WALL

INSTALL 3/4"

PLYWOOD, MOUNT

BOTTOM OF

PLYWOOD 12" AFF

ADJACENT SPACE

TELECOM

ROOM SIDE

PARTITION AS SCHEDULED

EXISTING CONCRETE

FLOOR WITH STATIC

DISSIPATIVE

(C-1/SDC)

LOCATION OF FLOOR

FINISH CHANGE;

SEAM OR ADAPTER

TRANSITION SHALL

OCCUR AT

CENTERLINE OF

DOOR IN CLOSED

POSITION

DOOR AS SCHEDULED

EXISTING FLOORING

TOP OF SLAB

CORRIDOR SIDE

DOOR FRAME BEYOND

C CENTER LINE OF DOORL

TRANSITION STRIP

(TR-1) OR EQUAL,

REFER TO SCHEDULE

FOR INFORMATION

TELECOM ROOM SIDE

SIGNAGE REFERENCES

VA SIGNAGE DESIGN MANUAL

SIGN VENDOR TO REFERENCE VA SIGNAGE DESIGN MANUAL FOR COMPLETE

SPECIFICATIONS

https://www.cfm.va.gov/til/spclRqmts.asp#SIGN

SIGN SYMBOL LEGEND

IN-08.02

IN-01.31

1 2 5 6

TELECOM ROOM FINISH DIAGRAM,

CONTRACTOR TO REFERENCE

ARCHITECTURE FOR ACTUAL WALL

CONSTRUCTION LOCATIONS

F1

18IN101

TYP.

F4

18IN101

TYP.

IN-04.01A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

(860)270-0753

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd

.M A

.R

/5

-2 -7

.B e d fo rd .E

H R

M .A

R C

H .B

R

.r v t

/2

/2

:5

:1

A

M

18IN101

INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES 518-22-700

06/04/2025 M. Perkins K. McDermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

NTS

C1

COLOR BOARD

3" = 1'-0" D3

IN-04.03D SIGN DETAIL - PRIMARY ROOM

IDENTIFICATION

3" = 1'-0"

D1

IN-08.02 SIGN DETAIL - PROHIBIT

INSTRUCTIONAL AND CONTROL

NTS

C4

EXAMPLE OF EXISTING SIGNAGE

6" = 1'-0" F4

RESILIENT BASE (TOE BASE)

6" = 1'-0"

F1

THRESHOLD - CONCRETE TO EXISTING FLOORING

1 REMOVE EXISTING FLOORING, ADHESIVES, AND INSTALL NEW WALL

BASE

2 EXISTING WALLS ARE TO BE PATCHED AND PAINTED. SEE ROOM

FINISH SCHEDULE THIS SHEET FOR FINISHES.

3 ALL WALLS TO RECEIVE NEW PLYWOOD, COORDINATE WITH

ELECTRICAL DRAWINGS FOR FIXTURE LOCATIONS

4 PROVIDE NEW ROOM SIGNAGE, SEE SIGNAGE SCHEDULE THIS

SHEET

5 REFER TO ARCHITECTURAL PLANS FOR DETAILED ROOM

CONFIGURATION INFORMATION

6 TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE

SEALER

REFER TO THIS SHEET FOR ROOM FINISH SCHEDULE & FINISH LEGEND

3" = 1'-0" D5

IN-01.31 SIGN DETAIL - FIRE EQUIPMENT

IDENTIFICATION SIGN

ROOM FINISH SCHEDULE

LEVEL NO. NAME

FLOOR WALLS CEILING

NOTESFINISH BASE

NORTH EAST SOUTH WEST

MATERIAL FINISHMATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH

LEVEL 1 110 TELECOM ROOM C-1/ SDC RB-1 GWB P-1/WD GWB P-1/WD GWB P-1/WD GWB P-1/WD GWB

BUILDING SIGNAGE SCHEDULE

VERSIO

N TYPE COUNT DESCRIPTION DETAIL LOCATION REFERENCE

ADA

BRAILLE TEXT COLOR BACKGROUND COLOR

DIMENSIONS

CommentsSIGN_HEIGHT SIGN_WIDTH MOUNTING HEIGHT

IN-01.31 1 FIRE IDENTIFICATION SIGN D5 / IN101 FEC REFER TO PAGE 429 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO WHITE RED 9" 9" 6' - 8" INSTALLED AT FIRE EXTINGUISHER CABINETS AT ALL

