S06 Att Amend 0002 AD101 - SEVENTH FLOOR DEMOLITION PLAN.pdf

PDF 546 KB Posted

Attached to
Z2DA--Project # 695-19-131 Renovate and Expand Dialysis Clinic Clement J. Zablocki VA Medical Center Milwaukee, WI
Solicitation number
36C25220B0021
Issued by

About this file

This document provides details for a federal contract opportunity to renovate and expand a dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contract scope includes demolition, concrete, electrical, plumbing, mechanical, technical, architectural, and specialty furnishing work to renovate approximately 11,000 square feet of vacant space on the seventh floor for use as an expanded dialysis clinic. Hazardous materials abatement is required. The project budget range is $2 million to $5 million. The solicitation is scheduled to post on May 13, 2020, with a bid opening on June 16, 2020. A pre-bid conference will be held. The contract period of performance is 540 calendar days from notice to proceed. This opportunity is set aside 100% for service-disabled veteran-owned small businesses, and offerors must represent their status at submission.

View the file

Other files

File Type Posted
Amend 0005 00 01 10 TABLE OF CONTENTS.pdf PDF
Amend 0005 22 67 19.16 REVERSE-OSMOSIS WATER EQUIPMENT.pdf PDF
Amend 0005 08 71 13.11 LOW ENERGY DOOR OPERATORS.pdf PDF
S06 36C25220B0021 0005.pdf PDF
Amend 0005 01 91 00 COMMISSIONING REQUIREMENTS.pdf PDF
Amend 0005 01 01 10 SN SPECIAL NOTES.pdf PDF
Amend 0005 11 73 00 CEILING MOUNT PATIENT LIFT.pdf PDF
Amend 0005 14 92 00 PNEUMATIC TUBE SYSTEM.pdf PDF
Amend 0003 Photos Revised.pdf PDF
S06 36C25220B0021 0004.pdf PDF
AI601 - FINISH SCHEDULES.pdf PDF
Wage Determination 6.19.20.pdf PDF
Amend 0003 Photos.pdf PDF
SECTION 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
36C25220B0021 0003.pdf PDF
S06 Att Amend 0002 00 01 10 - TABLE OF CONTENTS.pdf PDF
S06 Att Amend 0002 EP100 - BASEMENT FLOOR OVERALL PLAN.pdf PDF
S06 Att Amend 0002 AI201 - INTERIOR FINISHES ELEVATIONS.pdf PDF
S06 Att Amend 0002 AE601 - DOOR_WINDOW SCHEDULE.pdf PDF
S06 36C25220B0021 0002.pdf PDF
S06 Att Amend 0002 28 05 13 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY.pdf PDF
S06 Att Amend 0002 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
S06 Att Amend 0002 01 74 19 - CONSTRUCTION WASTE MANAGEMENT.pdf PDF
S06 Att Amend 0002 GC101 - INFECTION CONTROL_PHASING PLAN.pdf PDF
S06 Att Amend 0002 09 05 16 - FLOOR PREP1.pdf PDF
S06 Att Amend 0002 ET102 - SEVENTH FLOOR SYSTEMS PLAN - DIVISION 28.pdf PDF
S06 Att Amend 0002 MD101 - MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR.pdf PDF
S06 Att Amend 0002 10 14 00 - SIGNAGE.pdf PDF
S06 Att Amend 0002 12 24 00 - WINDOW SHADES.pdf PDF
S06 Att Site Visit Sign In 5.28.20.pdf PDF
S06 Att Amend 0002 03 30 53 - CAST-IN-PLACE CONCRETE.pdf PDF
S06 Att Amend 0002 QH101 - SEVENTH FLOOR EQUIPMENT PLAN.pdf PDF
S06 Att Amend 0002 01 91 00 - COMMISSIONING REQUIREMENTS.pdf PDF
S06 Att Amend 0002 22 07 11 - PLUMBING INSULATION.pdf PDF
S06 Att Amend 0002 ET101D - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 22 11 00 - FACILITY WATER DISTRIBUTION.pdf PDF
S06 Att Amend 0002 AE501 - BUILDING DETAILS.pdf PDF
S06 Att Amend 0002 AI901 - SIGNAGE PLAN.pdf PDF
S06 Att Amend 0002 AI101 - FINISH WALL TREATMENT PLAN.pdf PDF
S06 Att Amend 0002 EP401 - ONE LINE DIAGRAM.pdf PDF
S06 Att Wage Determination 6.5.20.pdf PDF
Site Visit Sign In 5.20.20.pdf PDF
36C25220B0021 0001.docx DOCX document
Amend 0001 Specification 22 63 00.pdf PDF
Amend 0001 Specification 00 01 10.pdf PDF
Amend 0001 Specification 08 14 00.pdf PDF
Amend 0001 Specification 09 06 00.pdf PDF
Amend 0001 J_A Patient Ceiling Lift.pdf PDF
36C25220B0021-011.pdf PDF
36C25220B0021-012.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

