About this file

This solicitation notice is for a construction project to renovate and expand the dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contractor shall provide all labor, materials, equipment and supervision to demolish an existing vacant ward, and reconstruct the space to become the new home for the hospital's dialysis clinic. The construction work includes trades such as demolition, concrete, electrical, plumbing, HVAC, architectural and specialty furnishings. Hazardous materials abatement for asbestos is also required. The total square footage to be renovated is approximately 11,000 square feet. The project magnitude price range is between $2,000,000 to $5,000,000. The period of performance is 540 calendar days from notice to proceed. The solicitation is scheduled to post on May 13, 2020 with bid opening on June 16, 2020. The procurement is set aside as 100% service-disabled veteran owned small business and offers must represent SDVOSB or VOSB status and size at time of submission.

View the file

Other files

File Type Posted
Amend 0005 00 01 10 TABLE OF CONTENTS.pdf PDF
Amend 0005 22 67 19.16 REVERSE-OSMOSIS WATER EQUIPMENT.pdf PDF
Amend 0005 08 71 13.11 LOW ENERGY DOOR OPERATORS.pdf PDF
S06 36C25220B0021 0005.pdf PDF
Amend 0005 01 91 00 COMMISSIONING REQUIREMENTS.pdf PDF
Amend 0005 01 01 10 SN SPECIAL NOTES.pdf PDF
Amend 0005 11 73 00 CEILING MOUNT PATIENT LIFT.pdf PDF
Amend 0005 14 92 00 PNEUMATIC TUBE SYSTEM.pdf PDF
Amend 0003 Photos Revised.pdf PDF
S06 36C25220B0021 0004.pdf PDF
AI601 - FINISH SCHEDULES.pdf PDF
Wage Determination 6.19.20.pdf PDF
Amend 0003 Photos.pdf PDF
SECTION 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
36C25220B0021 0003.pdf PDF
S06 Att Amend 0002 00 01 10 - TABLE OF CONTENTS.pdf PDF
S06 Att Amend 0002 EP100 - BASEMENT FLOOR OVERALL PLAN.pdf PDF
S06 Att Amend 0002 AI201 - INTERIOR FINISHES ELEVATIONS.pdf PDF
S06 Att Amend 0002 AE601 - DOOR_WINDOW SCHEDULE.pdf PDF
S06 36C25220B0021 0002.pdf PDF
S06 Att Amend 0002 28 05 13 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY.pdf PDF
S06 Att Amend 0002 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
S06 Att Amend 0002 01 74 19 - CONSTRUCTION WASTE MANAGEMENT.pdf PDF
S06 Att Amend 0002 GC101 - INFECTION CONTROL_PHASING PLAN.pdf PDF
S06 Att Amend 0002 ET102 - SEVENTH FLOOR SYSTEMS PLAN - DIVISION 28.pdf PDF
S06 Att Amend 0002 AD101 - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 MD101 - MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR.pdf PDF
S06 Att Amend 0002 10 14 00 - SIGNAGE.pdf PDF
S06 Att Amend 0002 12 24 00 - WINDOW SHADES.pdf PDF
S06 Att Site Visit Sign In 5.28.20.pdf PDF
S06 Att Amend 0002 03 30 53 - CAST-IN-PLACE CONCRETE.pdf PDF
S06 Att Amend 0002 QH101 - SEVENTH FLOOR EQUIPMENT PLAN.pdf PDF
S06 Att Amend 0002 01 91 00 - COMMISSIONING REQUIREMENTS.pdf PDF
S06 Att Amend 0002 22 07 11 - PLUMBING INSULATION.pdf PDF
S06 Att Amend 0002 ET101D - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 22 11 00 - FACILITY WATER DISTRIBUTION.pdf PDF
S06 Att Amend 0002 AE501 - BUILDING DETAILS.pdf PDF
S06 Att Amend 0002 AI901 - SIGNAGE PLAN.pdf PDF
S06 Att Amend 0002 AI101 - FINISH WALL TREATMENT PLAN.pdf PDF
S06 Att Amend 0002 EP401 - ONE LINE DIAGRAM.pdf PDF
S06 Att Wage Determination 6.5.20.pdf PDF
Site Visit Sign In 5.20.20.pdf PDF
36C25220B0021 0001.docx DOCX document
Amend 0001 Specification 22 63 00.pdf PDF
Amend 0001 Specification 00 01 10.pdf PDF
Amend 0001 Specification 08 14 00.pdf PDF
Amend 0001 Specification 09 06 00.pdf PDF
Amend 0001 J_A Patient Ceiling Lift.pdf PDF
36C25220B0021-011.pdf PDF
36C25220B0021-012.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Milwaukee VAMC 02-01-15

