S06 Att Amend 0002 00 01 10 - TABLE OF CONTENTS.pdf

PDF 164 KB Posted

Attached to
Z2DA--Project # 695-19-131 Renovate and Expand Dialysis Clinic Clement J. Zablocki VA Medical Center Milwaukee, WI
Solicitation number
36C25220B0021
Issued by

About this file

This document includes a table of contents for construction specifications and drawings for a project to renovate and expand a dialysis clinic, as well as a pre-solicitation notice for the related federal contract opportunity.

The pre-solicitation notice is for Project #695-19-131 to renovate and expand the dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. Services required include demolition, concrete, electrical, plumbing, mechanical, architectural, and specialty furnishings. The total space to be renovated is approximately 11,000 square feet. Hazardous materials abatement is also required. The estimated price range for the project is between $2,000,000 to $5,000,000. The solicitation is scheduled to post on May 13, 2020 with a bid opening on June 16, 2020. This is a 100% Service Disabled Veteran Owned Small Business set-aside issued by the Department of Veterans Affairs Veterans Health Administration VISN 12.

View the file

Other files

File Type Posted
Amend 0005 00 01 10 TABLE OF CONTENTS.pdf PDF
Amend 0005 22 67 19.16 REVERSE-OSMOSIS WATER EQUIPMENT.pdf PDF
Amend 0005 08 71 13.11 LOW ENERGY DOOR OPERATORS.pdf PDF
S06 36C25220B0021 0005.pdf PDF
Amend 0005 01 91 00 COMMISSIONING REQUIREMENTS.pdf PDF
Amend 0005 01 01 10 SN SPECIAL NOTES.pdf PDF
Amend 0005 11 73 00 CEILING MOUNT PATIENT LIFT.pdf PDF
Amend 0005 14 92 00 PNEUMATIC TUBE SYSTEM.pdf PDF
Amend 0003 Photos Revised.pdf PDF
S06 36C25220B0021 0004.pdf PDF
AI601 - FINISH SCHEDULES.pdf PDF
Wage Determination 6.19.20.pdf PDF
Amend 0003 Photos.pdf PDF
SECTION 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
36C25220B0021 0003.pdf PDF
S06 Att Amend 0002 EP100 - BASEMENT FLOOR OVERALL PLAN.pdf PDF
S06 Att Amend 0002 AI201 - INTERIOR FINISHES ELEVATIONS.pdf PDF
S06 Att Amend 0002 AE601 - DOOR_WINDOW SCHEDULE.pdf PDF
S06 36C25220B0021 0002.pdf PDF
S06 Att Amend 0002 28 05 13 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY.pdf PDF
S06 Att Amend 0002 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
S06 Att Amend 0002 01 74 19 - CONSTRUCTION WASTE MANAGEMENT.pdf PDF
S06 Att Amend 0002 GC101 - INFECTION CONTROL_PHASING PLAN.pdf PDF
S06 Att Amend 0002 09 05 16 - FLOOR PREP1.pdf PDF
S06 Att Amend 0002 ET102 - SEVENTH FLOOR SYSTEMS PLAN - DIVISION 28.pdf PDF
S06 Att Amend 0002 AD101 - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 MD101 - MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR.pdf PDF
S06 Att Amend 0002 10 14 00 - SIGNAGE.pdf PDF
S06 Att Amend 0002 12 24 00 - WINDOW SHADES.pdf PDF
S06 Att Site Visit Sign In 5.28.20.pdf PDF
S06 Att Amend 0002 03 30 53 - CAST-IN-PLACE CONCRETE.pdf PDF
S06 Att Amend 0002 QH101 - SEVENTH FLOOR EQUIPMENT PLAN.pdf PDF
S06 Att Amend 0002 01 91 00 - COMMISSIONING REQUIREMENTS.pdf PDF
S06 Att Amend 0002 22 07 11 - PLUMBING INSULATION.pdf PDF
S06 Att Amend 0002 ET101D - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 22 11 00 - FACILITY WATER DISTRIBUTION.pdf PDF
S06 Att Amend 0002 AE501 - BUILDING DETAILS.pdf PDF
S06 Att Amend 0002 AI901 - SIGNAGE PLAN.pdf PDF
S06 Att Amend 0002 AI101 - FINISH WALL TREATMENT PLAN.pdf PDF
S06 Att Amend 0002 EP401 - ONE LINE DIAGRAM.pdf PDF
S06 Att Wage Determination 6.5.20.pdf PDF
Site Visit Sign In 5.20.20.pdf PDF
36C25220B0021 0001.docx DOCX document
Amend 0001 Specification 22 63 00.pdf PDF
Amend 0001 Specification 00 01 10.pdf PDF
Amend 0001 Specification 08 14 00.pdf PDF
Amend 0001 Specification 09 06 00.pdf PDF
Amend 0001 J_A Patient Ceiling Lift.pdf PDF
36C25220B0021-011.pdf PDF
36C25220B0021-012.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Milwaukee VAMC 08-01-19

