S06 Att Amend 0002 EP100 - BASEMENT FLOOR OVERALL PLAN.pdf
PDF 478 KB Posted
- Solicitation number
- 36C25220B0021
About this file
This document includes a pre-solicitation notice and project description for a federal construction contract opportunity. The Department of Veterans Affairs is seeking to renovate and expand an existing dialysis clinic located at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project scope involves demolishing and reconstructing an 11,000 square foot vacant ward space to serve as the new dialysis clinic, and includes trades such as demolition, concrete, electrical, plumbing, mechanical, architectural, and specialty furnishings. Hazardous materials abatement for asbestos is also required. The construction period is 540 calendar days with a price range between $2-5 million. The solicitation is scheduled for posting on May 13, 2020 on FedBizOpps with a bid opening on June 16, 2020. The procurement will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOAM
CUTTER
LIGHT
TABLE
BAND
SAW
EYE
WASH
B0230C
STORAGE
B0212B
STORAGE
B0230B
CART
HOLDING
B0218
ELECTRICAL
CLOSET
B0221
ELECTRICAL
CLOSET
C0A3
CORRIDOR
STR
B-5
STAIRWELL
B-A-3
FIRE
APPARATUS
4.53 B-A-3
B0232
HAC
B0234
BREAK
ROOM
B0230A
HAC
B0240A
TOILET,
FEMALE
B0240
LOCKER
ROOM,
FEMALE
C0A4
CORRIDOR
B-A-1
FAC
5.32 B-A-1
B0125
TELEPHONE
CLOSET
C0A2
CORRIDOR
B0205
HAC
B0210
STERILIZER
ROOM
CONTROLS
(NOT IN
USE)
B0114
ELECTRICAL
STORAGE ROOM
B0110
TELEPHONE
CLOSET
29.64 C0A6A
B-A-2
FIRE
APPARATUS
4.17
B-A-2
B0201
STERILE
SUPPLY
B0203
LOCKER ROOM
B0203A
TOILET,
MALE
B0203B
TOILET, FEMALE
B0209
EQUIPMENT
HOLDING
B0209A
EQUIPMENT
ROOM
B0208
STERILIZER
ROOM
(NOT IN
USE)
B0212A
CART
RECEIVING
AREA
B0212
AUTO CART
WASH
(NOT IN USE)
B0230
EQUIPMENT
WASH
ROOM
B0112
LOGISTICS
IMPLANT
OFFICE
B0515
LOCKER
ROOM,
FEMALE
C0C4
HALLWAY
OFFICE
B0532
HAC
VERT PEN B-17
B-C-8
FIRE
APPARATUS
B0533
TREATMENT
B0531
ELECTRICAL
ROOM B0529
OFFICE
B0529A
FIBER
CLOSET
B0513B
STORAGE
B0513AEC
ELEC. CLOSET
B0513
TREATMENT
ROOM
C0C3
HALLWAY
B0514
STORAGE
B0512
OFFICE
B0510
OFFICE
B0508
OFFICE
B0506
OFFICE
B0504EC
ELECTRICAL
ROOM
B0553
TELEPHONE
CLOSET
B0551
HAC
B0501
PHYSICAL
THERAPY
STORAGE
B0503
PHYSICAL
THERAPY
WAITING
AREA
ELEV
BANK
B-C-1
ELEVATOR
ELEV
BANK
B-C-2
ELEVATOR
CBB03C
ELEV.
LOBBY
B-B-4
FIRE
APPARATUS
4.65
B-B-4
ELEV
BANK
B-C-4
ELEVATOR
ELEV
BANK
B-C-3
ELEVATOR
B0610C
EXAM
B0610A
BREAK
B0620B
OFFICE
B0620
OFFICE
B0620A
OFFICE B0622
OFFICE
B0622A
OFFICE
B0602EC
ELECTRICAL
CLOSET
C0026B
HALLWAY
C0026 C0026C
TOILET
B600
SBC
AMERITECH
B0464A
CABLE
VAULT
B0610E
B0610D
STORAGE
B0627D
BREAK
ROOM
[SPD]
B0627E
HAC
B0627A
TELEPHONE
B0627B
ELECTRICAL
CLOSET
B0624
OFFICE
B0627
MEDICAL
SUPPLY
STORAGE
STR
B-28
STAIRWELL
B-B-7
FIRE
APPARATUS
B0012N
STORAGE
B0451
WAREHOUSE
B0451B
WHS
SUPR
B0449B
MAT.
