S06 Att Amend 0002 ET101D - SEVENTH FLOOR DEMOLITION PLAN.pdf
PDF 510 KB Posted
- Solicitation number
- 36C25220B0021
About this file
This document includes a pre-solicitation notice and description for a federal contract opportunity to renovate and expand a dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contract scope involves demolishing an existing vacant ward to construct a new 11,000 square foot dialysis clinic, including trades such as demolition, concrete, electrical, plumbing, mechanical, technical, architectural, and specialty furnishings. The project will abate hazardous materials and install a dedicated air handling unit. The pre-solicitation, specifications, and drawings will be posted on May 13, 2020, with a bid opening on June 16, 2020. The estimated price range is $2-5 million. The NAICS code is 236220 and the period of performance is 540 days. The solicitation will be a 100% SDVOSB set-aside issued by the Department of Veterans Affairs Veterans Health Administration VISN 12.
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D H
D H
N
F
DH
DH
N
N
N N
N
N
N N
N N
N
N N
N
N
NN
N
NNNN
S
SN
N
N N N
N N
NN
NNN
N
NN
N
N N
N
N
N
N N N N N N
N
N
N
N
N
N
P
P
P
N N
N
N
N N
NN
NN
NN
N
S
S
S
S
N
N
B
C
PROJECT AREA A
6 56
WAP
WAP
TVTV
TV TV
WAP
WAP
TV TV
WAP
TV TV
TV
TV
WAP
TV
TV
WAP
CR
CR
RM
RM
ES
ES
WAP
TV
1 2 6
9 10
3 4 5 7 8
11 13 15 17 191612
K
H
E
C
B
A
J
D
ADD
OFFICE
CORRIDOR
C7A14
OFFICE
OFFICE
SUPPLY
7102A
SUPPLY
TOILET
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
TOILET
OFFICE
7125 OFFICE
ORTHO WAITING
OFFICE
HAC
FAC
7A01
STORAGE
TOILET
7134A
TOILET
STR
7-4
TOILET
EC
EC
VP
7-30
ORTHO SUPPLY
SOILED UTILITY
EXAM
EXAM
EXAM
EXAM
EXAM
CAST RM
STORAGE
7148A
STORAGE
EXAM
TOILET
7146A
FAC
7A02
EC
VP
7-33
EC
OFFICE
7110A
OFFICE
7110C
OFFICE
CORRIDOR
C7A13
CORRIDOR
C7A12
CORRIDOR
C7A11
CORRIDOR
C7A11A
CORRIDOR
C7A08
HALLWAY
A0733
CORRIDOR
C7A07
TOILET
7119A
TOILET
7117A
TOILET
7115A
TOILET
7107A
OFFICE
OFFICE
OFFICE
EXAM
EXAM
TOILET
7215A
TOILET
7207A
WAITING
EXAM
TOILET
7150A
TOILET
7252A
OFFICE
STORAGE
7250A
STORAGE
LAB
BREAK
WOUND STAFF
7240C
RESTROOM
WAITING
MED RM
7210A
OFFICE
OFFICE
WAITING
CONTROL
7150B
WOUND
7240B
PROCTO
7240A
TOILET
CORRIDOR
C7A04A
CORRIDOR
C7A01
CORRIDOR
C7A05
CIRRIDOR
C7A04
HAC
VP
7-29
TOILET
TOILET
CORRIDOR
C7B02
STORAGE
OFFICE
EXAM
ELEV
7-A-5
ELEV
7-A-6
ELEV
7-A-8
ELEV
7-A-7
OFFICE
OFFICE
OFFICE
EXAM
EXAM
EXAM
DIRTY UTILITY
7317 ENT OFFICE
OFFICE
OFFICE
EXAM
ENT SUPPLY
7306A
HALLWAY
C7B10
CORRIDOR
C7B10A
STR
7-1
ELEV
7-B-12
ELEV
7-B-9
TC
ELEV
7-B-10
ELEV
7-B-11
ELEV LOBBY
C7B05
CORRIDOR
C7B04
CORRIDOR
C7B03B
TRASH RM
OFFICE
CORRIDOR
C7A06
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
C
R e v it L o c a lF ile s \2
.0
M
P e re z ri n g d u .c o m
.r v t
/5
/2
:5
:3
P
M
ET101D
SEVENTH FLOOR DEMOLITION PLAN
GUIDON DESIGN INC.
1221 N. Pennsylvania Street
Suite 200
Indianapolis, Indiana 46202
317.800.6388
RING & DUCHATEAU, LLP.
17400 W. Capital Drive
Brookfield, WI 53045
414.778.1700
RENOVATE AND EXPAND
DIALYSIS CLINIC
5000 W National Ave, Milwaukee, WI 53295
695-19-131
03/26/2020 MGM MTP
100% CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
SHEET NOTES -
KEYED NOTES -
CONTRACTOR TO NOTE THAT THE INTENT OF DEMOLITION
IS TO REMOVE EXISTING ELEMENTS IN THEIR ENTIRETY TO
ACCOMMODATE NEW CONSTRUCTION. ITEMS NOTED FOR
DEMOLITION ARE FOR REFERENCE AND DO NOT
REPRESENT EVERY ITEM TO BE DEMOLISHED.
CONTRACTOR TO ENSURE ALL ITEMS LOCATED WITHIN
SCOPE BOUNDARY NECESSARY FOR INSTALLATION OF
NEW CONSTRUCTION ARE REMOVED AND DISPOSED OF.
EQUIPMENT SHOWN ON DEMOLITION PLAN IS EXISTING TO
BE REMOVED UNLESS NOTED OTHERWISE. IN ADDITION TO
REMOVING DEVICES, REMOVE ASSOCIATED ELECTRICAL
CIRCUITS BACK TO SOURCE. REFER TO THE
SPECIFICATIONS FOR ELECTRICAL DEMOLITION
REQUIREMENTS.
