S06 Att Amend 0002 AI201 - INTERIOR FINISHES ELEVATIONS.pdf
PDF 519 KB Posted
- Solicitation number
- 36C25220B0021
About this file
This solicitation is for a construction project to renovate and expand the dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project involves demolishing and reconstructing ward 7AS to house the new dialysis clinic, which will relocate from the 5th floor. Required construction work includes demolition, concrete, electrical, plumbing, technical systems, mechanical systems, patient ceiling lifts, pneumatic tube installation, and architectural components. Specialty furnishings to support the dialysis mission are also required. Hazardous material abatement for asbestos will be conducted. The total renovated space will be approximately 11,000 square feet. The project value is estimated between $2 million to $5 million. The solicitation and specifications will be posted on May 13, 2020, with bid opening scheduled for June 16, 2020 and a pre-bid site walkthrough. The period of performance is 540 calendar days from notice to proceed. This solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. MOUNTING HEIGHTS ARE TYPICAL AND APPLY TO FIXTURES INSTALLED IN
NEW RESTROOMS. VERIFY MOUNTING HEIGHTS WITH VENDOR SPECIFIC
MOUNTING HEIGHTS. COORDINATE WITH COR PRIOR TO INSTALLING
BLOCKING.
B. TYPICAL MOUNTING HEIGHTS AND INTERIOR ELEVATIONS ARE FOR USE IN
COORDINATION OF FIXTURES. NOTE NOT EVERY FIXTURE MAY BE
REPRESENTED IN INTERIOR ELEVATIONS. COORDINATE PROJECT
REQUIREMENTS WITH THE FLOOR PLAN AND ENLARGED FLOOR PLANS.
C. COORDINATE INSTALLATION OF EQUIPMENT WITH PLUMBING FIXTURES AND
PLUMBING DRAWINGS. REFER TO PLUMBING PLANS FOR INFORMATION ON
PLUMBING ACCESSORIES AND FIXTURES.
D. FIELD VERIFY DIMENSIONS FOR CEILING HUNG TOILET PARTITIONS WITH
BUILT CONDITIONS.
E. PROVIDE EACH SINK WITHIN SCOPE WITH A PAPER TOWEL DISPENSER AND
SOAP DISPENSER.
F. PROVIDE UNDER LAVATORY GUARD AT WALL MOUNTED HAND LAVATORIES
IN SCOPE.
G. PROVIDE INWALL BLOCKING FOR WALL MOUNTED TOILET ACCESSORIES
AND TOILET PARTITIONS.
H. FOR BARIATRIC TOILET ROOMS, GRAB BARS SHALL BE FOR BARIATRIC
LOAD.
TOILET ACCESSORY GENERAL NOTES
A. REFER TO EQUIPMENT SCHEDULE AND EQUIPMENT PLAN FOR ADDITIONAL
INFORMATION. FURNITURE AND EQUIPMENT SHOWN FOR REFERENCE
ONLY.
B. COORDINATE WITH ENGINEERING DRAWINGS. REFER ANY DISCREPANCIES
TO COR AND ARCHITECT.
C. REFER TO PLUMBING ENGINEERING DRAWINGS FOR ADDITIONAL
COORDINATION INFORMATION ON SINKS AND TOILETS.
D. PROVIDE BLOCKING AS REQUIRED. REFER TO SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
E. REFER TO TOILET ACCESSORY SCHEDULE FOR INFORMATION REGARDING
ACCESSORIES. PROVIDE SOAP AND PAPER TOWEL DISPENSERS AT EACH
SINK WITHIN PROJECT BOUNDARY.
F. REFER TO SPECIFICATIONS FOR CASEWORK HARDWARE.
G. REFER TO FINISH SCHEDULE ON SHEET AI601 FOR ADDITIONAL
INFORMATION.
H. REFER TO INTERIOR ELEVATIONS AND FINISHES SHEETS FOR ADDITIONAL
NOTES AND LEGENDS.