MGT.
SUPR.
OFFICE
B0451A
OFFICE
B0449A
COPY
AREAB0443A
PROSTH-PHARM
STORAGE
B0435A
SPD
CLEAN
SUPPLY
B0464D
STORAGE
B0464C
ELEC.
VAULT
B0464B
BATT RM
B0464
EQUIPMENT
C0B3
CORRIDOR
B0305
OT/PT
CLINIC
B-B-5
FIRE
APPARATUS
6.25
B-B-5
B0431B
MGR'S
OFFICE
B0460EC
ELECTRICAL
CLOSET
BCU01B
HALLWAY
VERT
PEN
B-25
B0431C
ACCOUNTING
B0431B
STORAGE
B0433A
MECHANICAL
ROOM
B0431
CREDIT
UNION
B0431E
LOAN
OFFICER
B0433
OFFICE
B0435
CART
STORAGE
B0437
ESCORT
SERVICE
B0437A
BREAK
ROOM
[WARD
PROPERTY]
B0437B
SUPR'S
OFFICE
B0443
LOGISITICS
SUPPLIES
B0449
MATERIAL
MGT.
OFFICE
B0451C
MER
B0012R
CANTEEN
STORAGE
C0B8
CORRIDOR
C0B7
CORRIDOR
B0441
OFFICE
B0439
OFFICE
C0B5
CORRIDOR
B0426
FIBER
STR
B-1
STAIRWELLVERT
PEN
B-27
ELEV
BANK
B-B-9
ELEVATOR
ELEV
BANK
B-B-12
ELEVATOR
C0B5A
ELEV
LOBBY
ELEV
BANK
B-B-10
ELEV
BANK
B-B-11B0430
STORAGE
B0432A
OFFICE
B0432
OFFICE
B0434
HR
LINKS
B0436
EMS
PROGRAM
MGR.
B0438
FMD
WORKORDERS
B0442
PATIENT
EFFECTS
B0438A
FMD
WORKORDERS
B0444
LINEN
DISTRIBUTION
ELEV
BANK
B-A-5
ELEVATOR
ELEV
BANK
B-A-6
ELEVATOR
ELEV
BANK
B-A-8
ELEVATOR
ELEV
BANK
B-A-7
ELEVATOR
CBBO3A
ELEVATOR
LOBBY
B0109
TOILET,
MALE
B0100
HAC
B0123AEC
ELECTRICAL
CLOSET
STR
B-4
STAIRWELL
208.20
STR
B-4
STR EX
B-27
STAIRWELL
248.34
STR EX
B-27
B0404
LEAD
PHYSICIAN
B0219
TELEPHONE
CLOSET
B0223
LOCKER
ROOM,
FEMALE
B0235
EQUIPMENT
REPAIR
SHOP
B0237
PLUMBING
SHOP
B0239A
ELECTRICAL
STORAGE
B0255
TRANSFORMER
ROOM
B0250
MER
ROOM
B0245
MER ROOM
B0280B
GENERATOR
ROOM
B0456
LOADING
DOCKB0454
SCRUBBER
ROOM
B0452
SCRUBBER
ROOM
B0452B
OFFICE
REPAIR
AREA
B0450EC
ELECTRICAL
ROOM
B0448EC
ELECTRICAL
ROOM
B0446EC
ELECTRICAL
CLOSET
B0452A
TRASH/RECYCLE
B0012P
LOADING
DOCK
STR ES
B-22
STAIRWELL
B0456B
REGULATED
MED
WASTE
HOLDING
CBB9
SOILED
LINEN
HOLDING
STR
B-9
STAIRWELL
STR
B-10
STAIRWELL
STR
B-8
STAIRWELL
C0A5
CORRIDOR
B0210A
ACCESS
TO
STERILIZER
B0239
ELECTRICAL
SHOP
ELEV-LIFT-CL-A17
LIFT,
CLEAN
27.86
ELEV-LIFT-CL-A17
ELEV-LIFT-SL-A13
LIFT,
SOILED
VERT
PEN
B-14
B0215
ELECTRICAL
CLOSET
B0451B1
NX
TECH
B0443B
BULK IV
STORAGE
B0255A
SWITCHBOARD ROOM