NEW TELECOM ROOMS

IN-04.01A 1 ROOM NUMBER IDENTIFICATION D3 / IN101 TELECOM ROOM REFER TO PAGE 261 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 0" INSTALLED AT ALL NEW TELECOM ROOMS MOUNTED

DIRECTLY ABOVE ROOM NAME SIGN

IN-08.02 1 PROHIBIT INSTRUCTIONAL AND

CONTROL

D1 / IN101 TELECOM ROOM REFER TO PAGE 279 OF SIGNAGE DESIGN

MANUAL DATED 05/2023

NO REFERENCE EXISTING

CAMPUS STANDARDS

REFERENCE EXISTING

CAMPUS STANDARDS

9" 9" 5' - 9" INSTALLED AT ALL NEW TELECOM ROOMS MOUNTED

DIRECTLY ABOVE ROOM NAME SIGN

Grand total: 3

FINISH LEGEND

SYMBOL FINISH TYPE MANUFACTURER COLLECTION STYLE / TYPE COLOR SIZE SPEC SECTION NOTES

C-1/ SDC SEALED CONCRETE WITH STATIC DISSIPATIVE COATING SEALED CONCRETE* - - - - - TELECOM ROOM SPACE TO RECEIVE STATIC CONTROL CONCRETE SEALER

F-1 FILM 3M* FASARA 7725SE-324 FROSTED CRYSTAL - 08 87 33 WINDOW FILM

P-1 PAINT CALIFIRNIA PAINTS* - EGGSHELL TO MATCH BENJAMIN MOORE MANCHESTER TAN HC-81 - 09 91 00 FIELD

P-2 PAINT CALIFORNIA PAINTS* - SEMI-GLOSS TO MATCH BENJAMIN MOORE WHITE DOWN OC-131 - 09 91 00 METAL DOORS & TRIM

RB-1 RESILIENT BASE JOHNSONITE* TRADITIONAL TOE BASE BEIGE 49 4" 09 65 13

TR-1 TRIM SCHLUTER * - RENO-U SATIN ANODIZED ALUMINUM - 09 30 13 FLOOR TRANSITION

WD PLYWOOD FIRE TREATED PLYWOOD* - - HIGH GLOSS WHITE MPI (MASTER PAINTERS INSTITUTE) 67

OR SIM

4' X 8' - PLYWOOD TO BE PAINTED WITH 2 COATS OF FIRE RESISTANT PAINT; FIRE

RATING STAMPS SHALL NOT BE PAINTED OVER

*Materials are approved as basis of design, all material substitutions are subject to owner approval. Contractor to provide VA Interior Design Department with samples of all specified finish materials. VA COR/ Interior Design department shall approve all finishes prior to installation.

1/2" = 1'-0" F7

TYPICAL TELECOM ROOM FINISH DIAGRAM

Number Revisions: Date:

1 Addendum 1 02/25/2026

DN DN

DN

DN

UP

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

OFFICE

LAB

OFFICE

TOILET

OFFICE

HAC

Room

CONFERENCE RM

OFFICE

TELECOM ROOM

TOILET

OFFICE

Room

OFFICE

LAB

OFFICE

CLOSET

113A

OFFICE

CLOSET

113B

CORRIDOR

CORRIDOR

STAIR

HAC

121B

STAIR

111B

EXISTING TE

111B

UTILITY CLOSET

121A

CLOSET

108A

CORRIDOR

CLOSET

107A

CLOSET

105B

CLOSET

105A

CLOSET

103B

CLOSET

103A

CLOSET

101B

CLOSET

101A

CLOSET

112B

CLOSET

112A

CLOSET

114B

CLOSET

114A

CLOSET

116B

CLOSET

116A

CLOSET

118B

CLOSET

118A

18FX101

C7

18FX101

C4

CORRIDOR

STAIR

STAIR

STAIR

OFFICE

CLOSET

112B

TELECOM ROOM

168 SF

5' - 5"

2 8

2 7

STORAGE

151 SF

CORRIDOR

OFFICE

CLOSET

CLOSET

CLOSET

STAIR

STAIR

STAIR

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753

STAMP

mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd .M

A .R

/5

-2

-7

.B e d fo rd

.E H

R M

.M E

P .B

R

.r v t

/2

/2

:5

:3

A

M

18FX101

FIRE PROTECTION PLAN - FIRST LEVEL 518-22-700

06/04/2025 M. Perkins N.Harper

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

SCALE: 1/8" = 1'-0"

F4

FIRE PROTECTION PLAN - FIRST

LEVEL

SPRINKLER HEAD LEGEND

SYM.

