S06 Att Amend 0002 MD101 - MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR.pdf

PDF 381 KB Posted

Attached to
Z2DA--Project # 695-19-131 Renovate and Expand Dialysis Clinic Clement J. Zablocki VA Medical Center Milwaukee, WI
Solicitation number
36C25220B0021
Issued by

About this file

This document contains a federal contract opportunity notice and related mechanical demolition floor plan for renovating and expanding a dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contract opportunity involves demolishing an existing vacant ward and reconstructing the space to become the new home for the hospital's dialysis clinic, relocating it from the fifth floor. The construction work includes demolition, concrete, electrical, plumbing, technical, mechanical, patient ceiling lifts, pneumatic tube, and architectural trades. Specialty furnishings to support dialysis operations are also required. The project area is bounded by vacant and occupied spaces. The total renovated space is approximately 11,000 square feet. Hazardous materials abatement for asbestos is included. The project magnitude price range is between $2,000,000 to $5,000,000. The solicitation is scheduled to post on May 13, 2020 with a bid opening of June 16, 2020. A pre-bid conference will be held. The contract is set aside for Service Disabled Veteran Owned Small Businesses and awardees must be verified in the VIP database. The period of performance is 540 calendar days from notice to proceed.

View the file

Other files

File Type Posted
Amend 0005 00 01 10 TABLE OF CONTENTS.pdf PDF
Amend 0005 22 67 19.16 REVERSE-OSMOSIS WATER EQUIPMENT.pdf PDF
Amend 0005 08 71 13.11 LOW ENERGY DOOR OPERATORS.pdf PDF
S06 36C25220B0021 0005.pdf PDF
Amend 0005 01 91 00 COMMISSIONING REQUIREMENTS.pdf PDF
Amend 0005 01 01 10 SN SPECIAL NOTES.pdf PDF
Amend 0005 11 73 00 CEILING MOUNT PATIENT LIFT.pdf PDF
Amend 0005 14 92 00 PNEUMATIC TUBE SYSTEM.pdf PDF
Amend 0003 Photos Revised.pdf PDF
S06 36C25220B0021 0004.pdf PDF
AI601 - FINISH SCHEDULES.pdf PDF
Wage Determination 6.19.20.pdf PDF
Amend 0003 Photos.pdf PDF
SECTION 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
36C25220B0021 0003.pdf PDF
S06 Att Amend 0002 00 01 10 - TABLE OF CONTENTS.pdf PDF
S06 Att Amend 0002 EP100 - BASEMENT FLOOR OVERALL PLAN.pdf PDF
S06 Att Amend 0002 AI201 - INTERIOR FINISHES ELEVATIONS.pdf PDF
S06 Att Amend 0002 AE601 - DOOR_WINDOW SCHEDULE.pdf PDF
S06 36C25220B0021 0002.pdf PDF
S06 Att Amend 0002 28 05 13 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY.pdf PDF
S06 Att Amend 0002 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
S06 Att Amend 0002 01 74 19 - CONSTRUCTION WASTE MANAGEMENT.pdf PDF
S06 Att Amend 0002 GC101 - INFECTION CONTROL_PHASING PLAN.pdf PDF
S06 Att Amend 0002 09 05 16 - FLOOR PREP1.pdf PDF
S06 Att Amend 0002 ET102 - SEVENTH FLOOR SYSTEMS PLAN - DIVISION 28.pdf PDF
S06 Att Amend 0002 AD101 - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 10 14 00 - SIGNAGE.pdf PDF
S06 Att Amend 0002 12 24 00 - WINDOW SHADES.pdf PDF
S06 Att Site Visit Sign In 5.28.20.pdf PDF
S06 Att Amend 0002 03 30 53 - CAST-IN-PLACE CONCRETE.pdf PDF
S06 Att Amend 0002 QH101 - SEVENTH FLOOR EQUIPMENT PLAN.pdf PDF
S06 Att Amend 0002 01 91 00 - COMMISSIONING REQUIREMENTS.pdf PDF
S06 Att Amend 0002 22 07 11 - PLUMBING INSULATION.pdf PDF
S06 Att Amend 0002 ET101D - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 22 11 00 - FACILITY WATER DISTRIBUTION.pdf PDF
S06 Att Amend 0002 AE501 - BUILDING DETAILS.pdf PDF
S06 Att Amend 0002 AI901 - SIGNAGE PLAN.pdf PDF
S06 Att Amend 0002 AI101 - FINISH WALL TREATMENT PLAN.pdf PDF
S06 Att Amend 0002 EP401 - ONE LINE DIAGRAM.pdf PDF
S06 Att Wage Determination 6.5.20.pdf PDF
Site Visit Sign In 5.20.20.pdf PDF
36C25220B0021 0001.docx DOCX document
Amend 0001 Specification 22 63 00.pdf PDF
Amend 0001 Specification 00 01 10.pdf PDF
Amend 0001 Specification 08 14 00.pdf PDF
Amend 0001 Specification 09 06 00.pdf PDF
Amend 0001 J_A Patient Ceiling Lift.pdf PDF
36C25220B0021-011.pdf PDF
36C25220B0021-012.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T

