S06 Att Amend 0002 AD101 - SEVENTH FLOOR DEMOLITION PLAN.pdf
PDF 546 KB Posted
- Solicitation number
- 36C25220B0021
About this file
This document provides details for a federal contract opportunity to renovate and expand a dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contract scope includes demolition, concrete, electrical, plumbing, mechanical, technical, architectural, and specialty furnishing work to renovate approximately 11,000 square feet of vacant space on the seventh floor for use as an expanded dialysis clinic. Hazardous materials abatement is required. The project budget range is $2 million to $5 million. The solicitation is scheduled to post on May 13, 2020, with a bid opening on June 16, 2020. A pre-bid conference will be held. The contract period of performance is 540 calendar days from notice to proceed. This opportunity is set aside 100% for service-disabled veteran-owned small businesses, and offerors must represent their status at submission.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
1. EXISTING DOOR, FRAME AND HARDWARE TO REMAIN.
2. REMOVE CEILING MOUNTED EQUIPMENT AND HANGER ASSEMBLIES IN
THEIR ENTIRETY, SUCH AS CUBICLE CURTAIN AND IV TRACKS, MONITOR AND
TV MOUNTS, AND OTHER SIMILAR MEDICAL EQUIPMENT.
3. REMOVE ACOUSTIC PANEL CEILING ASSEMBLY IN ITS ENTIRETY.
4. REMOVE TOILET PARTITION ASSEMBLIES.
5. REMOVE WALL AND FLOOR MOUNTED CASEWORK.
6. REMOVE EXISTING TELECOM AND WALL BOXES AND RELOCATE ANY
CONDUIT, WIRE, PIPE THAT MAY PASS THROUGH TO ABOVE THE CEILING.
SEE ENGINEERING DRAWINGS FOR EXTENT OF DEMOLITION.
7. REMOVE CERAMIC TILE FLOORING AND ACCOMPANYING MORTAR BED IN ITS
ENTIRETY. ASSUME 2" THICKSET MORTAR BED, AND 3/4" WALL TILE.
COORDINATE WITH ACM AND SHEET HA101.
8. REMOVE EXTERIOR WINDOW. PREPARE FOR NEW CONSTRUCTION.
9. NOT USED.
10. EXISTING EXPANSION JOINT. REMOVE COVER PLATE AND PREP FOR NEW
EXPANSION JOINT COVER. COORDINATE REMOVAL WITH COR. MAINTAIN
EXISTING EXPANSION JOINT COVER AS LONG AS POSSIBLE PRIOR TO
INSTALL OF NEW COVER.
11. REMOVE CERAMIC 3/4" WALL TILE. COORDINATE WITH ACM AND HA101.
12. WORK WILL TAKE PLACE ABOVE CEILING IN CORRIDOR C7B01 OUTSIDE OF
SCOPE BOUNDARY. CEILING WILL BE DEMOLISHED. NEW CEILING AND LIGHT
FIXTURES WILL BE REQUIRED. INSTALL NEW CEILING AND LIGHTS TO MATCH
EXISTING LAYOUT. REFER TO MECHANICAL DRAWINGS FOR SCOPE OF
WORK TO BE PERFORMED ABOVE CEILING. PATCH AND REPAIR FINISHES IN
THE CORRIDOR AS REQUIRED. PROVIDE INFECTION CONTROL PLAN TO COR
FOR APPROVAL PRIOR TO BEGINNING WORK.
13. MEDGAS PANEL TO BE REMOVED. PREPARE FOR REINSTALLATION. REFER
TO MEDGAS DRAWINGS FOR MORE INFORMATION.
