S06 Att Amend 0002 AI901 - SIGNAGE PLAN.pdf
PDF 537 KB Posted
- Solicitation number
- 36C25220B0021
About this file
This solicitation notice is for a construction project to renovate and expand the dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contractor shall provide all labor, materials, equipment and services to demolish ward 7AS of building 111 and reconstruct it as the new 11,000 square foot dialysis clinic, relocating it from the 5th floor. Scope of work includes demolition, concrete, electrical, plumbing, mechanical, technical systems, patient ceiling lifts, pneumatic tube, architectural components and specialty furnishings. Hazardous materials abatement for asbestos is also required. The project value is estimated between $2-5 million. The solicitation will be posted to FedBizOpps on May 13, 2020 with bid opening on June 16, 2020. A pre-bid conference will be held. This is a 100% set-aside for Service Disabled Veteran Owned Small Businesses. The period of performance is 540 calendar days from notice to proceed.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
SIGNAGE GENERAL NOTES
A. THE SIGNAGE VENDOR SHALL PROVIDE SHOP DRAWINGS FOR ALL NEW
SIGNS TO BE REVIEWED AND APPROVED BY THE VA PRIOR TO FABRICATION.
B. ALL SIGNAGE INDICATED IS A BASIS OF DESIGN. ALL CONTENT,
MODIFICATIONS, AND VERBIAGE ARE TO BE DETERMINED BY THE VA PRIOR
TO FABRICATION.
C. WHEN EXISTING SIGNAGE IS REMOVED CONTRACTOR SHALL REPAIR ANY
DAMAGE TO SUBSTRATE AND MATCH FINISHES PRIOR TO THE INSTALLATION
OF NEW SIGNAGE.
D. CONTRACTOR SHALL REMOVE EXISTING SIGNAGE AND TURN OVER TO VA.
SALVAGED SIGNAGE WILL NOT BE RE-INSTALLED.
E. CONTRACTOR TO COORDINATE ALL SIGNAGE COPY AND LOCATIONS WITH
COR PRIOR TO FABRICATION.
1 2 6
9 10
3 4 5 7 8
11 13 15 17 191612
K
H
E
C
B
A
J
D
MECHANICAL
ELEC
ELEC
ELEC
HAC
ELEC
ELEC
STAIR
7-1
STAIR
7-4
FEC
7A01
OFFICE
OFFICE
STERILE SUPPLY
OFFICE
OFFICE
OFFICE
PATIENT TLT
ISOLATION ROOM
SEPARATION ROOM
PATIENT TLT
7135A
PATIENT TLT
7136A
WATER TREATMENT
SHARED OFFICE
BREAK ROOM
EQUIPMENT
STORAGE
SOILED UTILITY
WAITING ROOM
OFFICE
URINALYSIS LAB
EXAM
TRAINING /
CONSULT
PUBLIC TLT
MEDS
WORK ROOM
STAFF TLT
RECEPTION
PATIENT TLT
7134A
ALCOVE
NURSE
WORKSTATION
CORRIDOR
C7A14
CORRIDOR
C7A12
CORRIDOR
C7A11
BAY
7106-5
BAY
7106-4
BAY
7106-3
BAY
7106-2
BAY
7106-1
BAY
7110-6
BAY
7110-7
BAY
7110-8
BAY
7114-10
BAY
7114-9
CORRIDOR
C7A10A
MSA
OFFICE
OFFICE
EXAM
EXAM
TOILET
7215A
TOILET
7207A
WAITING
TOILET
7252A
OFFICE
STORAGE
7250A
STORAGE
LAB
7246 BREAK
WOUND STAFF
7240C
RESTROOM
WAITING
MED RM
7210A
OFFICE
OFFICE
WAITING
WOUND
7240B
PROCTO
7240A
TOILET
CORRIDOR
C7A04A
CORRIDOR
C7A01
CORRIDOR
C7A05
CIRRIDOR
C7A04
HAC
VP
7-29
TOILET
TOILET
CORRIDOR
C7B02
STORAGE
OFFICE
EXAM
ELEV