695-19-131 Renovate & Expand Dialysis Clinic 100% Construction Documents

Milwaukee, WI 53295 March 26, 2020

09 05 16 - 1

SECTION 09 05 16

SUBSURFACE PREPARATION FOR FLOOR FINISHES

PART 1 - GENERAL

1.1 DESCRIPTION

This section specifies subsurface preparation requirements for areas to receive the installation of applied and resinous flooring. This section includes removal of existing floor coverings, testing concrete for moisture and pH, remedial floor coating for concrete floor slabs having unsatisfactory moisture or pH conditions, floor leveling and repair as required.

1.2 RELATED WORK

A. Section 07 92 00, JOINT SEALANTS.

B. Section 09 65 16, RESILIENT SHEET FLOORING Section 09 65 19, RESILIENT

TILE FLOORING Section 09 68 00, CARPETING.

1.3 SUBMITTALS

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA and TEST DATA.

B. Written approval confirming product compatibility with subfloor material manufacturer and the flooring manufacturer

C. Product Data:

1. Moisture remediation system

2. Underlayment Primer

3. Lightweight Cementitious In-Fill

4. Cementitious Self-Leveling Underlayment

5. Cementitious Trowel-Applied Underlayment (Not suitable for resinous floor finishes)

D. Test Data:

1. Moisture test and pH results performed by a qualified independent testing agency or warranty holding manufacturer’s technical representative.

1.4 DELIVERY AND STORAGE

A. Deliver materials in containers with labels legible and intact and grade-seals unbroken.

B. Store material to prevent damage or contamination.

09 05 16 - 2

1.5 APPLICABLE PUBLICATIONS

A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.

B. American Society for Testing and Materials (ASTM):

D638-10

(2010) Test Method for Tensile Properties of Plastics

D4259-88

(2012)

Standard Practice for Abrading Concrete to alter the surface profile of the concrete and to remove foreign materials and weak surface laitance.

C109/C109M

-12

(2012)

Standard Test Method for Compressive Strength of

Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube

Specimens) Modified Air Cure Only

D7234-12

(2012)

Standard Test Method for Pull-Off Adhesion Strength of

Coatings on Concrete Using Portable Pull-Off Adhesion

Testers.

E96/E96M -

(2012)

Standard Test Methods for Water Vapor Transmission of

Materials

F710-11

(2011)

Standard Practice for Preparing Concrete Floors to

Receive Resilient Flooring

F1869-11

(2011)

Standard Test Method for Measuring Moisture Vapor

Emission Rate of Concrete Subfloor Using Anhydrous

Calcium Chloride

F2170-11

(2011)

Standard Test Method for Determining Relative Humidity in

Concrete Floor Slabs Using in situ Probes

C348-08

(2008)

Standard Test Method for Flexural Strength of Hydraulic-

Cement Mortars

C191-13

(2013)

Standard Test Method for Time of Setting of Hydraulic

Cement by Vicat Needle

PART 2 - PRODUCTS

2.1 MOISTURE REMEDIATION COATING

A. System Descriptions:

1. High-solids, epoxy system designed to suppress excess moisture in concrete prior to an overlayment. For use under resinous products, VCT, tile and carpet where issues caused by moisture vapor are a concern.

B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up.

