About this file

This document provides a pre-solicitation notice for a construction project to renovate and expand the dialysis clinic at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The contractor shall demolish and reconstruct ward 7AS of building 111 to create a new 11,000 square foot space to house the dialysis clinic, relocating it from the fifth floor. Work includes demolition, concrete, electrical, plumbing, HVAC, architectural, and specialty furnishings. Hazardous materials abatement is required. The project budget is between $2-5 million. The NAICS code is 236220 and size standard is $39.5 million. The period of performance is 540 calendar days from notice to proceed. The solicitation will post on May 13, 2020 with bid opening on June 16, 2020. A pre-bid site visit will be scheduled. Pursuant to Public Law 109-461, this is a 100% service-disabled veteran-owned small business set-aside. Offerors must represent SDVOSB/VOSB eligibility at submission.

View the file

Other files

File Type Posted
Amend 0005 00 01 10 TABLE OF CONTENTS.pdf PDF
Amend 0005 22 67 19.16 REVERSE-OSMOSIS WATER EQUIPMENT.pdf PDF
Amend 0005 08 71 13.11 LOW ENERGY DOOR OPERATORS.pdf PDF
S06 36C25220B0021 0005.pdf PDF
Amend 0005 01 91 00 COMMISSIONING REQUIREMENTS.pdf PDF
Amend 0005 01 01 10 SN SPECIAL NOTES.pdf PDF
Amend 0005 11 73 00 CEILING MOUNT PATIENT LIFT.pdf PDF
Amend 0005 14 92 00 PNEUMATIC TUBE SYSTEM.pdf PDF
Amend 0003 Photos Revised.pdf PDF
S06 36C25220B0021 0004.pdf PDF
Wage Determination 6.19.20.pdf PDF
Amend 0003 Photos.pdf PDF
SECTION 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
36C25220B0021 0003.pdf PDF
S06 Att Amend 0002 00 01 10 - TABLE OF CONTENTS.pdf PDF
S06 Att Amend 0002 EP100 - BASEMENT FLOOR OVERALL PLAN.pdf PDF
S06 Att Amend 0002 AI201 - INTERIOR FINISHES ELEVATIONS.pdf PDF
S06 Att Amend 0002 AE601 - DOOR_WINDOW SCHEDULE.pdf PDF
S06 36C25220B0021 0002.pdf PDF
S06 Att Amend 0002 28 05 13 - CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY.pdf PDF
S06 Att Amend 0002 10 21 23 - CUBICLE CURTAIN TRACKS.pdf PDF
S06 Att Amend 0002 01 74 19 - CONSTRUCTION WASTE MANAGEMENT.pdf PDF
S06 Att Amend 0002 GC101 - INFECTION CONTROL_PHASING PLAN.pdf PDF
S06 Att Amend 0002 09 05 16 - FLOOR PREP1.pdf PDF
S06 Att Amend 0002 ET102 - SEVENTH FLOOR SYSTEMS PLAN - DIVISION 28.pdf PDF
S06 Att Amend 0002 AD101 - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 MD101 - MECHANICAL DEMOLITION FLOOR PLAN - 7TH FLOOR.pdf PDF
S06 Att Amend 0002 10 14 00 - SIGNAGE.pdf PDF
S06 Att Amend 0002 12 24 00 - WINDOW SHADES.pdf PDF
S06 Att Site Visit Sign In 5.28.20.pdf PDF
S06 Att Amend 0002 03 30 53 - CAST-IN-PLACE CONCRETE.pdf PDF
S06 Att Amend 0002 QH101 - SEVENTH FLOOR EQUIPMENT PLAN.pdf PDF
S06 Att Amend 0002 01 91 00 - COMMISSIONING REQUIREMENTS.pdf PDF
S06 Att Amend 0002 22 07 11 - PLUMBING INSULATION.pdf PDF
S06 Att Amend 0002 ET101D - SEVENTH FLOOR DEMOLITION PLAN.pdf PDF
S06 Att Amend 0002 22 11 00 - FACILITY WATER DISTRIBUTION.pdf PDF
S06 Att Amend 0002 AE501 - BUILDING DETAILS.pdf PDF
S06 Att Amend 0002 AI901 - SIGNAGE PLAN.pdf PDF
S06 Att Amend 0002 AI101 - FINISH WALL TREATMENT PLAN.pdf PDF
S06 Att Amend 0002 EP401 - ONE LINE DIAGRAM.pdf PDF
S06 Att Wage Determination 6.5.20.pdf PDF
Site Visit Sign In 5.20.20.pdf PDF
36C25220B0021 0001.docx DOCX document
Amend 0001 Specification 22 63 00.pdf PDF
Amend 0001 Specification 00 01 10.pdf PDF
Amend 0001 Specification 08 14 00.pdf PDF
Amend 0001 Specification 09 06 00.pdf PDF
Amend 0001 J_A Patient Ceiling Lift.pdf PDF
36C25220B0021-011.pdf PDF
36C25220B0021-012.pdf PDF
Show 40 more