DEMO

TYPE

QUICK

RESPONSE

TEMP "K"

DEMO

QUANTITY

PENDENT

YES 170F 5.6UPRIGHT

YES 155F 5.6

NOTE: LEGEND INFORMATION IS SPECIFIC TO THIS SHEET ONLY

NEW

QUANTITY

SYM.

NEW

+1

SCALE: 1/2" = 1'-0"

C7

FIRE PROTECTION ENLARGED PLAN

FIRST LEVEL - 111A NEW

SCALE: 1/2" = 1'-0"

C4

FIRE PROTECTION ENLARGED PLAN

FIRST LEVEL - 110 DEMO

CONTRACTOR SHALL PROVIDE THE FOLLOWING PRIOR TO

COMMENCEMENT OF WORK FOR REVIEW AND APPROVAL:

A. SHOP DRAWING IDENTIFYING MAIN PIPE SIZES AND LOCATIONS,

LOCATION OF PIPE BRACING, HANGERS AND SPRINKLER HEADS

AND DETAILS

B. CUT SHEETS AND SUBMITTAL FOR ALL PIPING, FITTINGS,

SPRINKLER HEADS, HANGERS AND SUPPORT ATTACHMENTS

A. EXISTING CONDITIONS ARE BASED ON EXISTING PLANS AND FIELD VERIFICATION

WHERE FEASIBLE. ACTUAL CONDITIONS MAY DIFFER FROM THOSE INDICATED.

CONTRACTOR SHALL FIELD VERIFY IN ADVANCE THE LOCATION AND CONDITION

OF THE EXISTING SYSTEMS SHOWN TO BE MODIFIED OR REMOVED. CONTRACTOR

TO NOTIFY ARCHITECT SHOULD CONDITIONS BE FOUND TO DIFFER SIGNIFICANTLY

FROM THE CONSTRUCTION DOCUMENTS.

B. A DETAILED SCHEDULE, INCLUDING PROJECTED SERVICE INTERRUPTION DATES

WITH DURATIONS, AND DETAILED PHASING PLAN IS TO BE PROVIDED TO THE COR

PRIOR TO THE START OF WORK. THIS SUBMITTAL MUST BE ACCEPTED BY THE

COR PRIOR TO THE START OF WORK.

C. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT DIMENSIONAL DATA, CEILING

HEIGHTS, AND SQUARE FOOTAGE.

D. CONTRACTOR SHALL COORDINATE ALL WORK WITH BUILDING OWNER AND

OTHER TRADES PRIOR TO CONSTRUCTION.

E. ALL PIPING TO BE ROUTED WITHIN CEILING SPACE OR CONCEALED IN FURRED

CHASES UNLESS NOTED OTHERWISE.

F. ALL AREAS ARE DESIGNED AS ORDINARY HAZARD GROUP 1 OCCUPANCY UNLESS

NOTED OTHERWISE ON PLAN.

G. ALL SPRINKLER SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH THE 2025

NFPA 13.

H. ALL MATERIALS, DEVICES, HANGERS AND SUPPORTS SHALL BE NEW AND UL

LISTED FOR USE IN FIRE PROTECTION SYSTEMS.

I. ALL NEW SPRINKLERS SHALL BE PROVIDED WITH NEW ESCUTCHEONS TO MATCH

EXISTING BUILDING STANDARDS.

J. INSTALL QUICK RESPONSE SPRINKLERS (QRS) IN ALL AREAS, EXCEPT WHERE

SPECIFICALLY PROHIBITED AS DEFINED BY 2025 NFPA 13.

K. PIPING TO BE SCHEDULE 40 BLACK STEEL WITH CAST IRON FITTINGS.

L. ANY FLOOR, WALL, OR CEILING CUTTING OR FILLING THAT IS REQUIRED TO

COMPLETE THIS PROJECT, THE CONTRACTOR SHALL PATCH AND PAINT AND

RETURN TO MATCH EXISTING CONDITIONS AND FINISHES.