#DEMOLITION PLAN NOTES
1 2 6
9 10
3 4 5 7 8
11 13 15 17 191612
K
H
E
C
B
A
J
D
8 8
3 3
3 3
7 7
11 11 11 11
OFFICE
CORRIDOR
C7A14
OFFICE
OFFICE
SUPPLY
7102A
SUPPLY
TOILET
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
TOILET
OFFICE
OFFICE
ORTHO WAITING
OFFICE
HAC
FAC
7A01
STORAGE
TOILET
7134A
TOILET
STR
7-4
TOILET
EC
EC
VP
7-30
ORTHO SUPPLY
SOILED UTILITY
EXAM
EXAM
7142 EXAM
EXAM
EXAM
CAST RM
STORAGE
7148A
STORAGE
EXAM
TOILET
7146A
FAC
7A02
EC
VP
7-33
EC
OFFICE
7110A
OFFICE
7110C
OFFICE
CORRIDOR
C7A13
CORRIDOR
C7A12
CORRIDOR
C7A11
CORRIDOR
C7A11A
CORRIDOR
C7A08
HALLWAY
A0733
CORRIDOR
C7A07
TOILET
7119A
TOILET
7117A
TOILET
7115A
TOILET
7107A OFFICE
OFFICE
OFFICE
EXAM
EXAM
TOILET
7215A
TOILET
7207A
WAITING
EXAM
TOILET
7150A
TOILET
7252A
OFFICE
STORAGE
7250A
STORAGE
LAB
7246 BREAK
WOUND STAFF
7240C
RESTROOM
WAITING
MED RM
7210A
OFFICE
OFFICE
WAITING
CONTROL
7150B
WOUND
7240B
PROCTO
7240A
TOILET
CORRIDOR
C7A04A
CORRIDOR
C7A01
CORRIDOR
C7A05
CIRRIDOR
C7A04
HAC
VP
7-29
TOILET
TOILET
CORRIDOR
C7B02
STORAGE
OFFICE
EXAM
ELEV
7-A-5
ELEV
7-A-6
ELEV
7-A-8
ELEV
7-A-7
OFFICE
OFFICE
OFFICE
EXAM
EXAM
EXAM
DIRTY UTILITY
ENT OFFICE
OFFICE
OFFICE
EXAM
ENT SUPPLY
7306A
HALLWAY
C7B10
CORRIDOR
C7B10A
STR
7-1
ELEV
7-B-12
ELEV
7-B-9
TC
EC
ELEV
7-B-10
ELEV
7-B-11
ELEV LOBBY
C7B05
CORRIDOR
C7B04
CORRIDOR
C7B03B
TRASH RM
OFFICE
OFFICE
CORRIDOR
C7A06
CORRIDOR
C7B01
B
C
PROJECT AREA A
A. CONTRACTOR TO NOTE THAT THE INTENT OF DEMOLITION IS TO REMOVE
EXISTING ELEMENTS IN THEIR ENTIRETY TO ACCOMMODATE NEW
CONSTRUCTION. ITEMS NOTED FOR DEMOLITION ARE FOR REFERENCE AND
DO NOT REPRESENT EVERY ITEM TO BE DEMOLISHED. CONTRACTOR TO
ENSURE ALL ITEMS LOCATED WITHIN SCOPE BOUNDARY NECESSARY FOR
INSTALLATION OF NEW CONSTRUCTION ARE REMOVED AND DISPOSED OF.
B. THE SIXTH FLOOR IS AN ACTIVE EMPLOYEE WORK AREA 6AM – 5PM M-F. THE
CONTRACTOR SHALL BE ALLOWED UNENCUMBERED ACCESS TO PORTIONS
OF THE SIXTH FLOOR TO COMPLETE MEPF DEMOLITION, RELOCATIONS AND
NEW WORK. THE CONTRACTOR SHALL PLAN FOR SEVEN (7) SUB-PHASES
FOR THIS WORK. FP DEMO, PLUMBING AND HVAC PERIMETER PIPING DEMO
SHALL BE COORDINATED. EACH PHASE SHALL HAVE ITS OWN PLASTIC
INFECTION CONTROL BARRIER WITH ZIP-WALLS AND NEGATIVE AIR
MACHINES. CEILING SHALL BE RETURNED TO NORMAL AT END OF THE WORK
DAY. OFF-SHIFT WORK IS ACCEPTABLE WITH COR PERMISSION. OUTAGES
SHALL BE OFF-SHIFT. EACH SUB-PHASE REQUIRES ITS OWN INFECTION
CONTROL WORKPLAN. AN OVERALL SUB-PHASING PLAN IS REQUIRED
DURING PRE-CONSTRUCTION SUBMITTAL PHASE TO COORDINATE ACCESS
TO SIXTH FLOOR SPACES AND MOVES BY VA PERSONNEL.
C. COORDINATE DEMOLITION WITH NEW CONSTRUCTION. ALL DEMOLITION AND
REPAIR NECESSARY TO COMPLETE NEW AND REMODEL CONSTRUCTION
SHALL BE PROVIDED. CONTRACTOR SHALL REMOVE EXISTING
IMPROVEMENTS WHETHER OR NOT SPECIFICALLY INDICATED ON THE
DRAWINGS TO FACILITATE THE COMPLETION OF ALL REQUIRED WORK.
CONTRACTOR SHALL VISIT THE SITE AND VERIFY ALL QUANTITIES AND
ITEMS REQUIRED TO BE REMOVED.
D. REFER TO ARCHITECTURAL SYMBOLS ON SHEET AE101 FOR DEMOLITION
SYSTEMS AND DRAWING NOMENCLATURE.
E. EXISTING STRUCTURE WITHIN THE PROJECT BOUNDARY SHALL REMAIN
UNLESS OTHERWISE NOTED.
F. SURFACES TO BE CUT AND CONDITIONS UNDER WHICH CUTTING IS TO BE
PREFORMED SHALL BE REVIEWED BY CONTRACTOR PRIOR TO CUTTING TO
VERIFY NO UNSAFE OR UNSATISFACTORY CONDITIONS EXIST. SUCH
CONDITIONS SHALL BE RECTIFIED BEFORE WORK MAY PROCEED.
