S06 Att Amend 0002 GC101 - INFECTION CONTROL_PHASING PLAN.pdf
PDF 491 KB Posted
- Solicitation number
- 36C25220B0021
About this file
This document provides details for a federal construction contract opportunity to renovate and expand a dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contract involves demolishing and reconstructing ward 7AS of building 111 to create a new 11,000 square foot dialysis clinic, including trades such as demolition, concrete, electrical, plumbing, mechanical, architectural work and specialty furnishings. Hazardous materials abatement is also required. The work will impact adjacent occupied and unoccupied areas. The solicitation is scheduled to post on May 13, 2020 with a bid opening of June 16, 2020. Pursuant to Public Law 109-461, this opportunity is set aside as a 100% Service Disabled Veteran Owned Small Business set-aside. Offerors must represent that they are an SDVOSB or VOSB at the time of submission, are a small business for the assigned NAICS code, and are verified on VetBiz.gov. The period of performance is 540 calendar days with a projected value of $2-5 million.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
UP
TEMPORARY WALLS. SEE PLAN AND PLAN NOTES
TEMPORARY CONSTRUCTION ACCESS DOORS
REFERENCE AREA FOR ABOVE CEILING
WORK ON FLOOR BELOW.
RE: ENGINEERING DRAWINGS FOR FULL
SCOPE OF WORK
BEYOND PROJECT BOUNDARY
PROJECT BOUNDARY
IC / PHASING LEGEND
EXISTING WALL TO BE VERIFIED OR
MODIFIED TO BE 1-HR RATED
CONTINUOUS FIRESAFE SEALANT
TOP AND BOTTOM, & BOTH SIDES
3 1/2" SOUND ATTENUATION BATT.
5/8" TYPE X GYPSUM BOARD, BOTH SIDES
3 5/8" METAL STUD @ 16" O.C. WITH
RUNNER CHANNELS ALONG TOP
AND BOTTOM
CONSTRUCTION
SIDE
PUBLIC
SIDE
6 MIL. FIRE RETARDANT VISQUEEN
MEMBRANE. CONTINUOUSLY ADHERE
TO THE STRUCTURAL DECK ABOVE AND
TO THE FLOOR BELOW WITH TAPE.
UNDERSIDE OF STRUCTURAL DECK
UL LISTING: U465
COORDINATE WITH EXISTING CEILING
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER.
TRIATEK MONITOR
SEAL ALL EDGES WITH TAPE. SEE
SPECIFICATIONS FOR MORE INFO.
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE FOR
REQUIRED CONDITION TO STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
LOCKSET TO ACCEPT VA SUPPLIED SFIC
CLOSER
NOTE: PROTECT EXISTING WALLS &
FLOORS FROM TEMP. CONSTRUCTION
BARRIER. EXISTING FINSIHES DAMAGED
BY TEMP. IC/CN BARRIER SHALL BE
REPAIRED BY CONTRACTOR.
PROVIDE CARD READER AT EXTERIOR ANTI-
ROOM DOOR ONLY.
CONSTRUCTION ACTIVITY - D
PATIENT RISK GROUP: MEDIUM
CLASS OF PRECAUTION MATRIX: IV
1. PROVIDE TEMPORARY 1 HR FIRE RATED WALL CONSTRUCTION PER NFPA
241. REFER TO DETAIL 1/GC101.
2. PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH
CARD READER ACCESS. REFER TO DETAIL 2/GC101
3. WORK WILL TAKE PLACE ABOVE CEILING IN CORRIDOR C7B01 OUTSIDE OF
SCOPE BOUNDARY. CEILING WILL BE DEMOLISHED. NEW CEILING AND LIGHT
FIXTURES WILL BE REQUIRED. INSTALL NEW CEILING AND LIGHTS TO MATCH
EXISTING LAYOUT. REFER TO MECHANICAL DRAWINGS FOR SCOPE OF
WORK TO BE PERFORMED ABOVE CEILING. PATCH AND REPAIR FINISHES IN
THE CORRIDOR AS REQUIRED. PROVIDE INFECTION CONTROL PLAN TO COR
FOR APPROVAL PRIOR TO BEGINNING WORK. ALL WORK OUTSIDE OF
PROJECT BOUNDARY TO BE DONE OFF-SHIFT.
4. PROVIDE TEMPORARY INFECTION CONTROL BARRIER AT EXISTING STAIR
DOOR. THIS DOOR TO BE USED FOR EMERGENCY EGRESS ONLY.
REFERENCE VA-ISSUED ILSM.
5. EXISTING PARTITION TO SERVE AS INFECTION CONTROL BARRIER. MODIFY
PARTITION CONSTRUCTION AS REQUIRED TO BRING WALL TO 1 HOUR WALL
CONSTRUCTION, UL RATING U465. REMOVE EXISTING DOOR AND INSTALL
NEW DOOR AND FRAME PER CONSTRUCTION DWGS. SEAL DOOR FROM ONE
SIDE TO SERVE AS A CONSTRUCTION AND INFECTION CONTROL BARRIER.