T

T T T

T

T

T

TT

T

T

T

T

T

T

T T

TT

T

T

B

PROJECT AREA A

C

20/818/812/610/6

8/6

/6

/6

/6

18/10 20/10

12/6 38/10

22/10

/1

18/8

/6

/6 38/10 6 /1

/1

/1

8/6

8/6

46/10

32/10

/6

/6 ø ø8

/6

/6

/6

/6

/6 6 ø ø

10ø 10ø

14/6

8/6

/1

/6

8/6

8/6

12/6

8/6

/6

/8

/8

/68

/6

10/6

16/8

8/6

8/6

/6

8/6

14/6 14/6

12/6

10/6 ø ø 8 /6

/6 ø ø

6ø 6ø ø ø

6ø

6ø

/6

/6

/6

/6

/6

/6

/6

40/10 46/10

30/1028/10

1" 1"

/1

EXFCU EXFCU EXFCUEXCCH

EXFCU

EXFCU

EXFCU EXFCU EXFCU EXFCU

EXCONV

EXFCU EXFCU EXFCU EXFCU

EXFCU

EXCONV

EXFCU

EXFCU

EXFCU

EXFCU

EXFCU

EXFCU

EXFCU

EXFCU

EXFCU

EXFCU

EXFCU EXFCU

FSFSFSFS

FS

F

F

F

1 2 6

9 10

3 4 5 7 8

11 13 15 17 191612

K

H

E

C

B

A

J

D

KEYED NOTES:

1. REMOVE 4-PIPE FAN COIL UNIT PIPING, HEATING COIL,

CONTROLS INCLUDING PNEUMATIC TUBING IN ITS ENTIRETY.

COORDINATE DISCONNECT OF ELECTRICAL SERVICE WITH

E.C. SEE SHEET MD103 FOR ADDITIONAL WORK. CABINET

SHALL BE LEFT IN PLACE AND ITS REMOVAL IS PART OF

ABATEMENT CONTRACT.

2. REMOVE CABINET WALL HEATER, PIPING AND CONTROLS

INCLUDING PNEUMATIC TUBING IN ITS ENTIRETY. SEE SHEET

MD103 FOR ADDITIONAL WORK. CABINET SHALL BE LEFT IN

PLACE AND ITS REMOVAL IS PART OF ABATEMENT CONTRACT.

3. REMOVE DUCTWORK TO THIS POINT AND CAP.

4. REMOVE REHEAT COIL AND ASSOCAITED PIPING, HANGERS,

CONTROLS INCLUDING PNEUMATIC TUBING. PIPING TO BE

REMOVED TO POINT SHOWN, CAP AND INSULATE.

5. FOR CONTINUATION OF DUCTWORK DEMOLITION, SEE SHEET

MD102.

6. REMOVE HEATING WATER PIPING TO THIS POINT, CAP AND

INSULATE.

7. CONTRACTOR TO REMOVE PNEUMATIC 2-WAY CONTROL

VALVE AND ASSOCIATED THERMOSTAT. SEE SHEET MP101

FOR ADDITIONAL WORK.

GENERAL NOTES:

CONTRACTOR TO NOTE THAT THE INTENT OF DEMOLITION

IS TO REMOVE EXISTING ELEMENTS IN THEIR ENTIRETY TO

ACCOMMODATE NEW CONSTRUCTION. ITEMS NOTED FOR

DEMOLITION ARE FOR REFERENCE AND DO NOT

REPRESENT EVERY ITEM TO BE DEMOLISHED.

CONTRACTOR TO ENSURE ALL ITEMS LOCATED WITHIN

SCOPE BOUNDARY NECESSARY FOR INSTALLATION OF

NEW CONSTRUCTION ARE REMOVED AND DISPOSED OF.

EQUIPMENT SHOWN ON DEMOLITION PLAN IS EXISTING TO

BE REMOVED UNLESS NOTED OTHERWISE. IN ADDITION TO

REMOVING DEVICES, REMOVE ASSOCIATED ELECTRICAL

CIRCUITS AND EMPTY RACEWAYS BACK TO SOURCE.

REFER TO THE SPECIFICATIONS FOR ELECTRICAL

DEMOLITION REQUIREMENTS.

INFORMATION SHOWN ON THE PLANS WAS GATHERED

FROM FIELD OBSERVATION AND EXISTING DRAWINGS.

CONTRACTOR SHALL FIELD VERIFY EXACT DEMOLITION

REQUIREMENTS AND INCLUDE ASSOCIATED COSTS.

DASHED WALLS INDICATE EXISTING WALLS BEING

REMOVED. REFER TO ARCHITECTURAL DEMOLITION AND

PHASING PLANS FOR THE EXACT EXTENT OF GENERAL

CONSTRUCTION DEMOLITION REQUIRED.