7-A-5
ELEV
7-A-6
ELEV
7-A-8
ELEV
7-A-7
OFFICE
OFFICE
OFFICE
EXAM
EXAM
EXAM
DIRTY UTILITY
ENT OFFICE
OFFICE
OFFICE
EXAM
ENT SUPPLY
7306A
HALLWAY
C7B10
CORRIDOR
C7B10A
ELEV
7-B-12
ELEV
7-B-9
ELEC
ELEC
ELEV
7-B-10
ELEV
7-B-11
ELEV LOBBY
C7B05
CORRIDOR
C7B04
CORRIDOR
C7B03B
TRASH RM
OFFICE
OFFICE
OFFICE
EXAM
CORRIDOR
C7A12B
INTAKE
NURSE STATION
CORRIDOR
C7A10
SEPARATION ROOM
CORRIDOR
C7A08
DIALYSIS & BIO MED
TECH
LV-1
LV-2 LV-2
LV-1
LINEN
CORRIDOR
C7A13
CLOSET
A11.G
A9
A9
A5.G
A2
A5.GA5.GA5.GA5.GA5.G
A11.G
A1
A4.G
A4.G
A1A1
A4.G A4.G A4.G
E9.G
A5.G
A4.G
A9
A4.G
A6.G
A2
A2
A6.G
A4.G A6.G A6.G
A8.G
A6.G
A11.G
A4.G A5.G
G6
A6.G
A11.G
E9.G
A4.G
E1.G
F3
A4.G
A6.G
F8
A1
A2 B1.G
B2 & F7
B4
B3
A1
A4.G
A4.G
G8
G8G8G8G8 G8
C5.GC5.G
A4.G
C6.G
E2.G
E8
E8
E5.G
E5.GE5.G
ADDITIONAL MISC. SIGNAGE
(4) FIRE EXTINGUISHER LOCATION E11 GOLD LOCATION TBD
SMALL SIGN DIRECTORY C1.G GOLD TEXT TBD (3 LINES)
MEDIUM SIGN DIRECTORY C2.G GOLD TEXT TBD (5 LINES)
(2) CEILING DIRECTION SIGN E4.G GOLD TEXT TBD (2 LINES) LOCATION TBD
(2) AUTHORIZED ACCESS SIGN E8 "STAFF ONLY BEYOND THIS POINT"
CODE CART CEILING SIGN E12 STANDARD SIGN
AED FLAG MOUNT SIGN E15 LOCATION TBD
NO OPEN FLAMES SIGN F2 LOCATION TBD
BIOHAZARD SIGN F3 LOCATION TBD
(2) SIGN FRAME G1 LOCATION TBD
FOR SERVICE SIGN G3 "FOR SERVICE PLEASE USE PHONE"
(2) SIGN FRAME G7 LOCATION TBD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/5
/2
:2
:2
P M
AI901
SIGNAGE PLAN
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
414.778.1700
RENOVATE AND EXPAND
DIALYSIS CLINIC
5000 W National Ave, Milwaukee, WI 53295
695-19-131
03/26/2020
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"AI901
2 SEVENTH FLOOR PLAN
Revisions: Date:
ADDENDUM 02 06/05/2020
SIGNAGE SCHEDULE
ROOM NUMBER SIGN COPY SIGN TYPE
SIGN ACCENT
COLOR SIGNAGE REMARKS
7-4 STAIR B1.G, B2, B3, B4, F7 GOLD
7100 WAITING ROOM / DIALYSIS 7100-59 / WAITING ROOM /
FOR PATIENT PRIVACY, PLEASE WAIT HERE UNTIL
CALLED TO CHECK IN / DIALYSIS
A4.G, A11.G, G6, E2.G GOLD A11.G - INTALL OUTSIDE MAIN ENTRANCE
DOOR IN C7A14 / G6 - THIS IS THE PRIVACY
STAND SIGN FOR THE RECEPTION DECK /
E2.6 - CEILING SIGN BY MAIN ENTRANCE OF
DIALYSIS
7101 UNISEX PUBLIC TOILET A9, E9.G GOLD A9 - WITH HANDICAP SYMBOL. "PUBLIC
RESTROOM ON LINES 3 & 4 / E9.G - THIS IS
THE FLAG MOUNT RESTROOM SIGN
7102 DIALYSIS CONSULT ROOM A8.G GOLD WITH IN-USE SLIDER
7103 DIIALYSIS EXAM ROOM A8.G GOLD WITH IN-USE SLIDER
7104 RECEPTION A6.G GOLD "STAFF ONLY" ON LINE 4
7105 INTAKE A4.G GOLD
7106-1 BAY 1 E5.G GOLD BAY 1 (BOTH SIDES). FINAL LOCATION BY VA
7106-2 BAY 2 E5.G GOLD BAY 2 (BOTH SIDES), FINAL LOCATION BY VA
7106-3 BAY 3 E5.G GOLD BAY 3 (BOTH SIDES), FINAL LOCATION BY VA
7106-4 BAY 4 E5.G GOLD BAY 4 (BOTH SIDES), FINAL LOCATION BY VA
