S06 Att Amend 0002 MD101 - MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR.pdf
PDF 381 KB Posted
- Solicitation number
- 36C25220B0021
About this file
This document contains a federal contract opportunity notice and related mechanical demolition floor plan for renovating and expanding a dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contract opportunity involves demolishing an existing vacant ward and reconstructing the space to become the new home for the hospital's dialysis clinic, relocating it from the fifth floor. The construction work includes demolition, concrete, electrical, plumbing, technical, mechanical, patient ceiling lifts, pneumatic tube, and architectural trades. Specialty furnishings to support dialysis operations are also required. The project area is bounded by vacant and occupied spaces. The total renovated space is approximately 11,000 square feet. Hazardous materials abatement for asbestos is included. The project magnitude price range is between $2,000,000 to $5,000,000. The solicitation is scheduled to post on May 13, 2020 with a bid opening of June 16, 2020. A pre-bid conference will be held. The contract is set aside for Service Disabled Veteran Owned Small Businesses and awardees must be verified in the VIP database. The period of performance is 540 calendar days from notice to proceed.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
T T T
T
T
T
TT
T
T
T
T
T
T
T T
TT
T
T
B
PROJECT AREA A
C
20/818/812/610/6
8/6
/6
/6
/6
18/10 20/10
12/6 38/10
22/10
/1
18/8
/6
/6 38/10 6 /1
/1
/1
8/6
8/6
46/10
32/10
/6
/6 ø ø8
/6
/6
/6
/6
/6 6 ø ø
10ø 10ø
14/6
8/6
/1
/6
8/6
8/6
12/6
8/6
/6
/8
/8
/68
/6
10/6
16/8
8/6
8/6
/6
8/6
14/6 14/6
12/6
10/6 ø ø 8 /6
/6 ø ø
6ø 6ø ø ø
6ø
6ø
/6
/6
/6
/6
/6
/6
/6
40/10 46/10
30/1028/10
1" 1"
/1
EXFCU EXFCU EXFCUEXCCH
EXFCU
EXFCU
EXFCU EXFCU EXFCU EXFCU
EXCONV
EXFCU EXFCU EXFCU EXFCU
EXFCU
EXCONV
EXFCU
EXFCU
EXFCU
EXFCU
EXFCU
EXFCU
EXFCU
EXFCU
EXFCU
EXFCU
EXFCU EXFCU
FSFSFSFS
FS
F
F
F
1 2 6
9 10
3 4 5 7 8
11 13 15 17 191612
K
H
E
C
B
A
J
D
KEYED NOTES:
1. REMOVE 4-PIPE FAN COIL UNIT PIPING, HEATING COIL,
CONTROLS INCLUDING PNEUMATIC TUBING IN ITS ENTIRETY.
COORDINATE DISCONNECT OF ELECTRICAL SERVICE WITH
E.C. SEE SHEET MD103 FOR ADDITIONAL WORK. CABINET
SHALL BE LEFT IN PLACE AND ITS REMOVAL IS PART OF
ABATEMENT CONTRACT.
2. REMOVE CABINET WALL HEATER, PIPING AND CONTROLS
INCLUDING PNEUMATIC TUBING IN ITS ENTIRETY. SEE SHEET
MD103 FOR ADDITIONAL WORK. CABINET SHALL BE LEFT IN
PLACE AND ITS REMOVAL IS PART OF ABATEMENT CONTRACT.
3. REMOVE DUCTWORK TO THIS POINT AND CAP.
4. REMOVE REHEAT COIL AND ASSOCAITED PIPING, HANGERS,
CONTROLS INCLUDING PNEUMATIC TUBING. PIPING TO BE
REMOVED TO POINT SHOWN, CAP AND INSULATE.
5. FOR CONTINUATION OF DUCTWORK DEMOLITION, SEE SHEET
MD102.
6. REMOVE HEATING WATER PIPING TO THIS POINT, CAP AND
INSULATE.
7. CONTRACTOR TO REMOVE PNEUMATIC 2-WAY CONTROL
VALVE AND ASSOCIATED THERMOSTAT. SEE SHEET MP101
FOR ADDITIONAL WORK.
GENERAL NOTES:
CONTRACTOR TO NOTE THAT THE INTENT OF DEMOLITION
IS TO REMOVE EXISTING ELEMENTS IN THEIR ENTIRETY TO
ACCOMMODATE NEW CONSTRUCTION. ITEMS NOTED FOR
DEMOLITION ARE FOR REFERENCE AND DO NOT
REPRESENT EVERY ITEM TO BE DEMOLISHED.
CONTRACTOR TO ENSURE ALL ITEMS LOCATED WITHIN
SCOPE BOUNDARY NECESSARY FOR INSTALLATION OF
NEW CONSTRUCTION ARE REMOVED AND DISPOSED OF.
EQUIPMENT SHOWN ON DEMOLITION PLAN IS EXISTING TO
BE REMOVED UNLESS NOTED OTHERWISE. IN ADDITION TO
REMOVING DEVICES, REMOVE ASSOCIATED ELECTRICAL
CIRCUITS AND EMPTY RACEWAYS BACK TO SOURCE.
REFER TO THE SPECIFICATIONS FOR ELECTRICAL
DEMOLITION REQUIREMENTS.
INFORMATION SHOWN ON THE PLANS WAS GATHERED
FROM FIELD OBSERVATION AND EXISTING DRAWINGS.