Latest 50 of 72 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SPECIAL FACED CEILING PANELS

2. PROVIDE SPECIAL COATING - HIGH BUILD GLAZED COATING ON PAINTED

SURFACES.

3. PROVIDE 4" HIGH INTEGRAL COVE BASE, UON. REFER TO FINISH WALL

TREATMENT PLAN FOR ADDITIONAL INFORMATION.

ROOM FINISH SCHEDULE COMMENTS

1. PROVIDE SUSPENSION AND GRID SYSTEM. PROVIDE HOLD-DOWN CLIPS IN

ISOLATION ROOMS.

2. PROVIDE "ON THE RIGHT TRACK" SYSTEM

3. FIELD PAINT - GENERAL

4. HOLLOW METAL DOORS AND FRAMES

5. ACCENT - GENERAL

6. FIELD PAINT - OFFICES

7. ACCENT - OFFICES

8. 3' HIGH / .04MM THICK ROLL

9. RESILIENT/RUBBER/LVT TO RESILIENT/RUBBER/LVT FLOORING TRANSITION

10. RESILIENT/RUBBER/LVT TO CONCRETE FLOORING TRANSITION

11. VERIFY SIZES IN FIELD

12. PROVIDE MOUNTING HARDWARE

13. CUT TO 6" X 12"

14. 4' HIGH / .04MM THICK ROLL

15. COLOR MATCH HEAT WELDED SEAM

16. NOT USED

17. CARPET TO RESILIENT/RUBBER/LVT FLOORING TRANSITION

18. RESINOUS TO RESILIENT/RUBBER/LVT FLOORING TRANSITION

FINISH SCHEDULE COMMENTS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD

A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

C U s e rs

\d v a lla n d in g h a m \D o c u m e n ts

\1

.1

.1

A v d v a lla n d in g h a m g u id o n d e s ig n .c o m

.r v t

/8

/2

:2

:5

A M

AI601

FINISH SCHEDULES

GUIDON

1221 N. PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

317.800.6388

RING & DUCHATEAU, LLP.

17400 W. CAPITOL DRIVE

BROOKFIELD, WI 53045

414.778.1700

RENOVATE AND EXPAND

DIALYSIS CLINIC

5000 W National Ave, Milwaukee, WI 53295

695-19-131

03/26/2020

100% CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

FINISH SCHEDULE

FINISH MARK FINISH MANUFACTURER PATTERN/STYLE COLOR SIZES COMMENTS

AT-1 ACOUSTICAL CEILING TILE ARMSTRONG DUNE LAY-IN WHITE 24" X 24" 1

AT-2 ACOUSTICAL CEILING TILE ARMSTRONG ULTIMA LAY-IN WHITE 24" X 24" 1

CC-1 CUBICLE CURTAIN MOMENTUM RESPITE VESSEL 2

CG-1 CORNER GUARD INPRO 160 SERIES EGGSHELL 0111 2" WINGS

CPT-1 CARPET TILE PATCRAFT ARTEFACT ETCHED #I0512 UNDERLING LAYER #00480 12" X 48"

HR-1 HANDRAIL INPRO 800W AMERICAN TEAK 0553

LVT-1 LUXURY VINYL TILE MILLIKEN APPLEWOOD APP77 5" X 48"

LVT-2 LUXURY VINYL TILE BENTLEY MILLS CANVAS PEWTER LINEN 19" X 19"