I. PROVIDE WORK SURFACE SUPPORT BRACKETS AS NECESSARY WITH
SPACING RECOMMENDED BY MANUFACTURER. COORDINATE SUPPORT
LOCATIONS WITH UNDERCOUNTER EQUIPMENT AND FURNITURE.
J. PROVIDE FILLER PANELS BETWEEN WALLS AND CABINETS, NOT TO EXCEED
3". VERIFY DIMENSIONS IN THE FIELD.
K. PROVIDE PLASTIC LAMINATE ON ALL EXPOSED SURFACES, EDGES AND
ENDS OF WALL MOUNTED AND BASE CABINETS. INTERIORS SHALL BE WHITE
MELAMINE. PROVIDE FURNITURE FINISHED ENDS ON ALL EXPOSED SIDES
OF CASEWORK.
L. WALLS AND INFILL WALL CONSTRUCTION AND FINISHES SHALL BE
PROVIDED FROM WALL CORNER TO WALL CORNER.
M. REFER TO FINISH PLANS FOR INFORMATION REGARDING ACCENT PAINT
LOCATIONS AND FLOORING PATTERNS.
N. PROVIDE P-1 ON WALLS, UNLESS OTHERWISE NOTED.
O. PROVIDE P-2 ON HOLLOW METAL DOOR AND WINDOW FRAMES IN SEMI-
GLOSS FINISH, UNLESS OTHERWISE NOTED.
P. PROVIDE CEILING WHITE PAINT ON GYPSUM BOARD CEILINGS AND
BULKHEADS, UNLESS OTHERWISE NOTED.
Q. PROVIDE PAINT TO MATCH WALL PAINT ON ALL EXPOSED METAL ACCESS
PANELS, DUCTS AND OTHER MISC. EXPOSED CONSTRUCTION ELEMENTS,
UNLESS OTHERWISE NOTED.
R. PATCH AND/OR REPAIR, FINISH, AND PAINT ALL WALLS IN AREA OF WORK.
S. REFER TO INTERIOR ELEVATIONS SHEETS FOR WALL RWC PATTERN. PAINT
WALLS ABOVE TILE AS IDENTIFIED IN FINISH SCHEDULE.
T. SEE INTERIOR FINISHES DETAILS FOR FLOORING TRANSITIONS.
U. PROVIDE MANUFACTURER TYPICAL TRIM, TRANSITION, AND FINISHING
ACCESSORIES. EDGES AND JOINT SHALL BE FINISHED SMOOTH AND TO
MANUFACTURER'S INSTRUCTIONS.
V. PROVIDE (2) 2" GROMMETS PER WORKSTATION IN WORK WORKSURFACES.
GROMMET LOCATIONS TO BE COORDINATED IN FIELD WITH COR.
W. PROVIDE VERTICAL LAMINATE GRAIN ON VERTICAL SURFACES AND SLOPED
TOPS, UNLESS OTHERWISE NOTED.
X. INSTALL CORNER GUARDS MOUNTED ABOVE RESILIENT BASE.
Y. INSTALL WALL BASE OVER RIGID WALL COVERING (RWC).
AA. SEE FINISHES WALL PROTECTION PLAN FOR ADDITIONAL INFORMATION.
BB. DIMENSIONS ON INTERIOR FINISHES PLANS AND ELEVATIONS ARE FROM
FINISH FACE.
CC. PROVIDE HORIZONTAL SLAT BLINDS AT ALL EXTERIOR WINDOWS WITHIN
SCOPE, UON.
DD. FLOOR PREP AND LEVELING REQUIRED THROUGHOUT, PRIOR TO FLOOR
FINISH INSTALLATION. SEE SPECIFICATIONS.