G. EXTENTS OF DEMOLITION SHALL BE COORDINATED WITH ARCHITECTURAL
FLOOR PLAN SHEET AE101, ENGINEERING DRAWINGS, AND VENDOR
DRAWINGS.
H. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED
ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL SCOPE OF
WORK TO BE REMOVED OR TEMPORARILY REMOVED TO ACCOMMODATE
NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN
INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS
WORK.
I. CONTRACTORS SHALL REMOVE INDICATED DEMOLITION OF CONSTRUCTION
ASSEMBLIES IN THEIR ENTIRETY, UNLESS OTHER WISE NOTED, TO
ACCOMMODATE NEW CONSTRUCTION.
J. MAKE ALL DEMOLITION CLEAN AND COMPLETE IN A MANNER TO RECEIVE
NEW FINISHES. DEMOLITION SHOULD BE PERFORMED IN A MANNER SUCH
THAT THE CONTRACTOR CAN SEAMLESSLY PATCH NEW WORK TO BE
SMOOTH AND UNDETECTABLE.
K. ABOVE CEILING WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES
SHALL BE REMOVED AND STORED IN A SAFE MANOR UNTIL CEILING TILES
CAN BE REINSTALLED. DAMAGED AND BROKEN CEILING TILES SHALL BE
REPLACED BY CONTRACTOR. GYPSUM BOARD CEILINGS SHALL BE PATCHED
AND PAINTED TO SEAMLESSLY MATCH EXISTING CEILING COLOR
FOLLOWING ABOVE CEILING DEMOLITION ACTIVITY. THIS SHALL INCLUDE
REPAIR TO THE CEILING GRID, SUSPENSION SYSTEM AND ALL ASSOCIATED
ASSEMBLIES AS WELL AS THE REPLACEMENT OF DAMAGED CEILING
PANELS, WITHIN AND BEYOND PROJECT LIMITS.
L. WHERE EXISTING FLOOR FINISH IS REMOVED, FLOORING AND ADHESIVE
SHALL BE REMOVED TO PROVIDE A CLEAN FLOOR SLAB. FLOOR SLAB SHALL
BE FILLED/ LEVELED TO PROVIDE A LEVEL FINISH PER NEW FLOORING
MANUFACTURER'S RECOMMENDATIONS. REFER TO SPECIFICATION 09 05 16.
M. COORDINATE SCOPE OF FLOORING REMOVAL WITH HAZMAT PLAN SHEET
HA101.
N. WALLS SHALL BE REMOVED THROUGHOUT PROJECT BOUNDARY UNLESS
OTHERWISE INDICATED.
O. COLUMN WRAPS SHALL BE REMOVED FROM EXISTING COLUMNS
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE INDICATED.
REMOVE ALL PLASTER, LATH, LAMINATIONS TO BARE CONCRETE AT LEAST
TO 8'-6' AFF.
P. FLOORING AND WALL BASE SHALL BE REMOVED THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE INDICATED.
Q. REMOVE WALL MOUNTED ACCESSORIES AND MOUNTING HARDWARE
THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE NOTED.
R. COORDINATE REMOVAL OF OXYGEN, VACUUM, NURSE CALL AND SPECIAL
ELECTRICAL ITEM WITH ENGINEERING DRAWINGS.
S. REMOVED DOORS, FRAMES AND HARDWARE THROUGHOUT PROJECT
BOUNDARY UNLESS OTHERWISE NOTED.
T. REMOVE EXISTING WALL PROTECTION, CORNER GUARDS, HANDRAILS AND/
OR GUARDRAILS THROUGHOUT PROJECT BOUNDARY UNLESS OTHERWISE
NOTED.
U. REMOVE EXISTING FURING PARTITIONS AT EXTERIOR WALLS THROUGHOUT
PROJECT BOUNDARY UNLESS OTHERWISE INDICATED.
V. REMOVE ALL FAN COIL UNITS AND WINDOW SILLS AT EXTERIOR WINDOWS.
REFER TO ENGINEERING DRAWINGS FOR FCU REMOVAL.
W. DEMOLITION AT COLUMNS SHALL INCLUDE PLATER, LATHE, AND
LAMINATIONS. REMOVE TO BARE CONCRETE AT LEAST 8'-6" AFF.
DEMOLITION GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/5
/2
:2
:1
P M
AD101
SEVENTH FLOOR DEMOLITION
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
414.778.1700
RENOVATE AND EXPAND
DIALYSIS CLINIC
5000 W National Ave, Milwaukee, WI 53295
695-19-131
03/26/2020
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AD101
2 SEVENTH FLOOR DEMO PLAN
N
SCALE: 1" = 100'-0"
KEY PLAN
Revisions: Date:
ADDENDUM 02 06/05/2020