7106-5 BAY 5 E5.G GOLD BAY 5 (BOTH SIDES), FINAL LOCATION BY VA
7110-6 BAY 6 E5.G GOLD BAY 6 (BOTH SIDES), FINAL LOCATION BY VA
7110-7 BAY 7 E5.G GOLD BAY 7 (BOTH SIDES), FINAL LOCATION BY VA
7110-8 BAY 8 E5.G GOLD BAY 8 (BOTH SIDES), FINAL LOCATION BY VA
7113 NURSE STATION E1.G GOLD TEXT TO BE DETERMINED
7114-9 BAY 9 E5.G GOLD BAY 9 (BOTH SIDES), FINAL LOCATION BY VA
7114-10 BAY 10 E5.G GOLD BAY 10 (BOTH SIDES), FINAL LOCATION BY VA
7116 STORAGE A6.G GOLD "STAFF ONLY" ON LINE 4. THIS IS THE MEDS
ROOM
7117 DIALYSIS AND BIOMED TECH ROOM A6.G GOLD "STAFF ONLY" ON LINE 4
7119 EQUIPMENT STORAGE A4.G GOLD
7120 ELEC A2 7120 EC
7121 SOILED UTILITY A6.G, F3 A6.G - GOLD A6.G - "STAFF ONLY" ON LINE 4 / F3 - THIS
ROOM REQUIRES A BIOHAZARD SIGN
7122 WHEELCHAIR STORAGE A4.G GOLD THIS IS THE ALCOVE AREA BY SOILED
UTILITY
7123 LINEN CLOSET A6.G GOLD "STAFF ONLY" ON LINE 4
7124 STERILE SUPPLY A6.G, F8 A6.G - GOLD A6.G - "STAFF ONLY" ON LINE 4 / ADD
OXYGEN SIGN TOD OOR IF IT IS GOING TO BE
STORED IN 7124
7125 STAFF BREAK ROOM A4.G GOLD
7126 ELEC A2 7126 EC
7128 ELEC A1 7128
7129 STAFF RESTROOM A9 GOLD WITH HANDICAP SYMBOL. "STAFF
RESTROOM" ON LINES 3 & 4
7130 STAFF WORK ROOM A4.G GOLD
7131 SHARED STAFF OFFICE A5.G GOLD NAMES TBD FOR LINE 4
7132 HOUSEKEEPING CLOSET A2 7132 HAC
7133 UNISEX RESTROOM A9, E9.G GOLD
7134 SEPARATION ROOM 1 A4.G GOLD
7134A PATIENT RESTROOM A1 ROOM NUMBER ONLY
7135 SEPARATION ROOM 2 A4.G GOLD
7135A PATIENT RESTROOM A1 ROOM NUMBER ONLY
7136 ISOLATION ROOM A4.G GOLD
7136A PATIENT RESTROOM A1
7137 NURSE WORK AREA A4.G GOLD
7139 WATER TREATMENT A4.G GOLD
7140 MER A4.G GOLD NEEDS MER NUMBER - TEXT TBD
7150 NEPHROLOGY OFFICE / MSA OFFICE / NEPHROLOGY A11.G, C5.G, A4.G, E2.G GOLD A11.G - ROOM NUMBER RANGE "7150 - 59" /
CG.G - EXIT TO ELEVATOR WITH LEFT
ARROW / A4.G - THIS WILL GO IN THE STAFF
OFFICE CORRIDOR, LOCATION TBD / A2.G -
CEILING SIGN BY ENTRANCE DOOR TO
NEPHROLOGY
7151 ELEC A2 7151 EC
7152 URINALYSIS LAB A6.G GOLD "STAFF ONLY" ON LINE 4
7153 OFFICE A5.G, G8 GOLD A5.G - NAME TBD / G8 - INSTALL ON OFFICE
DOOR
7154 OFFICE A5.G, G8 GOLD A5.G - NAME TBD / G8 - INSTALL ON OFFICE
DOOR
7155 OFFICE A5.G, G8 GOLD A5.G - NAME TBD / G8 - INSTALL ON OFFICE
DOOR
7156 OFFICE A5.G, G8 GOLD A5.G - NAME TBD / G8 - INSTALL ON OFFICE
DOOR
7157 OFFICE A5.G, G8 GOLD A5.G - NAME TBD / G8 - INSTALL ON OFFICE
DOOR
7158 OFFICE A5.G, G8 GOLD A5.G - NAME TBD / G8 - INSTALL ON OFFICE
DOOR
7159 STORAGE A4.G GOLD STORAGE CLOSET
C7A08
C7A10
C7A10A
C7A11
C7A12
C7A12B
C7A13 CORRIDOR C5.G "EXIT TO ELEVATORS" WITH AN ARROW TO
THE RIGHT
C7A14 CORRIDOR C5.G, E2.G GOLD C5.G - "EXIT TO ELEVATORS" WITHA N
ARROW TO THE RIGHT, E2.G - DIALYSIS
File details come from the government source that posted it. Updated .