CONTRACTOR SHALL FIELD VERIFY EXACT DEMOLITION
REQUIREMENTS AND INCLUDE ASSOCIATED COSTS.
DASHED WALLS INDICATE EXISTING WALLS BEING
REMOVED. REFER TO ARCHITECTURAL DEMOLITION AND
PHASING PLANS FOR THE EXACT EXTENT OF GENERAL
CONSTRUCTION DEMOLITION REQUIRED.
CONTRACTOR SHALL REFER TO THE ARCHITECTURAL
PLANS FOR LOCATIONS OF SMOKE PARTITIONS AND FIRE
RATED WALLS, FLOORS, AND CEILINGS AND THEIR
HOURLY RATINGS. CONTRACTOR SHALL PROVIDE FIRE
STOPPING FOR CONDUITS AND OTHER PENETRATIONS
COVERED UNDER DIVISION 26 IN THESE SURFACES.
FIRESTOPPING SHALL MEET OR EXCEED THE RATING OF
THE SURFACE BEING PENETRATED. REFER TO
SPECIFICATION 07 84 00 FOR ADDITIONAL INFORMATION.
ABOVE CEILING DEMOLITION, NEW AND RESTORATION
WORK ON THE 6TH, 7TH OR 8TH FLOOR - WITH THE
EXCEPTION OF UTILITY OUTAGES THAT AFFECT PATIENT
CARE, DISRUPT HOSPITAL OPERATIONS OR REQUIRE A
CURTAILMENT OF SERVICES MEMO - CAN BE COMPLETED
DURING ANY SHIFT ONCE INFECTION CONTROL BARRIERS
ARE ESTABLISHED AND APPROVED PER THE SUBMITTED
PHASING AND WORKPLAN. THE CONTRACTOR MAY WORK
OFF-SHIFT AS WELL TO COMPLETE CONSTRUCTION
ACTIVITIES IN AN EXPEDITED MANNER. UTILITY OUTAGES
THAT AFFECT PATIENT CARE, DISRUPT HOSPITAL
OPERATIONS OR REQUIRE A CURTAILMENT OF SERVICES
MEMO MUST BE COMPLETED ON 2ND OR 3RD SHIFTS ON
WEEKDAYS OR ANYTIME ON WEEKEND (SAT & SUN).
SEE ARCHITECUTRAL PLANS FOR PROJECT PHASING
DRAWINGS AND NOTES.
REMOVE EXISTING HVAC SYSTEM SHOWN IN BOLD DASHED
LINE TO POINTS SHOWN. COORDINATE POWER
DISCONNECT WITH E.C.
SEE SHEET KEYED NOTES FOR ADDITIONAL DEMOLITION
NOTES.
FOR DEMOLITION OF FAN COIL UNIT PIPING, INFILL OF
FLOOR PENETRATIONS SHALL BE RESPONSIBILITY OF G.C.,
COORDINATE ALL LOCATIONS WITH G.C.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
OFFICE
CORRIDOR
C7A14
OFFICE
OFFICE
SUPPLY
7102A
SUPPLY
TOILET
EXAM
7105EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
TOILET
OFFICE
OFFICE
ORTHO WAITING
OFFICE
HAC
FAC
7A01
STORAGE
TOILET
7134A
TOILET
STR
7-4
TOILET
EC
EC
VP
7-30
ORTHO SUPPLY
SOILED UTILITY
EXAM
EXAM
7142 EXAM
EXAM
EXAM
CAST RM
STORAGE
7148A
STORAGE
EXAM
TOILET
7146A
FAC
7A02
EC
VP
7-33
EC
OFFICE
7110A
OFFICE
7110C
OFFICE
CORRIDOR
C7A13
CORRIDOR
C7A12
CORRIDOR
C7A11
CORRIDOR
C7A11A
CORRIDOR
C7A08
HALLWAY
A0733
CORRIDOR
C7A07
TOILET
7119A
TOILET
7117A
TOILET
7115A
TOILET
7107A OFFICE
OFFICE
OFFICE
EXAM
EXAM
TOILET
7215A
TOILET
7207A
WAITING
EXAM
TOILET
7150A
TOILET
7252A
OFFICE
STORAGE
7250A
STORAGE
LAB
BREAK
WOUND STAFF
7240C
RESTROOM
WAITING
MED RM
7210A
OFFICE
OFFICE
WAITING
CONTROL
7150B
WOUND
7240B
PROCTO
7240A
TOILET
CORRIDOR
C7A04A
CORRIDOR
C7A01
CORRIDOR
C7A05
CIRRIDOR
C7A04
STORAGE
ELEV
7-A-8
ELEV
7-A-7
OFFICE
OFFICE
CORRIDOR
C7A06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C
R e v it L o c a lF ile s \9
.0
M
R
D -H
O B
L M
.r v t
/5
/2
:2
:2
P M
MD101
MECHANICAL DEMOLITION FLOOR
PLAN - 7TH FLOORGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. Capitol Drive
Brookfield, WI 53045
414.778.1700
RENOVATE AND EXPAND
DIALYSIS CLINIC
CLEMENT J. ZABLOCKI VAMC
695-19-131
03/26/2020 FLL LMH
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
1" = 100'-0"
KEY PLAN
1/8" = 1'-0"1 SEVENTH FLOOR PLAN - DEMOLITION PLAN
1 1 2 2
1 1
N
Revisions: Date:
Adendum 02 06/05/2020
N
| 9167.01_M18_RD-HOBLM |
| MD101 - MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR |
File details come from the government source that posted it. Updated .