INTERIOR FINISHES GENERAL NOTES
PUBLIC TLT
URINALYSIS LAB
AI201
AI201
3'
1' - 8 5/8"
9" 1'
2'
1'
TA4
TA1
TA3
TA2
TA7
TA7
TA8
TA8
TA9
TA6
TA10
TA14
TA11
TA11
1' - 3"
TA5
TA16
TA16
A5107
EXAM
7103 AI201
1'
9"
2' - 2 1/2"
TA8
TA7
A5107
A5107
TA16
F2010
M1801
WORK
STATION - SEE
FURN PLAN
1'
1' - 3" 1' - 9"
WSF-3
RWC-2
4" 3'
TA14
TA3
TA1
TA5
TA2
TA6
3' - 3"
1' - 8 29/32" 1' - 3"
RWC-2
4" 3'
WSF-3
TA2
TA6
TA5
TA1 TA7
TA10
TA8
TA9
1'
2'
1'
2'
0"
8'
3' - 2" 1' - 10" 2"
5' - 2"
1' - 3"
AI502
AI502
AI502
RB-1
PL-1
S-2
3' - 2" 1' - 10" 2"
TA8
M1801
TA16 M4200
RB-1
WORK STATION -
SEE FURN PLAN
3' - 4" 1' - 8"
SLIDE
4'
11 3/8" P O V
4" 2'
2' - 0" 3' - 1" 2' - 3"
1'
2'
1'
2'
0"
8'
2' - 1"
2'
AI502
AI502
R6070
F2015
TA8
TA7
RB-1
PL-3
S-2
3' - 6 1/4"
1/4"
1' - 11 3/4"
1/4"
6' - 5 3/4"
1/4"
1' - 11 3/4"
1/4"
6' - 5 3/4"
1/4"
1' - 11 3/4"
1/4"
4' - 11 3/4"
1/4"
1' - 11 3/4"
1/4"
4' - 11 3/4" 1/4"
1' - 11 3/4" 1/4"
2' - 6"
AI502
SIM
AI502
SIM
AI502
SIM
O VO VO V O V O VE E DE E DE E DE E D E E D
P P P
1/
2"
1/ 4" 9 3/
8"
3/ 8"
1'
/4
1/
4"
2'
/2
U1009
U1009 U1009 U1009 U1009
S-1
PL-4
WSF-2
PNN
4"6"6"2' - 8"4' - 6"4"6"6"2' - 8"4' - 6 1/2"4"6"6"2' - 8"3' - 0"4"6"6"3' - 0"2' - 8"4"6"6"2' - 8"2' - 1 5/8"
7" 6" 6"
P NN PNN PNN P PNN
5 1/4" 2' - 6" 6" 6" 1' - 1 1/4" 6" 6" 3' - 3"
5 1/4" 4" 6" 6" 4" 6" 6" 7"
O VE E D
P P
OVED
P
OVEDE
P
U1009 U1009 U1009
S-1
PL-4
WSF-2
WSF-2
2'
4"
RWC-1
NN
9"
1/4"
1' - 11 3/4" 1/4"
4' - 11 5/8"
1/4"
1' - 11 3/4"
1/4"
4' - 11 5/8"
1/4"
1' - 11 3/4"
1/4"
9"
4 1/2" 2' - 8 5/8" 6" 6" 4" 1' - 8" 4" 6" 6" 3' - 8" 2' - 0" 4" 6" 6" 2' - 8 1/2"
4 1/2"
PNN
E
PNN
4 1/2" 2' - 8 5/8" 6" 6" 2' - 4" 3' - 8" 6" 6" 2' - 4" 2' - 8 1/2" 6" 6"
4 1/2"
AI502
SIM
AI502
SIM
3" 2' - 3" 2' - 3" 2' - 3" 1' - 6" 2' - 1"
2'
0"
AI502
RB-1
PL-3
S-2
2" 3' - 0"
2'
0"
2'
2'
1'
8'
6" 2' - 0"
F2000
M1801TA8
TA7
CLEAR
3' - 0"
AI502
AI502 S-2
RB-1
PL-1
WORK
STATION - SEE
FURN PLAN
1' - 6"6"
2'
0"
4' - 0"
TA7
TA8
U1008
AI502
S-2
WSF-3
PL-1
RWC-2
4'
2' - 0 3/4"
1' - 9 3/4"
O V E D D E V OE
P PN
E
PP
U1009 U1009
S-1
PL-4
WSF-2
WSF-2
S-1
PL-4
WSF-2
WSF-2
RWC-1 RWC-1
4" 2'
N N N
2' - 4" 6" 6" 4" 5"
1' - 5 7/8"
1/4"
1' - 11 7/8"
6" 6" 7" 2' - 9" 9"
1' - 11 7/8"
1/4"
1' - 5 7/8"
9" 3' - 7" 6" 6" 7 1/4"
5" 4" 6" 6" 2' - 7"
AI502
SIM
AI502
SIM
3'
4' - 0"
METAL T-LEG
F2000
L0105
M1801
RB-1
S-2
O .C
O.C.