1. EXISTING DOOR, FRAME AND HARDWARE TO REMAIN.

2. REMOVE CEILING MOUNTED EQUIPMENT AND HANGER ASSEMBLIES IN

THEIR ENTIRETY, SUCH AS CUBICLE CURTAIN AND IV TRACKS, MONITOR AND

TV MOUNTS, AND OTHER SIMILAR MEDICAL EQUIPMENT.

3. REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.

4. REMOVE TOILET PARTITION ASSEMBLIES.

5. REMOVE WALL AND FLOOR MOUNTED CASEWORK.

6. REMOVE EXISTING TELECOM AND WALL BOXES AND RELOCATE ANY

CONDUIT, WIRE, PIPE THAT MAY PASS THROUGH TO ABOVE THE CEILING.

SEE ENGINEERING DRAWINGS FOR EXTENT OF DEMOLITION.

7. REMOVE CERAMIC TILE FLOORING AND ACCOMPANYING MORTAR BED IN ITS

ENTIRETY. ASSUME 2" THICKSET MORTAR BED, AND 3/4" WALL TILE.

COORDINATE WITH ACM AND SHEET HA101.

8. REMOVE EXTERIOR WINDOW. PREPARE FOR NEW CONSTRUCTION.

9. NOT USED.

10. EXISTING EXPANSION JOINT. REMOVE COVER PLATE AND PREP FOR NEW

EXPANSION JOINT COVER. COORDINATE REMOVAL WITH COR. MAINTAIN

EXISTING EXPANSION JOINT COVER AS LONG AS POSSIBLE PRIOR TO

INSTALL OF NEW COVER.

11. REMOVE CERAMIC 3/4" WALL TILE. COORDINATE WITH ACM AND HA101.

12. WORK WILL TAKE PLACE ABOVE CEILING IN CORRIDOR C7B01 OUTSIDE OF

SCOPE BOUNDARY. CEILING WILL BE DEMOLISHED. NEW CEILING AND LIGHT

FIXTURES WILL BE REQUIRED. INSTALL NEW CEILING AND LIGHTS TO MATCH

EXISTING LAYOUT. REFER TO MECHANICAL DRAWINGS FOR SCOPE OF

WORK TO BE PERFORMED ABOVE CEILING. PATCH AND REPAIR FINISHES IN

THE CORRIDOR AS REQUIRED. PROVIDE INFECTION CONTROL PLAN TO COR

FOR APPROVAL PRIOR TO BEGINNING WORK.

13. MEDGAS PANEL TO BE REMOVED. PREPARE FOR REINSTALLATION. REFER

TO MEDGAS DRAWINGS FOR MORE INFORMATION.

