S06 Att Amend 0002 22 11 00 - FACILITY WATER DISTRIBUTION.pdf
PDF 48 KB Posted
- Solicitation number
- 36C25220B0021
About this file
This document includes a federal construction solicitation and technical specifications for a plumbing project. The solicitation is for a renovation and expansion of the dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project number is 695-19-131 and involves demolishing an existing vacant ward to construct a new 11,000 square foot dialysis clinic, including trades such as electrical, plumbing, mechanical, and architectural work. Hazardous materials abatement is required. The technical specifications cover domestic water, sanitary, and medical gas systems and include material and testing requirements. The solicitation is scheduled for posting to FedBizOpps on May 13, 2020 with a bid opening on June 16, 2020. The period of performance is 540 days. As a 100% Service Disabled Veteran Owned Small Business set-aside, the awarded contractor must be verified in the Vendor Information Pages database. The project price range is $2-5 million under NAICS 236220.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Milwaukee VAMC 09-01-15
695-19-131 Renovate & Expand Dialysis Clinic 100% Construction Documents
Milwaukee, WI 53295 March 26, 2020
22 11 00 - 1
SECTION 22 11 00
FACILITY WATER DISTRIBUTION
PART 1 - GENERAL
1.1 DESCRIPTION
A. Domestic water systems, including piping, equipment and all necessary accessories as designated in this section.
B. A complete listing of all acronyms and abbreviations are included in
Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
D. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
E. Section 07 84 00, FIRESTOPPING.
F. Section 07 92 00, JOINT SEALANTS.
G. Section 09 91 00, PAINTING.
H. Section 22 05 11, COMMON WORK RESULTS FOR PLUMBING.
I. Section 22 07 11, PLUMBING INSULATION.
J. SECTION 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. American Society of Mechanical Engineers (ASME):
A13.1-2007 (R2013)......Scheme for Identification of Piping Systems
B16.15-2013 ............Cast Copper Alloy Threaded Fittings: Classes
125 and 250
B16.18-2012.............Cast Copper Alloy Solder Joint Pressure
Fittings
B16.22-2013.............Wrought Copper and Copper Alloy Solder-Joint
Pressure Fittings
B16.24-2011.............Cast Copper Alloy Pipe Flanges and Flanged
Fittings: Classes 150, 300, 600, 900, 1500, and
B16.51-2013.............Copper and Copper Alloy Press-Connect Fittings
ASME Boiler and Pressure Vessel Code -
BPVC Section IX-2015....Welding, Brazing, and Fusing Qualifications
22 11 00 - 2
C. American Society of Sanitary Engineers (ASSE):
1010-2004...............Performance Requirements for Water Hammer
Arresters
D. American Society for Testing and Materials (ASTM):
B32-2008 (R2014)........Standard Specification for Solder Metal
B43-2014................Standard Specification for Seamless Red Brass
Pipe, Standard Sizes
B61-2008 (R2013)........Standard Specification for Steam or Valve
Bronze Castings
B62-2009................Standard Specification for Composition Bronze or Ounce Metal Castings
B75/B75M-2011...........Standard Specification for Seamless Copper Tube
B88-2014................Standard Specification for Seamless Copper
Water Tube
B584-2014...............Standard Specification for Copper Alloy Sand
Castings for General Applications
B687-1999 (R2011).......Standard Specification for Brass, Copper, and
Chromium-Plated Pipe Nipples
C919-2012...............Standard Practice for Use of Sealants in
Acoustical Applications
D1785-2012..............Standard Specification for Poly (Vinyl
Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120
D2000-2012..............Standard Classification System for Rubber
Products in Automotive Applications
D2564-2012..............Standard Specification for Solvent Cements for
Poly (Vinyl Chloride) (PVC) Plastic Piping
Systems
D2657-2007..............Standard Practice for Heat Fusion Joining of
Polyolefin Pipe and Fittings
D2855-1996 (R2010)......Standard Practice for Making Solvent-Cemented
Joints with Poly (Vinyl Chloride) (PVC) Pipe and Fittings
D4101-2014..............Standard Specification for Polypropylene
Injection and Extrusion Materials
E1120-2008..............Standard Specification for Liquid Chlorine
E1229-2008..............Standard Specification for Calcium Hypochlorite
22 11 00 - 3
F2389-2010..............Standard Specification for Pressure-rated
Polypropylene (PP) Piping Systems
F2620-2013..............Standard Practice for Heat Fusion Joining of
Polyethylene Pipe and Fittings
F2769-2014..............Standard Specification for Polyethylene of
Raised Temperature (PE-RT) Plastic Hot and
Cold-Water Tubing and Distribution Systems
E. American Water Works Association (AWWA):
C651-2014...............Disinfecting Water Mains
F. American Welding Society (AWS):
A5.8M/A5.8-2011-AMD1....Specification for Filler Metals for Brazing and
Braze Welding
G. International Code Council (ICC):
IPC-2012................International Plumbing Code
H. Manufacturers Specification Society (MSS):
SP-58-2009..............Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application, and
Installation
SP-72-2010a.............Ball Valves with Flanged or Butt-Welding Ends for General Service
SP-110-2010.............Ball Valves Threaded, Socket-Welding, Solder
Joint, Grooved and Flared Ends
I. NSF International (NSF):
14-2015.................Plastics Piping System Components and Related
Materials
61-2014a................Drinking Water System Components – Health
Effects
372-2011................Drinking Water System Components – Lead Content
J. Plumbing and Drainage Institute (PDI):
PDI-WH 201-2010.........Water Hammer Arrestors
K. Department of Veterans Affairs:
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND
SAMPLES.