P-1 PAINT SHERWIN WILLIAMS EGGSHELL ACCESSIBLE BEIGE SW 7036 3

P-2 PAINT SHERWIN WILLIAMS SEMI-GLOSS NUANCE SW 7049 4

P-3 PAINT SHERWIN WILLIAMS EGGSHELL SVELTE SAGE SW 6164 5

P-4 PAINT SHERWIN WILLIAMS EGGSHELL CRUSHED ICE SW 7647 6

P-5 PAINT SHERWIN WILLIAMS EGGSHELL UNCERTAIN GREY SW 6234 7

P-6 PAINT SHERWIN WILLIAMS EGGSHELL TRANQUIL AQUA SW 7611

PL-1 PLASTIC LAMINATE FORMICA MATTE FINISH PUMICE 858-58

PL-2 PLASTIC LAMINATE FORMICA WOODBRUSH FINISH WEATHERED ASH 8842-WR

PL-3 PLASTIC LAMINATE FORMICA MATTE FINISH CITADEL 1097-58

PL-4 PLASTIC LAMINATE WILSONART MATTE FINISH GREY 1500-60

PL-5 PLASTIC LAMINATE WILSONART ANODIZED SATIN BRUSHED NICKEL 6202

RB-1 RESILIENT BASE JOHNSONITE TRADITIONAL COVE 29 MOON ROCK 4"