#DEMOLITION PLAN NOTES

1 2 6

9 10

3 4 5 7 8

11 13 15 17 191612

K

H

E

C

B

A

J

D

8 8

3 3

3 3

7 7

11 11 11 11

OFFICE

CORRIDOR

C7A14

OFFICE

OFFICE

SUPPLY

7102A

SUPPLY

TOILET

EXAM

EXAM

EXAM

EXAM

EXAM

EXAM

OFFICE

TOILET

OFFICE

OFFICE

ORTHO WAITING

OFFICE

HAC

FAC

7A01

STORAGE

TOILET

7134A

TOILET

STR

7-4

TOILET

EC

EC

VP

7-30

ORTHO SUPPLY

SOILED UTILITY

EXAM

EXAM

7142 EXAM

EXAM

EXAM

CAST RM

STORAGE

7148A

STORAGE

EXAM

TOILET

7146A

FAC

7A02

EC

VP

7-33

EC

OFFICE

7110A

OFFICE

7110C

OFFICE

CORRIDOR

C7A13

CORRIDOR

C7A12

CORRIDOR

C7A11

CORRIDOR

C7A11A

CORRIDOR

C7A08

HALLWAY

A0733

CORRIDOR

C7A07

TOILET

7119A

TOILET

7117A

TOILET

7115A

TOILET

7107A OFFICE

OFFICE

OFFICE

EXAM

EXAM

TOILET

7215A

TOILET

7207A

WAITING

EXAM

TOILET

7150A

TOILET

7252A

OFFICE

STORAGE

7250A

STORAGE

LAB

7246 BREAK

WOUND STAFF

7240C

RESTROOM

WAITING

MED RM

7210A

OFFICE

OFFICE

WAITING

CONTROL

7150B

WOUND

7240B

PROCTO

7240A

TOILET

CORRIDOR

C7A04A

CORRIDOR

C7A01

CORRIDOR

C7A05

CIRRIDOR

C7A04

HAC

VP

7-29

TOILET

TOILET

CORRIDOR

C7B02

STORAGE

OFFICE

EXAM

ELEV

7-A-5

ELEV

7-A-6

ELEV

7-A-8

ELEV

7-A-7

OFFICE

OFFICE

OFFICE

EXAM

EXAM

EXAM

DIRTY UTILITY

ENT OFFICE

OFFICE

OFFICE

EXAM

ENT SUPPLY

7306A

HALLWAY

C7B10

CORRIDOR

C7B10A

STR

7-1

ELEV

7-B-12

ELEV

7-B-9

TC

EC

ELEV

7-B-10

ELEV

7-B-11

ELEV LOBBY

C7B05

CORRIDOR

C7B04

CORRIDOR

C7B03B

TRASH RM

OFFICE

OFFICE

CORRIDOR

C7A06

CORRIDOR

C7B01

B

C

PROJECT AREA A

A. CONTRACTOR TO NOTE THAT THE INTENT OF DEMOLITION IS TO REMOVE

EXISTING ELEMENTS IN THEIR ENTIRETY TO ACCOMMODATE NEW

CONSTRUCTION. ITEMS NOTED FOR DEMOLITION ARE FOR REFERENCE AND

DO NOT REPRESENT EVERY ITEM TO BE DEMOLISHED. CONTRACTOR TO

ENSURE ALL ITEMS LOCATED WITHIN SCOPE BOUNDARY NECESSARY FOR

INSTALLATION OF NEW CONSTRUCTION ARE REMOVED AND DISPOSED OF.