39" - 41"
3' - 6" 1' - 0"
T O
R E
F L E
C T
IV
E
3'
M A
X
7" - 9" O.C.
2' - 0"
1/
2" M
IN
T O
T O
P
3'
6" 3' - 0"
M A
X T
O B
U T
T O
N
M
A X
TA7TA2
TA3
TA1
TA5
TA4
TA9
TA6
M A
X T
O O
U T
LE
T
M
A X
TA8
SCALE: 1/4" = 1'-0"
M
IN T
O T
O P
4'
TA11
T O
P O
F B
A R
3'
TA12
1' - 6"
3'
TA15
M A
X T
O H
A N
D
LE
M
A X
T O
T O
P
4'
TA14
M A
X T
O B
U T
T O
N
M
A X
TA16
M A
X T
O B
U T
T O
N
M
A X
TA171' - 6"
TYPICAL TOILET ACCESSORY MOUNTING HEIGHTS
TA10
3'
NOTE: WHERE TA12 IS USED, HORIZONTAL GRAB BARS SHALL BE 33" TO TOP IN LIEU OF 36" TO TOP.
1' - 3" EQ EQ
RWC-23'
4"
WSF-3
TA8
TA10
1' - 11 1/2"
3/8"
1' - 11 1/2"
2'
1'
3/ 8"
1'
5/ 8"
3/ 8"
5/
8"
6'
3' - 11 3/8"
2' - 1 3/4"
M0506
4'
S-1
WSF-2
WSF-2
A4015
RB-1
WORK STATION -
SEE FURN PLAN
RWC-1
RB-1
2'
4"
A4015
M0506
A1012
O OXYGEN
N NURSE CALL
V VACUUM
E EMERGENCY POWER
P POWER
D DATA
DIALYSIS BOX/MEDGAS LEGEND
DIALYSIS WATER BOX
N
*REFERENCE/COORDINATE WITH MEP DRAWINGS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C U s e rs
\d v a lla n d in g h a m \D o c u m e n ts
\1
.1
.1
A v d v a lla n d in g h a m g u id o n d e s ig n .c o m
.r v t
/5
/2
:2
:1
P M
AI201
INTERIOR FINISHES ELEVATIONS
GUIDON
1221 N. PENNSYLVANIA STREET
INDIANAPOLIS, IN 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. CAPITOL DRIVE
BROOKFIELD, WI 53045
414.778.1700
RENOVATE AND EXPAND
DIALYSIS CLINIC
5000 W National Ave, Milwaukee, WI 53295
695-19-131
03/26/2020
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
TOILET ACCESSORY AND PARTITION SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL
RESPONSIBLE
PARTY COMMENTS
TA1 42" HORIZONTAL GRAB BAR BOBRICK WASHROOM EQUIPMENT,
INC
B-6806 x 42 CFCI PROVIDE INWALL BLOCKING
TA2 36" HORIZONTAL GRAB BAR BOBRICK WASHROOM EQUIPMENT,
INC
B-6806 x 36 CFCI PROVIDE INWALL BLOCKING
TA3 18" VERTICAL GRAB BAR BOBRICK WASHROOM EQUIPMENT,
INC
B-6806 x 18 CFCI PROVIDE INWALL BLOCKING
TA4 TOILET PAPER DISPENSER KIMBERLY CLARK KCC09021 CFCI PROVIDE INWALL BLOCKING