6. EXISTING PARTITION TO SERVE AS CONSTRUCTION AND INFECTION
CONTROL BARRIER. MODIFY PARTITION CONSTRUCTION AS REQUIRED TO
BRING WALL TO 1 HOUR WALL CONSTRUCTION, UL RATING U465. WHERE
APPLICABLE, REMOVE EXISTING DOOR, FRAME AND ASSOCIATED
HARDWARE. INFILL OPENING WITH REQUIRED CONSTRUCTION TO MAINTAIN
U465 CONSTRUCTION.
7. PROVIDE 2 HOUR FIRE RATED CONSTRUCTION AND INFECTION CONTROL
BARRIER AROUND EXISTING 2 HOUR SHAFT TO PROVIDE PROTECTION WHEN
EXISTING SHAFT IS OPENED FOR MECHANICAL AND PIPING CONNECTIONS.
PROVIDE 90 MINUTE RATED METAL DOOR ASSEMBLY AND FRAME WITH
SEALS, HARDWARE AND CLOSER. BUILD BARRIER WALL DURING THE HOURS
OF 5PM TO 5AM.
8. REMOVE EXISTING DOORS AND RETURN TO VA. PROVIDE A 1-HOUR
CONSTRUCTION BARRIER WALL IN CORRIDOR. ALL WORK TO BE DONE OFF-
HOURS.
9. TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION PER
NFPA 241 TO BECOME 1 HR RATED PARTITION FOR NEW CONSTRUCTION.
10. WORK WILL TAKE PLACE IN THIS CORRIDOR OUTSIDE OF SCOPE BOUNDARY.
WORK TO INCLUDE ABATEMENT AND DEMOLITION OF FLOORING AND WALL
GUARDS. PREPARE EXISTING WALLS FOR NEW FINISHES. A PORTION OF
THIS AREA WILL ALSO INVOLVE ABOVE CEILING WORK. PROVIDE INFECTION
CONTROL PLAN TO COR FOR APPROVAL PRIOR TO BEGINNING WORK. ALL
WORK OUTSIDE OF PROJECT BOUNDARY TO BE DONE OFF-SHIFT.
11. CONTRACTOR TO PROVIDE SCRUBBER IN ANTEROOM AREA.
A. REFER TO LIST OF REQUIRED INFECTION CONTROL PRECAUTIONS OUTLINED
BY CLASS IN SPECIFICATION 010110SN AND 01 35 26 FOR ADDITIONAL
INFORMATION.
B. REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE
FOR ADDITIONAL INFORMATION.
C. COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND
FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE
CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE
PROJECT BOUNDARY.
D. COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER
WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR
AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY
IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE
APPROXIMATE. CONTRACTOR SHALL PROVIDE INFECTION CONTROL
WORKPLAN AND DRAWING TO COR FOR APPROVAL BEFORE ANY DEMO.
E. SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR
AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE
PHASING INFORMATION FOR 6TH FLOOR ABOVE CEILING WORK IN THE
CONTRACTOR PROVIDED CMP SCHEDULE FOR WORK ALSO REQUIRED
ABOVE AND BELOW THE FLOOR PLATE OF THE PROJECT BOUNDARY.
F. SIXTH FLOOR ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE
HOURS OF 5:00 PM AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING
WORK WHERE CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED
AND STORED IN A SAFE MANOR UNTIL CEILING TILES CAN BE REINSTALLED.
DAMAGED AND BROKEN CEILING TILES SHALL BE REPLACED BY
CONTRACTOR.
G. EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED
DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF
OPERATION.
H. WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE BETWEEN
THE HOURS OF 5:00 PM AND 5:00 AM. EVERY EFFORT SHALL BE MADE TO
KEEP NOISE AND VIBRATION TO A MINIMUM.
I. PROVIDE A 24"X36" STICKY WALK OFF MAT AT EACH TEMPORARY DOOR
LOCATION. MAT SHALL BE REPLACED OR CLEANED AS NECESSARY
J. PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH
TEMPORARY DOOR LOCATION.
K. CONTRACTOR SHALL SUPPLY SPILL KIT. SPILL KIT TO INCLUDE SHOP VAC,
MULTI-PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE
LIQUIDS UP TO 30 GALLONS.
L. ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED
WITH 4 MIL. POLY SHEET.
M. ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT
BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED
ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSED
WITH A LID. REMOVE DEBRIS DAILY; BEFORE 7AM OR AFTER 4PM.
N. ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY
STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE
MATERIALS SHALL NOT BE STORED IN THE FACILITY.
O. PROVIDE CONTAINMENT CART (SHARK TANK) FOR ABOVE CEILING ACCESS
OUTSIDE PROJECT BOUNDARY.