09 05 16 - 3

C. System Components: Verify specific requirements as systems vary by manufacturer. Verify build up layers and installation method. Verify compatibility with substrate. Use manufacturer’s standard components, compatible with each other and as follows:

1. Liquid applied coating:

a. Resin: epoxy.

b. Formulation Description: Multiple component high solids.

c. Application: Per manufacturer’s written installation requirements.

d. Thickness: minimum 10 mils

D. Material Vapor Permeance: Application shall achieve a permeance rating of less than 0.1 perm in accordance with ASTM E96/E96M.

E. Maximum RH requirement: 100% testing in accordance with ASTM F2170.

2.2 CEMENTITIOUS SELF-LEVELING UNDERLAYMENT

A.

System Descriptions:

1. High performance self-leveling underlayment resurfacer. Single component, self-leveling, cementitious material designed for easy application as an underlayment for all types of flooring materials.

It is used for substrate repair and leveling.

B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up. Gypsum-based products are unacceptable.

C. System Characteristics:

1. Wearing Surface: smooth

Property Test Value

Tensile Strength

ASTM D638 4,400 psi

Volatile Organic Compound

Limits (V.O.C.)

SCAMD Rule 1113 25 grams per liter

Permeance ASTM E96 0.1 perms

Tensile Modulus ASTM D638 1.9X105 psi

Percent Elongation ASTM D638 12%

Cure Rate Per manufacture’s

Data

4 hours Tack free with 24hr recoat window

Bond Strength ASTM D7234 100% bond to concrete failure

09 05 16 - 4

2. Thickness: Per architectural drawings, ranging from feathered edge to 1”, per application. Applications greater than 1” require additional 3/8” aggregate to mix or as recommended by manufacturer.

D. Underlayment shall be calcium aluminate cement-based, containing

Portland cement. Gypsum-based products are unacceptable.

E. Compressive Strength: Minimum 4100 psi in 28 days in accordance with

ASTM C109/C109M.

F. Flexural Strength: Minimum 1000 psi in 28 days in accordance with ASTM

C348

G. Dry Time: Contractor to follow manufacturer’s recommendation on drying time for all underlayment floor coverings. All underlayment must be completely cured before installation of finished flooring.

H. Primer: compatible and as recommended by manufacturer for use over intended substrate

I. System Components: Manufacturer's standard components that are compatible with each other and as follows:

1. Primer:

a. Resin: copolymer

b. Formulation Description: single component ready to use.

c. Application Method: Squeegee and medium nap roller.

All puddles shall be removed, and material shall be allowed to dry, 1-2 hours at 70F/21C.

d. Number of Coats: (1) one.

2. Grout Resurfacing Base:

a. Formulation Description: Single component, cementitious self-leveling high-early and high-ultimate strength grout.

b. Application Method: colloidal mix pump, cam rake, spike roll.

1) Thickness of Coats: Per architectural scope, 1” lifts.

2) Number of Coats: More than one if needed.

c. Aggregates: for applications greater than 1inch, require additional 3/8” aggregate to mix.

Property Test Value

Compressive Strength

ASTM C109/C109M

2,200 psi @ 24 hrs

3,000 psi @ 7 days

Initial set time

Final Set time

ASTM C191

30-45 min.

1 to 1.5 hours

Bond Strength

ASTM D7234

100% bond to concrete failure

09 05 16 - 5

2.3 CEMENTITIOUS TROWEL-APPLIED UNDERLAYMENT(NOT SUITABLE FOR RESINOUS FLOOR

FINISHES)

A. Underlayment shall be calcium aluminate cement-based, containing

Portland cement. Gypsum-based products are unacceptable.

B. Compressive Strength: Minimum 4000 psi in 28 days

C. Trowel-applied underlayment shall not contain silica quartz (sand).

D. Dry Time: Underlayment shall receive the application of floor covering in 15-20 minutes.

PART 3 - EXECUTION

3.1 ENVIRONMENTAL REQUIREMENTS

A. Maintain ambient temperature of work areas at not less than 16 degree C

(60 degrees F), without interruption, for not less than 24 hours before testing and not less than three days after testing.