TA5 SANITARY PRODUCT DISPOSAL UNIT - SURFACE MOUNTED BRADLEY CORPORATION 4A10 CFCI PROVIDE INWALL BLOCKING. SURFACE-MOUNTED
TA6 SEAT COVER DISPENSER BRADLEY CORPORATION 5831 CFCI PROVIDE INWALL BLOCKING
TA7 DISPENSER, SOAP STERIS DBU1307Q5 + 1308Q7 CFCI PROVIDE INWALL BLOCKING
TA8 PAPER TOWEL DISPENSER KIMBERLY CLARK KCC34348 CFCI PROVIDE INWALL BLOCKING
TA9 CHANNEL FRAME MIRROR BOBRICK WASHROOM EQUIPMENT,
INC
B-165 1836 CFCI PROVIDE INWALL BLOCKING
TA10 WASTE RECEPTACLE, 12 GALLON, SEMI-RECESSED BRADLEY CORPORATION 346-100000 CFCI SEMI-RECESSED
TA11 ROBE HOOK - DOUBLE, PROJECTS 2 1/4" BRADLEY CORPORATION 9124 BradEX CFCI PROVIDE INWALL BLOCKING
TA14 SHELF Bradley Corporation 758-24 CFCI Shelf
TA16 HAND SANITIZER DISPENSER PURELL SKILCRAFT 1049-06 + GOJ2661-06 CFCI PROVIDE INWALL BLOCKING
SCALE: 3/8" = 1'-0"AI201
1 SEVENTH FLOOR - PUBLIC TLT & LAB
SCALE: 3/8" = 1'-0"AI201
7 SEVENTH FLOOR - EXAM / ALCOVE
SCALE: 3/8" = 1'-0"AI201
2 INTERIOR ELEVATION - PUBLIC TLT 7101
SCALE: 3/8" = 1'-0"AI201
3 INTERIOR ELEVATION - PUBLIC TLT 7101
SCALE: 3/8" = 1'-0"AI201
5 INTERIOR ELEVATION - LAB 7152
SCALE: 3/8" = 1'-0"AI201
8 INTERIOR ELEVATION - EXAM 7103
SCALE: 3/8" = 1'-0"AI201
9 INTERIOR ELEVATION - BREAK 7125
SCALE: 3/8" = 1'-0"AI201
16 INTERIOR ELEVATION - 7106 BAYS
SCALE: 3/8" = 1'-0"AI201
17 INTERIOR ELEVATION - 7110 BAYS
SCALE: 3/8" = 1'-0"AI201
10 INTERIOR ELEVATION - BREAK 7125
SCALE: 3/8" = 1'-0"AI201
12 INTERIOR ELEVATION - TRAINING / CONSULTSCALE: 3/8" = 1'-0"AI201
13 INTERIOR ELEVATION - SOILED UTILITY 7121
SCALE: 3/8" = 1'-0"AI201
18 INTERIOR ELEVATION - 7114 BAYS
SCALE: 3/8" = 1'-0"AI201
6 INTERIOR ELEVATION - LAB TABLE 7152
SCALE: 3/8" = 1'-0"AI201
4 INTERIOR ELEVATION - PUBLIC TLT 7101
SCALE: 3/8" = 1'-0"AI201
15 INTERIOR ELEVATION - 7114 BAYS
SCALE: 3/8" = 1'-0"AI201
11 INTERIOR ELEVATION - BREAK 7125
SCALE: 3/8" = 1'-0"AI201
14 INTERIOR ELEVATION - WAITING ROOM 7100
Revisions: Date:
ADDENDUM 02 06/05/2020
File details come from the government source that posted it. Updated .