M. CONTRACTOR TO PROVIDE GALVANIC PROTECTION AS REQUIRED AT

CONNECTIONS BETWEEN ALL DISSIMILAR METALS.

N. CONTRACTOR TO VALIDATE AND VERIFY ALL FIRE RATED AND/OR SMOKE RATED

WALLS AND ASSEMBLIES INDICATED ON PLANS IN WORK AREA. PROVIDE ALL

PIPING PENETRATIONS OF FIRE, SMOKE AND FULL HEIGHT WALLS SHALL BE

CAULKED AIRTIGHT TO THE ADJACENT STRUCTURE BY MEANS OF U.L. APPROVED

FIREPROOF CAULKING MATERIAL.

O. ALL NEW PIPES TO BE CLEANED AND TESTED PRIOR TO COMMISSIONING.

P. THE SPRINKLER CONTRACTOR SHALL COORDINATE AND PERFORM ALL FIRE

PROTECTION WORK IN ACCORDANCE WITH VA REQUIREMENTS TO ENSURE THAT

CONTINUOUS SPRINKLER COVERAGE IS PROVIDED THROUGHOUT THE PROJECT.

THE SPRINKLER CONTRACTOR SHALL COORDINATE ALL FIRE PROTECTION

SYSTEM SHUTDOWNS, INCLUDING POINTS OF TIE IN, ETC. WITH THE VA PRIOR TO

PERFORMING WORK.

Q. CONTRACTOR SHALL REPLACE EXISTING SPRINKLERS WITH NEW UPRIGHT

SPRINKLERS AT THE TIME OF CEILING REMOVAL TO MAINTAIN SPRINKLER

PROTECTION WITHIN THE CONSTRUCTION AREA.

R. CONTRACTOR SHALL REPAIR ANY DAMAGE TO THE EXISTING IRRIGATION SYSTEM.

S. ALL NEWLY EXPOSED SPRINKLER PIPING TO BE PAINTED.

1. EXISTING SPRINKLER HEAD IN THIS LOCATION TO REMAIN, PROTECT IN PLACE.

2. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING COMPLIANCE WITH THE 2025

NFPA 13 FOR SURROUNDING SPACING DURING AND AFTER RENOVATION.

CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING SPRINKLER HEAD

LOCATIONS AND PIPING TO BE MODIFIED BY THE RENOVATION PRIOR TO

COMMENCING WORK.

3. EXISTING PENDENT SPRINKLER HEAD IN THIS LOCATION TO BE REMOVED AND

REPLACED WITH NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD

CAGE. INSTALL SPRINKLER HEAD AND HANGERS IN ACCORDANCE WITH THE

2025 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.

4. EXISTING UPRIGHT SPRINKLER HEAD IN THIS LOCATION TO BE REMOVED AND

REPLACED WITH NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD

CAGE. INSTALL SPRINKLER HEAD AND HANGERS IN ACCORDANCE WITH THE

2025 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL INFORMATION.

5. NEW UPRIGHT SPRINKLER HEAD WITH PROTECTIVE HEAD CAGE. CONNECT

PIPING TO NEAREST BRANCH LINE. INSTALL SPRINKLER HEAD AND HANGERS IN

ACCORDANCE WITH THE 2025 NFPA 13. SEE SHEET FX001 FOR ADDITIONAL

INFORMATION.

6. NEW HEAT/SMOKE DETECTOR AND FIRE ALARM STROBE/HORN, MOUNT AND

SUPPORT FROM DECK ABOVE. COORDINATE LOCATION WITH ALL OTHER

TRADES, EXISTING CONDITIONS, AND COR. SEE ARCHITECTURAL PLANS FOR

ADDITIONAL INFORMATION.

7. CONTRACTOR TO V.I.F. IF THERE ARE ADDITIONAL SPRINKLER HEADS WITHIN

THE NEW TR SPACE. IF AN ADDITIONAL HEAD IS FOUND, USE EXISTING

LOCATION AND REPLACE WITH A NEW UPRIGHT SPRINKLER HEAD IF THE

DIMENSIONS COMPLY WITH NFPA 13.