P. CONTRACTOR SHALL PROVIDE INFECTION CONTROL PLAN TO VA FOR
REVIEW AND APPROVAL DURING PRECONSTRUCTION PHASE. CONTRACTOR
SHALL PROVIDE CALCULATIONS FOR NEGATIVE ARE MACHINES NEEDED
SHOWING QUANTITY REQUIRED AND LOCATIONS INSIDE 7AS. CONTRACTOR
SHALL PROVIDE CUTSHEET AND PRODUCT INFORMATION OF NEGATIVE AIR
MACHINE INTENDED WITH INFECTION CONTROL PLAN SUBMITTAL.
INFECTION CONTROL PLAN NOTES
INFECTION CONTROL GENERAL NOTES
INFECTION CONTROL PLAN NOTES
1 2 6
9 10
3 4 5 7 8
11 13 15 17 191612
K
H
E
C
B
A
J
D
OFFICE
CORRIDOR
C7A14
OFFICE
OFFICE
SUPPLY
7102A
SUPPLY
TOILET
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
TOILET
OFFICE
OFFICE
ORTHO WAITING
OFFICE
HAC
FAC
7A01
STORAGE
TOILET
7134A
TOILET
STR
7-4
TOILET
EC
EC
ORTHO SUPPLY
SOILED UTILITY
EXAM
EXAM
7142 EXAM
EXAM
EXAM
CAST RM
7146 STORAGE
7148A
STORAGE
EXAM
TOILET
7146A
FAC
7A02
EC
EC
OFFICE
7110A
OFFICE
7110C
OFFICE
CORRIDOR
C7A13
CORRIDOR
C7A12
CORRIDOR
C7A11
CORRIDOR
C7A11A
CORRIDOR
C7A08
HALLWAY
A0733
CORRIDOR
C7A07
TOILET
7119A
TOILET
7117A
TOILET
7115A
TOILET
7107A OFFICE
OFFICE
OFFICE
EXAM
EXAM
TOILET
7215A
TOILET
7207A
WAITING
EXAM
TOILET
7150A
TOILET
7252A
OFFICE
STORAGE
7250A
STORAGE
LAB
7246 BREAK
WOUND STAFF
7240C
RESTROOM
WAITING
MED RM
7210A
OFFICE
OFFICE
WAITING
CONTROL
7150B
WOUND
7240B
PROCTO
7240A
TOILET
CORRIDOR
C7A04A
CORRIDOR
C7A01
CORRIDOR
C7A05
CIRRIDOR
C7A04
HAC
VP
7-29
TOILET
TOILET
CORRIDOR
C7B02
STORAGE
OFFICE
EXAM
ELEV
7-A-5
ELEV
7-A-6
ELEV
7-A-8
ELEV
7-A-7
OFFICE
OFFICE
OFFICE
EXAM
EXAM
EXAM
DIRTY UTILITY
ENT OFFICE
OFFICE
OFFICE
EXAM
ENT SUPPLY
7306A
HALLWAY
C7B10
CORRIDOR
C7B10A
STR
7-1
ELEV
7-B-12
ELEV
7-B-9
TC
EC
ELEV
7-B-10
ELEV
7-B-11
ELEV LOBBY
C7B05
CORRIDOR
C7B04
CORRIDOR
C7B03B
TRASH RM
OFFICE
OFFICE
5,165 CF
2,915 CF 2,719 CF
1,371 CF
665 CF
2,370 CF
3,125 CF 3,084 CF 1,257 CF 1,254 CF 1,342 CF 1,395 CF
1,697 CF 3,016 CF
225 CF
230 CF
225 CF 230 CF
1,234 CF
2,786 CF
1,940 CF
1,665 CF
1,792 CF
744 CF
1,078 CF
1,840 CF
1,180 CF
1,300 CF
393 CF
3,018 CF
3,018 CF
2,900 CF
327 CF
2,413 CF
3,116 CF
3,054 CF
1,490 CF2,443 CF
744 CF
425 CF
1,577 CF
476 CF
292 CF371 CF
3,853 CF
2,553 CF
1,956 CF
11,976 CF
4,243 CF
B
C
PROJECT AREA A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/5
/2
:2
:2
P M
GC101
INFECTION CONTROL/PHASING
PLANGUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
414.778.1700
RENOVATE AND EXPAND
DIALYSIS CLINIC
5000 W National Ave, Milwaukee, WI 53295
695-19-131
03/26/2020
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"GC101
1 TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL CONSTRUCTION NFPA 241
SCALE: 1/4" = 1'-0"GC101
2 TEMPORARY WALL CONSTRUCTION ELEVATION
SCALE: 1/8" = 1'-0"GC101
4 SEVENTH FLOOR PLAN
N SCALE: 1" = 100'-0"
KEY PLAN
Revisions: Date:
ADDENDUM 02 06/05/2020
File details come from the government source that posted it. Updated .