INFORMATION SHOWN ON THE PLANS WAS GATHERED
FROM FIELD OBSERVATION AND EXISTING DRAWINGS.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS
AND IS RESPONSIBLE FOR ANY ADDITIONAL TRACING,
REMOVING, RELOCATION AND EXTENDING CIRCUITS AND
DEVICES NECESSARY TO MAINTAIN CONTINUITY OF
EXISTING EQUIPMENT NOT IN THE AREA OF WORK.
CONTRACTOR SHALL FIELD VERIFY EXACT DEMOLITION
REQUIREMENTS AND INCLUDE ASSOCIATED COSTS.
ABANDONED WIRING, CONDUITS, FITTING, BOXES, &
SUPPORTS. SHALL BE REMOVED FROM THE DEVICES BACK
TO THE RESPECTIVE SOURCE PANEL. UPDATE PANEL
DIRECTORIES. REFER TO THE SPECIFICATIONS FOR
ADDITIONAL ELECTRICAL DEMOLITION REQUIREMENTS.
DASHED WALLS INDICATE EXISTING WALLS BEING
REMOVED. REFER TO ARCHITECTURAL DEMOLITION AND
PHASING PLANS FOR THE EXACT EXTENT OF GENERAL
CONSTRUCTION DEMOLITION REQUIRED.
CONTRACTOR SHALL SUPPORT AND PROTECT ELECTRICAL
EQUIPMENT EXISTING TO REMAIN, INCLUDING BUT NOT
LIMITED TO CONDUITS, WIRING, DEVICES, AND FIXTURES AS
REQUIRED.
REFER TO DEMOLITION DRAWINGS OF OTHER TRADES
WHERE MOTORS, CONTROL PANELS, AND OTHER LOADS
THAT HAVE AN ELECTRICAL CONNECTION ARE BEING
REMOVED, INCLUDE THE DISCONNECTION AND REMOVAL
OF ASSOCIATED ELECTRICAL FEEDS, CIRCUITS, AND
LOOSE CONTROL EQUIPMENT IN THIS CONTRACT.
CONTRACTOR SHALL COORDINATE REMOVAL AND
REPLACEMENT OF ELECTRICAL CEILING DEVICES (I.E.
LIGHT FIXTURES, FIRE ALARM, ETC.) OUTSIDE THE AREA OF
WORK TO ACCOMMODATE THE NEW CONSTRUCTION.
CONTRACTOR SHALL REFER TO THE ARCHITECTURAL
PLANS FOR LOCATIONS OF SMOKE PARTITIONS AND FIRE
RATED WALLS, FLOORS, AND CEILINGS AND THEIR HOURLY
RATINGS. CONTRACTOR SHALL PROVIDE FIRE STOPPING
FOR CONDUITS AND OTHER PENETRATIONS COVERED
UNDER DIVISION 26 IN THESE SURFACES. FIRESTOPPING
SHALL MEET OR EXCEED THE RATING OF THE SURFACE
BEING PENETRATED. REFER TO SPECIFICATION 07 84 00
FOR ADDITIONAL INFORMATION.
ABOVE CEILING DEMOLITION, NEW AND RESTORATION
WORK ON THE 6TH, 7TH OR 8TH FLOOR - WITH THE
EXCEPTION OF UTILITY OUTAGES THAT AFFECT PATIENT
CARE, DISRUPT HOSPITAL OPERATIONS OR REQUIRE A
CURTAILMENT OF SERVICES MEMO - CAN BE COMPLETED
DURING ANY SHIFT ONCE INFECTION CONTROL BARRIERS
ARE ESTABLISHED AND APPROVED PER THE SUBMITTED
PHASING AND WORKPLAN. THE CONTRACTOR MAY WORK
OFF-SHIFT AS WELL TO COMPLETE CONSTRUCTION
ACTIVITIES IN AN EXPEDITED MANNER. UTILITY OUTAGES
THAT AFFECT PATIENT CARE, DISRUPT HOSPITAL
OPERATIONS OR REQUIRE A CURTAILMENT OF SERVICES
MEMO MUST BE COMPLETED ON 2ND OR 3RD SHIFTS ON
WEEKDAYS OR ANYTIME ON WEEKEND (SAT & SUN).
SEE ARCHITECTURAL PLANS FOR PROJECT PHASING
DRAWINGS AND NOTES.
VA TO REMOVE WAP DEVICES PRIOR TO DEMOLITION.
COORDINATE REMOVAL OF DEVICES PRIOR TO
DEMOLITION.
1.
2.
3.
4.
5.
6.
7.
EXISTING "DUKANE" NURSE CALL AMPLIFIER TO BE
REMOVED.
EXISTING "DUKANE" CIRCUIT FUSE PANEL TO BE REMOVED.
EXISTING RECESSED FIRE ALARM JUNCTION BOX.
EXISTING RECESSED PHONE CABINET.
EXISTING "OLYMPUS" VIDEO SYSTEM.
EXISTING "DUKANE" NURSE CALL CIRCUIT FUSE CABINET.
EXISTING 110 PHONE PUNCH DOWN BLOCK.
SCALE: 1" = 100'-0"
KEY PLAN
SCALE: 1/8" = 1'-0"ET101D
1 SEVENTH FLOOR PLAN - DEMOLITION TECHNOLOGY
N
Revisions: Date:
ADDENDUM 02 06/05/2020
| Sheets |
| ET101D - SEVENTH FLOOR DEMOLITION PLAN |
File details come from the government source that posted it. Updated .