8. TR SPACES ARE DESIGNATED AS LIGHT HAZARD .

9. REMOVE EXISTING SIDEWALL FIRE SPRINKLER.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

REFER TO COVER SHEET FOR KNOWN ACM ITEMS

WITHIN THIS BUILDING.

Revisions: Date:

Addendum 1 02/25/2026

Ariah

Ariah

UP

UP

DN DN

DN

DN

UP

WAP

CTRK

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

DN

WAP

CTRK

WAP

WAP

WAP

WAP

CTRK

WAP

WAP

CTRK

WAP

WAP

WAP

WALL SYMBOL LEGEND

EXISTING CONSTRUCTION TO REMAIN

SMOKE AND 1-HR RATED FIRE

BARRIER AND OPENINGS

SMOKE AND 2-HR RATED FIRE BARRIER

AND OPENINGS

SMOKE BARRIER AND OPENINGS

1 HR RATED FIRE BARRIER AND

OPENINGS

2 HR RATED FIRE BARRIER AND OPENINGS

CONTRACTOR SHALL CONFIRM ALL FIRE RATED WALL ASSEMBLIES

ROOM

B01

ROOM

B02

ROOM

B03

ROOM

B04

CORRIDOR

B05

ROOM

B06

ROOM

B07

ROOM

B08

STAIR

B09

CORRIDOR

B10

CORRIDOR

B11

STAIR

CRAWL SPACE

CS-1

CRAWL SPACE

CS-2

ROOM

NO DATA

NO DATA

NO DATA

NO DATA

NO DATA

NO DATA NO DATA

NO DATA NO DATA

NO DATA

FIBER PATH A

FIBER PATH B

TYP.

NO DATA

OFFICE

LAB

OFFICE

TOILET

OFFICE

HAC

Room

CONFERENCE RM

OFFICE

TELECOM ROOM

TOILET

OFFICE

Room

OFFICE

LAB

OFFICE

CLOSET

113A

OFFICE

CLOSET

113B

CORRIDOR

CORRIDOR

STAIR

HAC

121B

STAIR

111B

EXISTING TE

111B

UTILITY CLOSET

121A

CLOSET

108A

CORRIDOR

CLOSET

107A

CLOSET

105B

CLOSET

105A

CLOSET

103B

CLOSET

103A

CLOSET

101B

CLOSET

101A

CLOSET

112B

CLOSET

112A

CLOSET

114B

CLOSET

114A

CLOSET

116B

CLOSET

116A

CLOSET

118B

CLOSET

118A

18T-401

F7

118-A 118-B

118-C 116-A

116-B

NO DATA NO DATA

114-AP-A

114-A

114-B

NO DATA

112-B 112-A

122-AP-A

122-A

NO DATA NO DATA

101-A

101-B

101-AP-A

NO DATA

103-B 103-A

105-B 105-A

107-B

107-A

109-A

123-AP-A

123-A

NO DATA

108-A

NO DATA

NO DATANO DATA

NO DATA

NO DATA

113-A

113-AP-A

115-A

115-B

120-AP-A

TYP.

TYP.

TYP.

TYP.

TYP.

110-D

110-A

110-B

110-C

18T-401

C7

EXT-A

EXT-B

114-CK-A

111A-CAM-01

118-AP-A

121-AP-A

101-AP-B

102-AP-A

107-AP-A

108-B

TYP.

NO DATA

LAB

OFFICE

LAB

LAB

LAB

OFFICE

LAB

DARK ROOM

FREEZER

OFFICE

CLOSET

LAB

LAB

LAB

OFFICE

Room

OFFICE

OFFICE

CORRIDOR

STAIR

OFFICE

HAC

Room

218A

ROOF BELOW

ROOF BELOW

220-B 220-A

220-AP-A

218A-A

218-A

NO DATA

216-A

216-B

212-A

212-AP-A

222-A

201-A 203-A

203-B

205-A

207-A

207-B 209-AP-A

209-A

208-AP-A

206-D

206-A206-B

206-C

221-AP-A

202-A

202-B

202-C

202-D

200-AP-A

200-A

NO DATA

NO DATA

221-A221-AP-A

217-A

219-A

219-AP-A

215-A

TYP.

TYP.

217-CR-A

18T-401

C5

218A-CK-A

202-CK-A

TYP.

215-AP-A

201-AP-A

207-C

TYP.