RES-1 RESINOUS FLOORING DUR-A-FLEX HYBRI-FLEX EC MACRO-CHIP GLACIER

RF-1 RUBBER FLOORING NORA NORAPLAN ENVIRONCARE TOAST #7055

RF-2 RUBBER FLOORING NORA NORAPLAN ENVIRONCARE FIREWORKS #7034

RF-3 RUBBER FLOORING NORA NORAPLAN ENVIRONCARE GRADUATION #7077

RF-4 RUBBER FLOORING NORA NORAPLAN ENVIRONCARE PARMERS MARKET #7061

RF-5 RUBBER FLOORING NORA NORAPLAN ENVIRONCARE SLEIGH RIDE #7032

RWC-1 RIGID VINYL WALL PROTECTION INPRO EGGSHELL 0111 8

RWC-2 RIGID VINYL WALL PROTECTION INPRO EGGSHELL 0111 14

S-1 SOLID SURFACE WILSONART SATIN FINISH MYSTIQUE 9200CS

S-2 SOLID SURFACE AVONITE SATIN FINISH MOON CRYSTAL F1-7501

S-3 SOLID SURFACE AVONITE SATIN FINISH MORNING TUNDRA 7503

TS-1 TRANSITION STRIP 9

TS-2 TRANSITION STRIP 10

TS-3 TRANSITION STRIP 17

TS-4 TRANSITION STRIP 18

WC-1 WINDOW COVERING TBD HORIZONTAL BLINDS SELECTED FROM FULL RANGE 11

WC-2 WINDOW COVERING TBD ROLLER SHADES SELECTED FROM FULL RANGE 11

WC-3 WINDOW COVERING TBD ROLLER SHADES - BLACK OUT SELECTED FROM FULL RANGE 11

WSF-1 WELDED SHEET FLOORING TEKNOFLOR FORESTSCAPES 73903 ENGLISH WALNUT 15

WSF-2 WELDED SHEET FLOORING TEKNOFLOR FORESTSCAPES 52210 ABACOA 15

WSF-3 WELDED SHEET FLOORING PATCRAFT MEANING 1446V INTEGRATE 00115 15

ROOM FINISH/SIGNAGE SCHEDULE

ROOM NUMBER ROOM NAME FLOOR BASE WALL CEILING COMMENTS

7-4 STAIR

7A01 FEC RES-1 RES-1 N/A N/A

7100 WAITING ROOM LVT-1, LVT-2 RB-1 P-1, P-3, RWC-1, RWC-3 AT

7101 PUBLIC TLT WSF-3 WSF-3 P-5, RWC-2 AT 3

7102 TRAINING / CONSULT WSF-1 RB-1 P-1, P-3 AT

7103 EXAM WSF-1 RB-1 P-1, P-3, RWC-1 AT

7104 RECEPTION WSF-1 RB-1 P-1, P-5 AT

7105 INTAKE WSF-2 RB-1 P-1, P-3, RWC-1 AT

7106-1 BAY WSF-1, WSF-2 WSF-2 P-1, P-6, RWC-1 P, AT 3

7106-2 BAY WSF-1, WSF-2 WSF-2 P-6 P, AT 3

7106-3 BAY WSF-1, WSF-2 WSF-2 P-6 P, AT 3

7106-4 BAY WSF-1, WSF-2 WSF-2 P-6 P, AT 3

7106-5 BAY WSF-1, WSF-2 WSF-2 P-1, P-6, RWC-1 P, AT 3

7110-6 BAY WSF-1, WSF-2 WSF-2 P-1, P-3, RWC-1 P, AT 3

7110-7 BAY WSF-1, WSF-2 WSF-2 P-3 P, AT 3

7110-8 BAY WSF-1, WSF-2 WSF-2 P-1, P-3, RWC-1 P, AT 3

7113 NURSE STATION WSF-2 RB-1 P-1, P-6, RWC-1 P, AT 3

7114-9 BAY WSF-1, WSF-2 RB-1 P-1, P-3, RWC-1 P, AT 3

7114-10 BAY WSF-1, WSF-2 RB-1 P-1, P-3, RWC-1 P, AT 3

7116 MEDS WSF-3 RB-1 P-1, RWC-2 AT

7117 DIALYSIS & BIO MED TECH WSF-3 WSF-3 P-1, RWC-2, SC AT 1, 2, 3

7119 EQUIPMENT STORAGE WSF-3 RB-1 P-1, RWC-2 AT

7120 ELEC

7121 SOILED UTILITY WSF-3 WSF-3 P-1, RWC-2, SC AT 1, 2, 3

7122 ALCOVE WSF-1 RB-1 P-1, P-6, RWC-2 AT

7123 LINEN WSF-3 RB-1 P-1, RWC-2 AT

7124 STERILE SUPPLY WSF-3 RB-1 P-1, RWC-2, SC AT 1, 2

7125 BREAK ROOM LVT-2 RB-1 P-4, P-5 AT

7126 ELEC

7128 ELEC

7129 STAFF TLT WSF-3 WSF-3 P-5, RWC-2 AT 3

7130 WORK ROOM LVT-2 RB-1 P-4, P-5 AT

7131 SHARED OFFICE LVT-2 RB-1 P-4, P-5 AT

7132 HAC RES-1 RES-1 N/A N/A

7133 PATIENT TLT WSF-3 WSF-3 P-5, RWC-2 AT 3

7134 SEPARATION ROOM WSF-1, WSF-2 WSF-1, WSF-2 P-1, P-3, RWC-1, SC AT 1, 2, 3

7134A PATIENT TLT WSF-3 WSF-3 P-5, RWC-2, SC P, SC 2, 3

7135 SEPARATION ROOM WSF-1, WSF-2 WSF-1, WSF-2 P-1, P-3, RWC-1, SC AT 1, 2, 3

7135A PATIENT TLT WSF-3 WSF-3 P-5, RWC-2, SC P, SC 1, 2, 3

7136 ISOLATION ROOM WSF-1, WSF-2 WSF-1, WSF-2 P-1, P-3, RWC-1, SC AT 1, 2, 3

7136A PATIENT TLT WSF-3 WSF-3 P-5, RWC-2, SC P, SC 1, 2, 3

7137 NURSE WORKSTATION WSF-1, WSF-2 RB-1 P-1, P-6, RWC-1 P, AT

7139 WATER TREATMENT RES-1 RES-1 P-1, RWC-2, SC N/A 2

7140 MECHANICAL RES-1 RES-1 P-1 AT

7150 MSA WSF-1 RB-1 P-1, P-6 AT

7151 ELEC

7152 URINALYSIS LAB WSF-3 RB-1 P-1, SC AT 1

7153 OFFICE CPT-1 RB-1 P-4, P-5 AT

7154 OFFICE CPT-1 RB-1 P-4, P-5 AT

7155 OFFICE CPT-1 RB-1 P-4, P-5 AT

7156 OFFICE CPT-1 RB-1 P-4, P-5 AT

7157 OFFICE CPT-1 RB-1 P-4, P-5 AT

7158 OFFICE CPT-1 RB-1 P-4, P-5 AT

7159 CLOSET WSF-1 RB-1 P-1 AT

C7A08 CORRIDOR WSF-1 RB-1 P-1, P-6, RWC-1 AT

C7A10 CORRIDOR WSF-1 RB-1 P-1, RWC-1 AT

C7A10A CORRIDOR RES-1 RES-1 P-1, RWC-1 AT

C7A11 CORRIDOR RB-1 P-1, P-6, RWC-1 AT

C7A12 CORRIDOR WSF-1, WSF-2 RB-1 P-1, RWC-1 AT

C7A12B CORRIDOR WSF-1, WSF-2 RB-1 P-1, P-6, RWC-1 AT

C7A13 CORRIDOR WSF-1, WSF-2 RB-1 P-1, RWC-1 AT

C7A14 CORRIDOR RF-1, RF-2 RB-1 P-1, RWC-1 AT

Revisions: Date:

WSF-1

ADDENDUM 06/05/2020

VHAMIWBeierJ Text Box

File details come from the government source that posted it. Updated .