CONTRACTOR SHALL REFER TO THE ARCHITECTURAL

PLANS FOR LOCATIONS OF SMOKE PARTITIONS AND FIRE

RATED WALLS, FLOORS, AND CEILINGS AND THEIR

HOURLY RATINGS. CONTRACTOR SHALL PROVIDE FIRE

STOPPING FOR CONDUITS AND OTHER PENETRATIONS

COVERED UNDER DIVISION 26 IN THESE SURFACES.

FIRESTOPPING SHALL MEET OR EXCEED THE RATING OF

THE SURFACE BEING PENETRATED. REFER TO

SPECIFICATION 07 84 00 FOR ADDITIONAL INFORMATION.

ABOVE CEILING DEMOLITION, NEW AND RESTORATION

WORK ON THE 6TH, 7TH OR 8TH FLOOR - WITH THE

EXCEPTION OF UTILITY OUTAGES THAT AFFECT PATIENT

CARE, DISRUPT HOSPITAL OPERATIONS OR REQUIRE A

CURTAILMENT OF SERVICES MEMO - CAN BE COMPLETED

DURING ANY SHIFT ONCE INFECTION CONTROL BARRIERS

ARE ESTABLISHED AND APPROVED PER THE SUBMITTED

PHASING AND WORKPLAN. THE CONTRACTOR MAY WORK

OFF-SHIFT AS WELL TO COMPLETE CONSTRUCTION

ACTIVITIES IN AN EXPEDITED MANNER. UTILITY OUTAGES

THAT AFFECT PATIENT CARE, DISRUPT HOSPITAL

OPERATIONS OR REQUIRE A CURTAILMENT OF SERVICES

MEMO MUST BE COMPLETED ON 2ND OR 3RD SHIFTS ON

WEEKDAYS OR ANYTIME ON WEEKEND (SAT & SUN).

SEE ARCHITECUTRAL PLANS FOR PROJECT PHASING

DRAWINGS AND NOTES.

REMOVE EXISTING HVAC SYSTEM SHOWN IN BOLD DASHED

LINE TO POINTS SHOWN. COORDINATE POWER

DISCONNECT WITH E.C.

SEE SHEET KEYED NOTES FOR ADDITIONAL DEMOLITION

NOTES.

FOR DEMOLITION OF FAN COIL UNIT PIPING, INFILL OF

FLOOR PENETRATIONS SHALL BE RESPONSIBILITY OF G.C.,

COORDINATE ALL LOCATIONS WITH G.C.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

OFFICE

CORRIDOR

C7A14

OFFICE

OFFICE

SUPPLY

7102A

SUPPLY

TOILET

EXAM

7105EXAM

EXAM

EXAM

EXAM

EXAM

OFFICE

TOILET

OFFICE

OFFICE

ORTHO WAITING

OFFICE

HAC

FAC

7A01

STORAGE

TOILET

7134A

TOILET

STR

7-4

TOILET

EC

EC

VP

7-30

ORTHO SUPPLY

SOILED UTILITY

EXAM

EXAM

7142 EXAM

EXAM

EXAM

CAST RM

STORAGE

7148A

STORAGE

EXAM

TOILET

7146A

FAC

7A02

EC

VP

7-33

EC

OFFICE

7110A

OFFICE

7110C

OFFICE

CORRIDOR

C7A13

CORRIDOR

C7A12

CORRIDOR

C7A11

CORRIDOR

C7A11A

CORRIDOR

C7A08

HALLWAY

A0733

CORRIDOR

C7A07

TOILET

7119A

TOILET

7117A

TOILET

7115A

TOILET

7107A OFFICE

OFFICE

OFFICE

EXAM

EXAM

TOILET

7215A

TOILET

7207A

WAITING

EXAM

TOILET

7150A

TOILET

7252A

OFFICE

STORAGE

7250A

STORAGE

LAB

BREAK

WOUND STAFF

7240C

RESTROOM

WAITING

MED RM

7210A

OFFICE

OFFICE

WAITING

CONTROL

7150B

WOUND

7240B

PROCTO

7240A

TOILET

CORRIDOR

C7A04A

CORRIDOR

C7A01

CORRIDOR

C7A05

CIRRIDOR

C7A04

STORAGE

ELEV

7-A-8

ELEV

7-A-7

OFFICE

OFFICE

CORRIDOR

C7A06

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C

R e v it L o c a lF ile s \9

.0

M

R

D -H

O B

L M

.r v t

/5

/2

:2

:2

P M

MD101

MECHANICAL DEMOLITION FLOOR

PLAN - 7TH FLOORGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. Capitol Drive

Brookfield, WI 53045

414.778.1700

RENOVATE AND EXPAND

DIALYSIS CLINIC

CLEMENT J. ZABLOCKI VAMC

695-19-131

03/26/2020 FLL LMH

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

1" = 100'-0"

KEY PLAN

1/8" = 1'-0"1 SEVENTH FLOOR PLAN - DEMOLITION PLAN

1 1 2 2

1 1

N

Revisions: Date:

Adendum 02 06/05/2020

N

9167.01_M18_RD-HOBLM
MD101 - MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR

File details come from the government source that posted it. Updated .