CAT6a RISER TO

NEW TR

TELECOM ROOM

168 SF

262' - 0"

FIBER PATH A

FIBER PATH B

CABLE LEGEND

(10) NEW CAT 6A

TN

PN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

CONSULTANT

321 4 5 6 7 8 9 10

GENERAL NOTES

KEYNOTES

TRIPLE C - The A/E Group

100 Pearl Street, 14th Floor

Hartford, CT 06103

MAT PERKINS

860-270-0753

STAMP

mat.perkins@triplecaeg.com

A u to d e s k D o c s /3

C

R

.P ro je c t.

-2

-7

.E H

R M

.I U

.B e d fo rd .M

A .R

/5

-2

-7

.B e d fo rd

.E H

R M

.M E

P .B

R

.r v t

/2

/2

:0

:1

P

M

18T-100

TELECOMMUNICATION PLAN - BASEMENT, FIRST

AND SECOND LEVEL

518-22-700

06/04/2025 M. Perkins K.Mcdermott

ISSUED FOR

CONSTRUCTION

EHRM INFRASTRUCTURE

UPGRADES

200 Springs Rd, Bedford, MA 01730

SCALE: 1/8" = 1'-0"

F4

TELECOMMUNICATION PLAN -

BASEMENT LEVEL

SCALE: 1/8" = 1'-0"

E4

TELECOMMUNICATION PLAN - FIRST

LEVEL

SCALE: 1/8" = 1'-0"

C4

TELECOMMUNICATION PLAN -

SECOND LEVEL

0 DATA PORTS FOR THIS AREA

5,932 GSF

48 DATA PORTS FOR THIS AREA

6,018 GSF

41 DATA PORTS FOR THIS AREA

5,851 GSF

SERVED FROM LEVEL 1

SERVED FROM LEVEL 1

SCALE: 1" = 100'-0"

F1

DIAMOND ANALYSIS - BUILDING 18

A. PROPERLY FIRE STOP AND SEAL ALL PENETRATIONS THROUGH WALLS,

FLOORS, CEILINGS, AND ROOF AS PER OWNER, CODE, AND AHJ.

B. PRIOR TO INSTALLATION OF CABLE TRAY COORDINATE LOCATIONS WITH ALL

OTHER TRADES AND PROVIDE COORDINATION DRAWINGS FOR REVIEW. ALL

NEW CABLE, CABLE TRAY, J HOOKS SHALL BE INDEPENDENTLY SUPPORTED &

NOT CAUSE ADDITIONAL LOAD ON OTHER SYSTEMS.

C. NOT ALL PARTS AND PIECES ARE SHOWN FOR A COMPLETE SYSTEM.

CONTRACTOR IS RESPONSIBLE FOR PROVIDING A COMPLETE END-TO-END

WARRANTEED SOLUTION FOR THE CABLING.

D. ALL CABLING TO BE PLENUM RATED THROUGHOUT THE BUILDING.

E. ALL COMMUNICATIONS AND WIRELESS ACCESS POINT CABLING TO MEET OR

EXCEED CATEGORY 6A STANDARDS.

F. SEE E-501 FOR DEVICE STANDARD MOUNTING HEIGHTS.

G. ALL CONDUITS FOR TELECOMMUNICATIONS OUTLETS SHALL BE STEEL THIN

WALL ELECTRICAL METALLIC TUBING (TYPE EMT) UNLESS OTHERWISE NOTED.

UNDER NO CIRCUMSTANCES SHALL FLEXIBLE CONDUIT BE USED FOR

PATHWAYS INDICATED ON THIS DRAWING. ALL CONDUITS ARE TO BE, AT A

MINIMUM, 1-1/4" TRADE SIZE, UNLESS OTHERWISE NOTED. ALL CONDUITS FOR

TELECOMMUNICATIONS OUTLETS ARE TO BE STUBBED TO NEAREST CABLE

TRAY. CONTRACTOR IS TO ENSURE THAT NO CONDUIT EXCEEDS 40% FILL. IF

EXISTING CONDUIT IS NOT LARGE ENOUGH TO SUPPORT NEW CAT 6A CABLE

TO REPLACE ALL EXISTING CIRCUITS ONE-FOR-ONE, CONTRACTOR SHALL

PROVIDE THE MAXIMUM ALLOWABLE NEW CAT 6A CIRCUITS TO REPLACE

EXISTING. THE ADDITIONAL NEW CIRCUITS TO COMPLETE THE ONE-FOR-ONE

REPLACEMENT SHALL BE PROVIDED AT THE NEAREST AVAILABLE DROP WITH

EXISTING CONDUIT CAPACITY.