22 11 00 - 4
B. Information and material submitted under this section shall be marked
“SUBMITTED UNDER SECTION 22 11 00, FACILITY WATER DISTRIBUTIONS”, with applicable paragraph identification.
C. Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity.
1. All items listed in Part 2 - Products.
D. Complete operating and maintenance manuals including wiring diagrams, technical data sheets and information for ordering replacement parts:
1. Include complete list indicating all components of the systems.
2. Include complete diagrams of the internal wiring for each item of equipment.
3. Diagrams shall have their terminals identified to facilitate installation, operation and maintenance.
E. Completed System Readiness Checklist provided by the CxA and completed by the Contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22
08 00, COMMISSIONING OF PLUMBING SYSTEMS.
F. Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING
SYSTEMS.
1.5 QUALITY ASSURANCE
A. A certificate shall be submitted prior to welding of steel piping showing the Welder’s certification. The certificate shall be current and no more than one year old. Welder’s qualifications shall be in accordance with ASME BPVC Section IX.
B. All grooved joint couplings, fittings, valves, and specialties shall be the products of a single manufacturer. Grooving tools shall be by the same manufacturer as the groove components.
C. All pipe, couplings, fittings, and specialties shall bear the identification of the manufacturer and any markings required by the applicable referenced standards.
D. Bio-Based Materials: For products designated by the USDA’s Bio-
Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more
22 11 00 - 5 information regarding the product categories covered by the Bio-
Preferred Program, visit http://www.biopreferred.gov.
1.6 SPARE PARTS
A. For mechanical press-connect fittings, provide tools required for each pipe size used at the facility.
1.7 AS-BUILT DOCUMENTATION
A. Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.
B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions shall be in electronic version on compact disc or DVD inserted into a three ring binder. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations. Notes on all special systems or devices shall be included. A list of recommended spare parts (manufacturer, model number, and quantity) shall be furnished. Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the As-Built documentation.
C. The installing contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them in Auto-CAD version 2018 provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.
D. Certification documentation shall be provided to COR 10 working days prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and certificate if applicable that all results of tests were within limits specified. If a certificate is not available, all documentation shall be on the Certifier’s letterhead.
22 11 00 - 6
PART 2 - PRODUCTS
2.1 MATERIALS
A. Material or equipment containing a weighted average of greater than
0.25 percent lead are prohibited in any potable water system intended for human consumption, and shall be certified in accordance with NSF 61 or NSF 372. Endpoint devices used to dispense water for drinking shall meet the requirements of NSF 61, Section 9.
B. Plastic pipe, fittings, and solvent cement shall meet NSF 14 and shall be NSF listed for the service intended.
2.3 ABOVE GROUND (INTERIOR) WATER PIPING
A. Pipe: Copper tube, ASTM B88, Type L, drawn.
B. Fittings for Copper Tube:
1. Wrought copper or bronze castings conforming to ASME B16.18 and
B16.22. Unions shall be bronze, MSS SP-72, MSS SP-110, solder or braze joints. Use 95/5 tin and antimony for all soldered joints.
2. Grooved fittings, 2 to 6 inch wrought copper ASTM B75/B75M C12200, 5 to 6 inch bronze casting ASTM B584, C84400. Mechanical grooved couplings, 300 psig minimum ductile iron, ASTM A536 Grade 448-310-12
(Grade 65-45-12), or malleable iron, ASTM A47/A47M Grade 22410
(Grade 32510) housing, with EPDM gasket, steel track head bolts, ASTM A183, coated with copper colored alkyd enamel.
3. Mechanical press-connect fittings for copper pipe and tube shall conform to the material and sizing requirements of ASME B16.51, NSF
61 approved, 2 inch size and smaller mechanical press-connect fittings, double pressed type, with EPDM (ethylene propylene diene monomer) non-toxic synthetic rubber sealing elements and un-pressed fitting identification feature.