695-19-131 Renovate & Expand Dialysis Clinic 100% Construction Documents

Milwaukee, WI 53295 March 26, 2020

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18

01 01 10 SN Special Notes

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 02-17

01 74 19 Construction Waste Management 09-13

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 04-19

02 83 33.13 Lead-Based Paint Removal and Disposal 08-16

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

DIVISION 05 – METALS

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 10-17

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

00 01 10-2

08 31 13 Access Doors and Frames 02-16

08 41 13 Aluminum-Framed Entrances and Storefronts 08-16

08 71 00 Door Hardware 08-19

08 71 13.11 Low Energy Power Assist Door Operators 08-16

08 80 00 Glazing 10-15

08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 06-18

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 02-16

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 67 23.40 Resinous Poured in Place Resilient Flooring 09-18

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 10-15

10 14 00 Signage 10-15

10 21 23 Cubicle Curtain Tracks 05-15

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

11 05 12 General Motor Requirements for Equipment 11-11

11 73 00 Ceiling Mounted Patient Lift System 01-17

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17

12 24 21 Lightproof Shades 05-15

12 32 00 Manufactured Wood Casework 09-15

12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

DIVISION 21- FIRE SUPPRESSION

21 05 11 Common Work Results for Fire Suppression 11-09

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

00 01 10-3

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 12 General Motor Requirements for Plumbing Equipment 09-15

22 05 19 Meters and Gages for Plumbing Piping 09-15

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-15

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 09-15

22 13 00 Facility Sanitary and Vent Piping 09-15

22 14 00 Facility Storm Drainage 09-15

22 31 11 Water Softeners 09-15

22 40 00 Plumbing Fixtures 09-15

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15

22 67 19.16 Reverse-Osmosis Water Equipment 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

08-17

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 07 11 HVAC and Boiler Plant Insulation 02-15

23 08 00 Commissioning of HVAC Systems 11-16

23 09 23 Direct-Digital Control System for HVAC 09-11

23 09 94 Point Chart

23 21 13 Hydronic Piping 08-17 23 21 23 Hydronic Pumps 08-17

23 22 13 Steam and Condensate Heating Piping 08-17

23 22 23 Steam Condensate Pumps 07-15

23 25 00 HVAC Water Treatment 07-15 23 31 00 HVAC Ducts and Casings 03-13

23 34 00 HVAC Fans 02-15

23 36 00 Air Terminal Units 02-15

23 37 00 Air Outlets and Inlets 02-15

23 40 00 HVAC Air Cleaning Devices 02-12

23 73 00 Indoor Central-Station Air-Handling Units 07-15

23 82 00 Convection Heating and Cooling Units 04-11

23 82 16 Air Coils 07-15

23 84 13 Humidifiers 07-15

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 12 Electrical Equipment Mounting Height 04-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 73 Overcurrent Protective Device Coordination Study 01-18

00 01 10-4

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 22 00 Low-Voltage Transformers 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 29 11 Motor Controllers 01-18

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

27 51 16 Public Address and Mass Notification Systems 10-18

27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 26 00 Electronic Personal Protection System 09-11

28 31 00 Fire Detection and Alarm 10-11

File details come from the government source that posted it. Updated .