H. ALL CONDUIT PATHWAYS SHALL BE PROVIDED WITH NYLON BUSHINGS TO

PROTECT CABLES, REGARDLESS OF WHETHER THEY TERMINATE IN A DEVICE

OR JUNCTION BOX.

I. TERMINATE, TEST, LABEL AND DOCUMENT ALL TELECOMMUNICATION CABLES.

J. CONTRACTOR SHALL AVOID ALL SYSTEMS SHUTDOWNS, INSTALL NEW

EQUIPMENT PRIOR TO THE RENOVATION OF EXISTING EQUIPMENT; PROVIDE

TEMPORARY UTILITIES AS REQUIRED TO MEET THIS REQUIREMENT.

K. THE DEMOLITION OF DEVICES SHALL INCLUDE ALL ASSOCIATED CABLING

BACK TO THE RACK.

L. LABEL DEVICE PLATES WITH A PERMANENT ADHESIVE LABEL FOLLOWING ALL

STANDARDS AND REQUIREMENTS, SEE DETAIL SHEETS FOR ADDITIONAL

INFORMATION

M. CONTRACTOR SHALL PROVIDE TWO SETS OF LAMINATED FINAL

TELECOMMUNICATION ONE-LINE, RACK ELEVATION, AND CABLE SCHEDULE

DOCUMENTS. HANG ON THE WALL WITHIN THE TELECOM ROOM.

N. REFER TO R-900 SERIES SHEETS FOR PHOTO DOCUMENTATION OF EXISTING

CONDITIONS.

O. FOR EXISTING SECURITY CAMERAS BEING RE-CABLED, MAINTAIN EXISTING

CAMERA ANGLE AND PROTECT IN PLACE.

P. ALL EXISTING PENETRATIONS NO LONGER BEING USED WILL BE FILLED WITH

RATED ASSEMBLY.

Q. ABOVE CEILING SURVEY TO OCCUR FOR CABLE TRAY INSTALLATION. EXISTING

EQUIPMENT AND/ OR SYSTEMS TO BE SELECTED AS REQUIRED. ALL ACTIVE

SYSTEMS TO REMAIN OPERATIONAL.

1. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH

EXISTING EMT STUB UP TO NEAREST ACCESSIBLE CEILING SPACE. SEE DETAILS

ON SHEET T-501 FOR ADDITIONAL INFORMATION.

2. ALL EXISTING WAP'S TO REMAIN/PROTECT IN PLACE, AND NO NEW CABLING

REQUIRED FOR EXISTING WAP'S (WIRELESS ACCESS POINTS).

3. PROVIDE NEW 4-POST CHANNEL, PDU, UPS AND WIRE MANAGEMENT

COMPONENTS AS SHOWN ON T-500 SERIES AND T-600 SERIES SHEETS AND IN

THE SPECIFICATIONS.

4. PROVIDE NEW VERTICAL WIRE MANAGEMENT SYSTEM, SEE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

5. EXISTING CABLING CONDUIT AND WIREWAYS ARE TO REMAIN AND BE CAREFULLY

PROTECTED IN PLACE. ALL EXISTING DEVICES ON THE EXISTING RACK SHALL BE

TRANSFERRED TO THE NEW RACK. CONTRACTOR SHALL PROVIDE SHOP

DRAWINGS SHOWING THE PROPOSED NEW RACK ELEVATION AND PROVIDE A

PHASING PLAN FOR TRANSFERRING ALL EXISTING DEVICES TO REMAIN TO THE

NEW RACKS.

6. PROVIDE NEW CABLE TRAY PER REQUIREMENTS LISTED IN CABLE TRAY

SCHEDULE. COORDINATE WITH EXISTING CONDITIONS AND SUBMIT

COORDINATION DRAWINGS FOR REVIEW PRIOR TO COMMENCING WORK. SEE

T-500 SERIES SHEETS FOR ADDITIONAL REQUIREMENTS. COORDINATE LIGHT

FIXTURES WITH OVERHEAD CABLE TRAY AND SPEED SLEEVE FILL SHALL NOT

EXCEED 40%.