0.16
B0012T
OXYGEN
STORAGE
B0012S
NITROUS
OXIDE
B0462C
POLICE
OFFICE
B0462D
OT
OFFICE
B0462B
OT
OFFICE
B0462A
NUTRITION
OFFICE
BCU01B
TELLERS
65.68
BCU01B
B0451D
OFFICE
B0305C
TREATMENT
B0305B
MECHANICAL
B0301EC
ELECTRICAL
CLOSET
B0214
ELECTRICAL
CLOSET
A0002
HALLWAY
B0113
ELECTRIC
CLOSET
B0555
PT EXAM
ROOM
PT EXAM
ROOM
B0280A
SWITCHGEAR
ROOM
B0280
CORRIDOR
MD WORK
B0408
RESIDENT/
MD STUDENT
B0406
PASSAGE
C0B11A
PASSAGE
B0403
EXAM 3
B0420
EXAM 4
B0423
OFFICE
B0407
NURSES
B0402
RECEPTION
B0400
EXAM 1
B0410 EXAM 2
B0412
PASSAGE
C0B11
TOILET
B0421A
TOILET
B0414 CONTROL
B0416
CONTROL
B0418
PASSAGE
B0427
EXAM 5/ED
B0421
BLOCK/DARK
ROOM
B0428
WAITING
ROOM
B0401
CONTROL
B0413A
CT
B0413
LINEAR
ACCELERATOR 1
B0415
EXAM 1
B0410
138 SF
STORAGE
B0413B
34 SF LINEAR
ACCELERATOR 2
B0417
DOSIMITRY
OFFICE
B0434
OFFICE
B0433
OFFICE
B0427
PHYSICIST
B0429
RTT
WORK RM
B0430
LEAD
RT
B0429
CLO
B0427A
CLO
B0427B
PASS
B0435A
SUPERVISOR
B0105
CORRIDOR
C0A7
CORR
C0A8
PASS
B0151A
PASSAGE
B1049A
WORK
B0148
COR
C0A9
B-A-1
FAC
5.32 B-A-1
B0130A
ELEC
CLOSET
B0112A
STORAGE
OT/PT
STORAGE
B0305D
B0305A
OFFICE
146.11 B0001A
B0126
HAC
31.47 A0026
VERT PEN
B-31 19.62
STR
B-4
STAIRWELL
208.20
STR
B-4
CORRIDOR
C0A7
CORR
C0A8
KITCHENETTE
B0154
PASSAGE
B1049A
WORK
B0148
STORAGE
B0147
ADMIN
B0151
COR
C0A9
OT/PT
CHARTING
B0104
OT/PT
BREAKROOM
B0104A
STORAGE
B0130
OFFICE
B0129
BIOFEEDBACK
B0128
LOCKER ROOM
FEMALE
A0027
CORRIDOR
C0A6C
PROSTHETHIST
B0150
WORKSHOP
B0150A
ORTHO
WORKSHOP
B0149
AMPUTEE
CLINIC
B0146
EXAM
B0145
EXAM
B0144
RECORD
STORAGE
B0153
WHEELCHAIR
WASH
B0137A
OFFICE
B0155
WHEELCHAIR
REPAIR
B0137
PROGRAM
MANAGER
B0156
PROSTHETICS
INVENTORY
B0138
WAITING
B0140
RECEPTION
B0141
RESP
THERAPY
OFFICE
B0142
PASSAGE
B0140A
AMPUTEE
CASTINGS
B0146A
C0A4A
WAITING
UNASSIGNED
COPY/MAIL
B0153
B0435B
OFFICE
UNEXCAVATED
B0200
CLEAN
CART &
ELEVATOR
B0201
ELEVATOR
EQUIP
B0103
TOILET,
FEMALE
B0108
TOILET,
MALE
B0107
TOILET,
FEMALE
B0507
PHYSICAL
THERAPY
RECEPTION
BATH ROOM
FEMALE
A0027A
B0610
OUTPATIENT
PT
B0529B
STORAGE
B0513A
FIBER
CLOSET
B0225