4. Mechanically formed tee connection: Form mechanically extracted collars in a continuous operation by drilling pilot hole and drawing out tube surface to form collar, having a height of not less than three times the thickness of tube wall. Adjustable collaring device shall ensure proper tolerance and complete uniformity of the joint.
Notch and dimple joining branch tube in a single process to provide free flow where the branch tube penetrates the fitting. Braze joints.
5. Flanged fittings, bronze, class 150, solder-joint ends conforming to
ASME B16.24.
22 11 00 - 7
C. Adapters: Provide adapters for joining pipe or tubing with dissimilar end connections.
D. Solder: ASTM B32 alloy type Sb5, HA or HB. Provide non-corrosive flux.
E. Brazing alloy: AWS A5.8M/A5.8, brazing filler metals shall be BCuP series for copper to copper joints and BAg series for copper to steel joints.
F. Dialysis Water Piping:
1. Acid Tubing:
a. polypropylene tubing with ASTM# D335
2. Reverse Osmosis (RO) Water Piping:
a. ASTM D1785, Schedule 80 PVC, piping with sweeping 45 degree ells
(no 90 degree ells).
2.4 EXPOSED WATER PIPING
A. Finished Room: Use full iron pipe size chrome plated brass piping for exposed water piping connecting fixtures, casework, cabinets, equipment and reagent racks when not concealed by apron including those furnished by the Government or specified in other sections.
1. Pipe: ASTM B43, standard weight.
2. Fittings: ASME B16.15 cast bronze threaded fittings with chrome finish.
3. Nipples: ASTM B687, Chromium-plated.
4. Unions: MSS SP-72, MSS SP-110, brass or bronze with chrome finish.
Unions 2-1/2 inches and larger shall be flange type with approved gaskets.
B. Unfinished Rooms, Mechanical Rooms and Kitchens: Chrome-plated brass piping is not required. Paint piping systems as specified in Section 09
91 00, PAINTING.
2.7 STRAINERS
A. Provide on high pressure side of pressure reducing valves, on suction side of pumps, on inlet side of indicating and control instruments and equipment subject to sediment damage and where shown on drawings.
Strainer element shall be removable without disconnection of piping.
B. Water: Basket or "Y" type with easily removable cover and brass strainer basket.
C. Body: Less than 3 inches, brass or bronze; 3 inches and greater, cast iron or semi-steel.
22 11 00 - 8
2.8 DIELECTRIC FITTINGS
A. Provide dielectric couplings or unions between pipe of dissimilar metals.
2.9 STERILIZATION CHEMICALS
A. Hypochlorite: ASTM E1120.
B. Liquid Chlorine: ASTM E1229.
2.10 WATER HAMMER ARRESTER
A. Closed copper tube chamber with permanently sealed 60 psig air charge above a Double O-ring piston. Two high heat Buna-N 0-rings pressure packed and lubricated with FDA approved silicone compound. All units shall be designed in accordance with ASSE 1010. Access shall be provided where devices are concealed within partitions or above ceilings. Size and install in accordance with PDI-WH 201 requirements.
Provide water hammer arrestors at:
1. All solenoid valves.
2. All groups of two or more flush valves.
3. All quick opening or closing valves.
4. All medical washing equipment.
PART 3 - EXECUTION
3.1 INSTALLATION
A. General: Comply with the International Plumbing Code and the following:
1. Install branch piping for water from the piping system and connect to all fixtures, valves, cocks, outlets, casework, cabinets and equipment, including those furnished by the Government or specified in other sections.
2. Pipe shall be round and straight. Cutting shall be done with proper tools. Pipe, except for plastic and glass, shall be reamed to remove burrs and a clean smooth finish restored to full pipe inside diameter.
3. All pipe runs shall be laid out to avoid interference with other work/trades.
4. Install union and shut-off valve on pressure piping at connections to equipment.
5. Pipe Hangers, Supports and Accessories:
a. All piping shall be supported per the IPC, H-18-8 Seismic Design
Handbook, MSS SP-58, and SMACNA as required.
22 11 00 - 9
b. Shop Painting and Plating: Hangers, supports, rods, inserts and accessories used for pipe supports shall be shop coated with zinc chromate primer paint. Electroplated copper hanger rods, hangers and accessories may be used with copper tubing.
c. Floor, Wall and Ceiling Plates, Supports, Hangers:
1) Solid or split un-plated cast iron.
2) All plates shall be provided with set screws.
3) Pipe Hangers: Height adjustable clevis type.
4) Adjustable Floor Rests and Base Flanges: Steel.
5) Concrete Inserts: "Universal" or continuous slotted type.