7. PROVIDE NEW IP ADDRESSABLE NETWORK CAMERA, POE+, PTZ, MOTION

SENSOR, AUTO-TRACKING, DOME WITH WALL MOUNT. MOUNT AT 8’ – 6” A.F.F. TO

TOP OF WALL BRACKET. INTEGRATE CAMERA INTO EXISTING VMS.

8. PROVIDE NEW DATA OUTLET, STUB-UP, AND BACK-BOX IN NEW LOCATION IN TR.

9. NEW 4” SPEED CONDUIT SLEEVE THROUGH WALL ABOVE CEILING GRID FOR

HORIZONTAL VOICE/DATA CABLING OR FIBER WITH PLASTIC BUSHINGS ON BOTH

ENDS TO PROTECT CABLES,CABLE TRAY AND SPEED SLEEVE FILL SHALL NOT

EXCEED 40%. FIRE CAULK PENETRATION PER SPECIFICATIONS.

10. EXISTING CONDUIT THROUGH WALL OR FLOOR WITH OPTICAL CABLE TO BE

PROTECTED IN PLACE UNTIL NEW SPEED CONDUIT SLEEVE AND FIBER IS

INSTALLED. DEMOLISH EXISTING CONDUIT ONCE NEW SPEED CONDUIT SLEEVE

AND FIBER ARE OPERATIONAL. CONTRACTOR SHALL PROVIDE A PHASING PLAN

FOR TRANSFERRING FIBER.

11. EXISTING EQUIPMENT TO REMAIN, PROTECT-IN-PLACE.

12. DEMOLISH EXISTING FIBER ONCE NEW FIBER IS OPERATIONAL. CONTRACTOR

SHALL PROVIDE A PHASING PLAN FOR TRANSFERRING FIBER.

13. ALL EXISTING ANALOG PHONE CABLE DEVICES AND TERMINATIONS ETC. SHALL

REMAIN OPERATIONAL AT ALL TIMES AND SHALL BE RETAINED AND REUSED.

PROTECT IN PLACE.

14. VERTICAL ROUTE WITH REDUNDANT SPARE CONDUIT FOR TELECOM RISER. SEAL

ALL FLOOR PENETRATIONS TO MAINTAIN FIRE RATING.

15. HORIZONTAL CABLE LENGTH LIMITATIONS PER STANDARD 3.1.

16. EXISTING PACS AND EQUIPMENT RACKS.

17. NEW INDOOR UNIT.

18. CONTRACTOR SHALL FIELD VERIFY EXISTING TELECOMMUNICATIONS EQUIPMENT

TO BE DEMOLISHED PRIOR TO COMMENCING WORK.

19. VERTICAL LADDER RACK.

20. EXISTING CAMERA TO BE RETAINED.

21. PROVIDE NEW TELECOMMUNICATIONS OUTLET IN EXISTING LOCATION WITH

SURFACE MOUNT CONDUIT/WIREMOULD UP TO NEAREST ACCESSIBLE CEILING

SPACE.

22. PROVIDE SPACE FOR FUTURE 4-POST RACK.

23. PROVIDE 10 NEW CAT 6A CABLES FROM EXISTING TR TO NEW TR LOCATION FOR

CROSS CONNECTION, EXISTING LOW VOLTAGE SYSTEMS.

NOTE: NOT ALL KEYNOTES

ARE USED ON EACH SHEET

REFER TO COVER SHEET FOR KNOWN ACM ITEMS

WITHIN THIS BUILDING.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS

WITHIN THIS BUILDING.

REFER TO COVER SHEET FOR KNOWN ACM ITEMS

WITHIN THIS BUILDING.

Revisions: Date:

Addendum 1 02/25/2026

Ariah

Sheets
18H-101 - HAZARDOUS MATERIAL ABATEMENT PLAN -FIRST LEVEL
18A-401 - ARCHITECTURAL ENLARGED VIEWS -FIRST LEVEL
18IN101 - INTERIOR FINISH PLAN, SIGNAGE & SCHEDULES
18FX101 - FIRE PROTECTION PLAN - FIRST LEVEL
18T-100 - TELECOMMUNICATION PLAN -BASEMENT, FIRST AND SECOND LEVEL

File details come from the government source that posted it. Updated .