OFFICE
B0114A
ELECTRICAL
CLOSET
B0207
STEAM
STERILIZER
(NOT IN USE)
B0320
PHYSICAL
THERAPY
B0320A
MER
STR
B-18
STAIRWELL
B0130B
ELEC
CLOSET
DOWN
RAMP
DOWN
RAMP
DOWN
RAMP
DOWN
RAMP
GENERATOR #1
GENERATOR #2
GENERATOR #3
SW
ITC
HGEAR
F D
307-Q-4
EDH
EX
EP300
ADD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C
R e v it L o c a lF ile s \2
.0
M
P e re z ri n g d u .c o m
.r v t
/5
/2
:4
:5
P M
EP100
BASEMENT FLOOR OVERALL PLAN
GUIDON DESIGN INC.
1221 N. Pennsylvania Street
Suite 200
Indianapolis, Indiana 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. Capital Drive
Brookfield, WI 53045
414.778.1700
RENOVATE AND EXPAND
DIALYSIS CLINIC
5000 W National Ave, Milwaukee, WI 53295
695-19-131
03/26/2020
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"EP100
1 BASEMENT FLOOR OVERALL PLAN
KEYED NOTES -
1. APPROXIMATE FEEDER ROUTE TO NEW EQUIPMENT PANEL.
REFER TO ONE LINE DIAGRAM FOR ADDITIONAL
INFORMATION.
N
Revisions: Date:
ADDENDUM 02 06/05/2020
1.
2.
SHEET NOTES -
FIRST FLOOR ABOVE CEILING WORK SHALL TAKE PLACE
BETWEEN THE HOURS OF 5:00 PM AND 5:00 AM. IN AREAS
THAT REQUIRE ABOVE CEILING WORK WHERE CEILINGS
ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND
STORED IN A SAFE MANOR UNTIL CEILING TILES CAN BE
REINSTALLED. DAMAGED AND BROKEN CEILING TILES
SHALL BE REPLACED BY CONTRACTOR.
THE CONTRACTOR SHALL BE ALLOWED UNENCUMBERED
ACCESS TO PORTIONS OF THE FIRST FLOOR TO COMPLETE
MEPF DEMOLITION, RELOCATIONS AND NEW WORK. THIS
WORK SHALL HAVE ITS OWN PLASTIC INFECTION CONTROL
BARRIER WITH ZIP-WALLS AND NEGATIVE AIR MACHINES.
CEILING SHALL BE RETURNED TO NORMAL AT END OF THE
WORK DAY. OFF-SHIFT WORK IS ACCEPTABLE WITH COR
PERMISSION. OUTAGES SHALL BE OFF-SHIFT. EACH SUB-
PHASE REQUIRES ITS OWN INFECTION CONTROL
WORKPLAN. AN OVERALL SUB-PHASING PLAN IS REQUIRED
DURING PRE-CONSTRUCTION SUBMITTAL PHASE TO
COORDINATE ACCESS TO FIRST FLOOR SPACES AND
MOVES BY VA PERSONNEL.
ADD
| Sheets |
| EP100 - BASEMENT FLOOR OVERALL PLAN |
File details come from the government source that posted it. Updated .