B. THE SIXTH FLOOR IS AN ACTIVE EMPLOYEE WORK AREA 6AM – 5PM M-F. THE

CONTRACTOR SHALL BE ALLOWED UNENCUMBERED ACCESS TO PORTIONS

OF THE SIXTH FLOOR TO COMPLETE MEPF DEMOLITION, RELOCATIONS AND

NEW WORK. THE CONTRACTOR SHALL PLAN FOR SEVEN (7) SUB-PHASES

FOR THIS WORK. FP DEMO, PLUMBING AND HVAC PERIMETER PIPING DEMO

SHALL BE COORDINATED. EACH PHASE SHALL HAVE ITS OWN PLASTIC

INFECTION CONTROL BARRIER WITH ZIP-WALLS AND NEGATIVE AIR

MACHINES. CEILING SHALL BE RETURNED TO NORMAL AT END OF THE WORK

DAY. OFF-SHIFT WORK IS ACCEPTABLE WITH COR PERMISSION. OUTAGES

SHALL BE OFF-SHIFT. EACH SUB-PHASE REQUIRES ITS OWN INFECTION

CONTROL WORKPLAN. AN OVERALL SUB-PHASING PLAN IS REQUIRED

DURING PRE-CONSTRUCTION SUBMITTAL PHASE TO COORDINATE ACCESS

TO SIXTH FLOOR SPACES AND MOVES BY VA PERSONNEL.

C. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND

REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION

SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING

IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE

DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.

CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND

ITEMS REQUIRED TO BE REMOVED.

D. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE101 FOR DEMOLITION

SYSTEMS AND DRAWING NOMENCLATURE.

E. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN

UNLESS OTHERWISE NOTED.

F. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE

PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO

VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH

CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.

G. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH ARCHITECTURAL

FLOOR PLAN SHEET AE101, ENGINEERING DRAWINGS, AND VENDOR

DRAWINGS.

H. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED

ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF

WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE

NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN

INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS

WORK.

I. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION

ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO

ACCOMMODATE NEW CONSTRUCTION.

J. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE

NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH

THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE

SMOOTH AND UNDETECTABLE.

K. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES

SHALL BE REMOVED AND STORED IN A SAFE MANOR UNTIL CEILING TILES

CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE

REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED

AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR

FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE

REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED

ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING

PANELS, WITHIN AND BEYOND PROJECT LIMITS.

L. WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE

SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL

BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING

MANUFACTURER'S RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.

M. COORDINATE SCOPE OF FLOORING REMOVAL WITH HAZMAT PLAN SHEET

HA101.

N. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS

OTHERWISE INDICATED.

O. COLUMN WRAPS SHALL BE REMOVED FROM EXISTING COLUMNS

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE INDICATED.

REMOVE ALL PLASTER, LATH, LAMINATIONS TO BARE CONCRETE AT LEAST

TO 8'-6' AFF.

P. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE INDICATED.

Q. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE

THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.

R. COORDINATE REMOVAL OF OXYGEN, VACUUM, NURSE CALL AND SPECIAL

ELECTRICAL ITEM WITH ENGINEERING DRAWINGS.

S. REMOVED DOORS, FRAMES AND HARDWARE THROUGHOUT PROJECT

BOUNDARY UNLESS OTHERWISE NOTED.

T. REMOVE EXISTING WALL PROTECTION, CORNER GUARDS, HANDRAILS AND/

OR GUARDRAILS THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE

NOTED.

U. REMOVE EXISTING FURING PARTITIONS AT EXTERIOR WALLS THROUGHOUT

PROJECT BOUNDARY UNLESS OTHERWISE INDICATED.

V. REMOVE ALL FAN COIL UNITS AND WINDOW SILLS AT EXTERIOR WINDOWS.

REFER TO ENGINEERING DRAWINGS FOR FCU REMOVAL.

W. DEMOLITION AT COLUMNS SHALL INCLUDE PLATER, LATHE, AND

LAMINATIONS. REMOVE TO BARE CONCRETE AT LEAST 8'-6" AFF.

DEMOLITION GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.1

A v d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/5

/2

:2

:1

P M

AD101

SEVENTH FLOOR DEMOLITION

PLANGUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

414.778.1700

RENOVATE AND EXPAND

DIALYSIS CLINIC

5000 W National Ave, Milwaukee, WI 53295

695-19-131

03/26/2020

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

SCALE: 1/8" = 1'-0"AD101

2 SEVENTH FLOOR DEMO PLAN

N

SCALE: 1" = 100'-0"

KEY PLAN

Revisions: Date:

ADDENDUM 02 06/05/2020

File details come from the government source that posted it. Updated .