B. Maintain higher temperatures for a longer period of time where required by manufacturer's recommendation.

C. Do not install materials when the temperatures of the substrate or materials are not within 60-85 degrees F/ 16-30 degrees C.

3.2 SURFACE PREPARATION

A. Existing concrete slabs with existing floor coverings:

1. Conduct visual observation of existing floor covering for adhesion, water damage, alkaline deposits, and other defects.

2. Remove existing floor covering and adhesives. Comply with local, state and federal regulations and the RFCI Recommended Work

Practices for Removal of Resilient Floor Coverings, as applicable to the floor covering being removed.

B. Concrete shall meet the requirements of ASTM F710 and be sound, solid, clean, and free of all oil, grease, dirt, curing compounds, and any substance that might act as a bond-breaker before application. As required prepare slab by mechanical methods. No chemicals or solvents shall be used.

C. General: Prepare and clean substrates according to flooring manufacturer's written instructions for substrate indicated. Grind to exposed ¼” aggregae uniformly, to within ½” of walls, feather at corners.00

D. In-fill all existing locations where mortar beds have been removed with lightweight concrete flooring in-fill. Ensure in-fill is compatible with floor leveling substrate product.

09 05 16 - 6

E. Prepare concrete substrates per ASTM D4259 as follows:

1. Dry abrasive blasting.

2. Wet abrasive blasting.

3. Vacuum-assisted abrasive blasting.

4. Centrifugal-shot abrasive blasting.

5. Comply with manufacturer's written instructions.

F. Repair damaged and deteriorated concrete according to flooring manufacturer's written recommendations.

G. Verify that concrete substrates are dry.

H. Perform anhydrous calcium chloride test, ASTM F 1869. Proceed with application only after substrates have maximum moisture-vapor-emission rate of per flooring manufactures formal and project specific written recommendation.

I. Perform in situ probe test, ASTM F2170. Proceed with application only after substrates do not exceed a maximum potential equilibrium relative humidity per flooring manufacture’s formal and project specific written recommendation.

J. Provide a written report showing test placement and results.

K. Prepare joints in accordance with Section 07 92 00, JOINT SEALANTS and material manufacturer’s instructions.

L. Alkalinity: Measure surface pH in accordance with procedures provided in ASTM F710 or as outlined by qualified testing agency or flooring manufacturer’s technical representative.

M. Tolerances: Subsurface shall meet the flatness and levelness tolerance specified on drawings or recommended by the floor finish manufacturer.

Tolerance shall also not to exceed 1/4” deviation in 10’. As required, install underlayment to achieve required tolerance.

N. Other Subsurface: For all other subsurface conditions, such as wood or metal, contact the floor finish or underlayment manufacturer, as appropriate, for proper preparation practices.

3.3 MOISTURE REMEDIATION COATING:

A. Where results of relative humidity testing (ASTM F2170) exceed the requirements of the specified flooring manufacturer, apply remedial coating as specified to correct excessive moisture condition.

B. Prior to remedial floor coating installation mechanically prepare the concrete surface to provide a concrete surface profile in accordance with ASTM D4259.

09 05 16 - 7

C. Mix and apply moisture remediation coating in accordance with manufacturer’s instructions.

3.4 CEMENTITOUS UNDERLAYMENT:

A. Install cementitious self-leveling underlayment as required to correct surface defects, floor flatness or levelness corrections to meet the tolerance requirements as or detailed on drawings, address non-moving cracks or joints, provide a smooth surface for the installation of floor covering, or meet elevation requirements detailed on drawings.

B. Mix and apply in accordance with manufacturer's instructions.

3.5 PROTECTION

A. Prior to the installation of the finish flooring, the surface of the underlayment should be protected from abuse by other trades by the use of plywood, tempered hardwood, or other suitable protection course

3.6 FIELD QUALITY CONTROL

A. Where specified, field sampling of products shall be conducted by a qualified, independent testing facility.