6) Hanger Rods: Mild, low carbon steel, fully threaded or
Threaded at each end with two removable nuts at each end for positioning rod and hanger and locking each in place.
7) Pipe Hangers and Riser Clamps: Malleable iron or carbon steel.
Pipe Hangers and riser clamps shall have a copper finish when supporting bare copper pipe or tubing.
8) Rollers: Cast iron.
9) Self-drilling type expansion shields shall be "Phillips" type, with case hardened steel expander plugs.
10) Hangers and supports utilized with insulated pipe and tubing shall have 180 degree (minimum) metal protection shield centered on and welded to the hanger and support. The shield thickness and length shall be engineered and sized for distribution of loads to preclude crushing of insulation without breaking the vapor barrier. The shield shall be sized for the insulation and have flared edges to protect vapor-retardant jacket facing. To prevent the shield from sliding out of the clevis hanger during pipe movement, center-ribbed shields shall be used.
11) Miscellaneous Materials: As specified, required, directed or as noted on the drawings for proper installation of hangers, supports and accessories.
12) With the installation of each flexible expansion joint, provide piping restraints for the upstream and downstream section of the piping at the flexible expansion joint. Provide calculations supporting the restraint length design and type of selected restraints. Restraint calculations shall be based
22 11 00 - 10 on the criteria from the manufacturer regarding their restraint design.
6. Install chrome plated cast brass escutcheon with set screw at each wall, floor and ceiling penetration in exposed finished locations and within cabinets and millwork.
7. Penetrations:
a. Firestopping: Where pipes pass through fire partitions, fire walls, smoke partitions, or floors, install a fire stop that provides an effective barrier against the spread of fire, smoke, and gases as specified in Section 07 84 00, FIRESTOPPING.
Completely fill and seal clearances between raceways and openings with the firestopping materials.
b. Waterproofing: At floor penetrations, completely seal clearances around the pipe and make watertight with sealant as specified in
Section 07 92 00, JOINT SEALANTS. Bio-based materials shall be utilized when possible.
c. Acoustical sealant: Where pipes pass through sound rated walls, seal around the pipe penetration with an acoustical sealant that is compliant with ASTM C919.
8. Mechanical press-connect fitting connections shall be made in accordance with the manufacturer’s installation instructions. The tubing shall be fully inserted into the fitting and the tubing marked at the shoulder of the fitting. The fitting alignment shall be checked against the mark on the tubing to assure the tubing is fully engaged (inserted) in the fitting. Ensure the tube is completely inserted to the fitting stop (appropriate depth) and squared with the fitting prior to applying the pressing jaws onto the fitting. The joints shall be pressed using the tool(s) approved by the manufacturer. Minimum distance between fittings shall be in accordance with the manufacturer’s requirements. When the pressing cycle is complete, visually inspect the joint to ensure the tube has remained fully inserted, as evidenced by the visible insertion mark.
B. Domestic Water piping shall conform to the following:
1. Grade all lines to facilitate drainage. Provide drain valves at bottom of risers and all low points in system. Design domestic hot water circulating lines with no traps.
22 11 00 - 11
2. Connect branch lines at bottom of main serving fixtures below and pitch down so that main may be drained through fixture. Connect branch lines to top of main serving only fixtures located on floor above.
3.2 TESTS
A. General: Test system either in its entirety or in sections. Submit testing plan to COR 10 working days prior to test date.
B. Potable Water System: Test after installation of piping and domestic water heaters, but before piping is concealed, before covering is applied, and before plumbing fixtures are connected. Fill systems with water and maintain hydrostatic pressure of 150 psig gage for two hours.
No decrease in pressure is allowed. Provide a pressure gage with a shutoff and bleeder valve at the highest point of the piping being tested. Pressure gauge shall have 1 psig increments.
C. Re-agent Grade Water Systems: Fill system with water and maintain hydrostatic pressure of 200 psig gage during inspection and prove tight.
D. All Other Piping Tests: Test new installed piping under 1-1/2 times actual operating conditions and prove tight.
E. The test pressure shall hold for the minimum time duration required by the applicable plumbing code or authority having jurisdiction.
3.3 STERILIZATION
A. After tests have been successfully completed, thoroughly flush and sterilize the interior domestic water distribution system in accordance with AWWA C651.
B. Use liquid chlorine or hypochlorite for sterilization.
3.4 COMMISSIONING
A. Provide commissioning documentation in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
B. Components provided under this section of the specification will be tested as part of a larger system.
3.5 DEMONSTRATION AND TRAINING
A. Provide services of manufacturer’s technical representative for four hours to instruct VA Personnel in operation and maintenance of the system.
22 11 00 - 12
B. Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING
SYSTEMS.
- - - E N D - - -