Specification 096536 13 Static Dissipative Flooring.pdf
PDF 172 KB Posted
- Attached to
- Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
- Solicitation number
- 36C25023B0005
About this file
This document package includes a specification section and federal contract opportunity pre-solicitation notice. The specification section outlines requirements for static dissipative resilient flooring and accessories at the Ann Arbor VA Medical Center in Michigan. Materials must meet standards for fire resistance, smoke generation, critical radiant flux, and electrical resistance. The project includes installation of 12"x12" vinyl composition tile flooring and wall base. The pre-solicitation notice is for project 506-21-102 to modernize Building 22 at the facility, with an estimated cost between $5-10 million. The opportunity is a 100% SDVOSB set-aside to be awarded via firm fixed price contract. The solicitation is planned for release on November 30th via SAM.gov. Offerors must register in SAM and VIP databases prior to response. The response due date and other details will be in the forthcoming solicitation. The Department of Veterans Affairs is the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum #2 Ann Arbor VAMC - Modernize Building 22 #506-21-102
096536.13 - 1
STATIC DISSIPATIVE RESILIENT FLOORING
SECTION 09 65 36.13
STATIC DISSIPATIVE RESILIENT FLOORING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Flooring and accessories as shown on the drawings and schedules and as indicated by the requirements of this section. See Finish Floor Plan, SD-1.
B. Related Documents
1. Drawings and General Provisions of the Contract apply to the work of this section.
C. Related Sections:
1. Other Division 9 sections for floor finishes related to this section but not the work of this section
2. Division 6 Wood and Plastics; not the work of this section
3. Division 7 Thermal and Moisture Protection; not the work of this section
1.2 REFERENCES
A. ASTM International:
1. ASTM E 648 Standard Test Method for Critical Radiant Flux of
Floor-Covering Systems Using a Radiant Heat Energy Source
2. ASTM E 662 Standard Test Method for Specific Optical Density of Smoke Generated by Solid Materials
3. ASTM F 710 Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring
4. ASTM F 1066 Standard Specification for Vinyl Composition Tile
5. ASTM F 1482, Standard Guide to Wood Underlayment Products
Available for Use Under Resilient Flooring
6. ASTM F 1861 Standard Specification for Resilient Wall Base
7. ASTM F 1869 Standard Test Method for Measuring Vapor Emission
Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
8. ASTM F 2170 Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
B. National Fire Protection Association (NFPA):
1. NFPA 253 Standard Method of Test for Critical Radiant Flux of
Floor Covering Systems Using a Radiant Heat Energy Source
2. NFPA 258 Standard Test Method for Measuring the Smoke Generated by Solid Materials
096536.13 - 2
C. Canadian Standards
1. CAN/ULC-S102.2 Surface Burning Characteristics of Flooring, Floor Covering and Miscellaneous Materials and Assemblies
D. ANSI/ESD Standards
1. ANSI/ESD STM 7.1: Floor Materials—Resistive Characterization of Materials
2. ANSI/ESD STM 97.1: Floor Materials and Footwear—Resistance in Combination with a Person
3. ANSI/ESD STM 97.2: Floor Materials and Footwear Voltage Measurement in Combination with a Person
1.3 SYSTEM DESCRIPTION
A. Performance Requirements: Provide flooring which has been manufactured, fabricated and installed to performance criteria certified by manufacturer without defects, damage, or failure.
B. Administrative Requirements
1. Pre-installation Meeting: Conduct an on-site pre-installation meeting to verify project requirements, substrate conditions, manufacturer’s installation instructions and manufacturer’s warranty requirements. Comply with Division 1 Project
Management and Coordination (Project Meetings) Section.
C. Test Installations: Install at the project site a job mock-up using acceptable products and manufacturer approved installation methods, including concrete substrate testing. Obtain Owner’s and
Consultant’s acceptance of finish color, texture and pattern, and workmanship standards.
D. Sequencing and Scheduling
1. Install flooring and accessories after the other finishing operations, including painting, have been completed. Close spaces to traffic during the installation of the flooring.
2. Do not install flooring over concrete slabs until they are sufficiently dry to achieve a bond with the adhesive, in accordance with the manufacturer's recommended bond, moisture tests and pH test.
1.4 SUBMITTALS
A. Submit shop drawings, seaming plan, coving details, and manufacturer's technical data, installation and maintenance instructions for flooring and accessories.
096536.13 - 3
B. Submit the manufacturer's standard samples showing the required colors for flooring and applicable accessories.
C. Submit Safety Data Sheets (SDS) available for adhesives, moisture mitigation systems, primers, patching/leveling compounds, floor finishes (polishes) and cleaning agents and Material Information
Sheets for flooring products.
D. If required, submit the manufacturer's certification that the flooring has been tested by an independent laboratory and complies with the required fire tests.
E. Closeout Submittals: Submit the following:
1. Operation and Maintenance Data: Operation and maintenance data for installed products in accordance with Division 1
Closeout Submittals (Maintenance Data and Operation Data)
Section. Include methods for maintaining installed products, and precautions against cleaning materials and methods detrimental to finishes and performance.
2. Warranty: Warranty documents specified herein
1.5 QUALITY ASSURANCE
A. Single-Source Responsibility: provide types of flooring and accessories supplied by one manufacturer, including moisture mitigation systems, primers, leveling and patching compounds, and adhesives.
B. Select an installer who is experienced and competent in the installation of resilient static dissipative vinyl composition tile flooring and the use of same manufacturer’s subfloor preparation products.
1. Engage installers certified as the manufacturer’s Certified Installers
2. Confirm installer's certification by requesting their credentials C. Fire Performance Characteristics: Provide resilient vinyl composition tile flooring with the following fire performance characteristics as determined by testing material in accordance with ASTM test methods indicated below by a certified testing laboratory or other testing agency acceptable to authorities having jurisdiction:
1. ASTM E 648 Critical Radiant Flux of 0.45 watts per sq. cm. or greater, Class I
2. ASTM E 662 (Smoke Generation) Maximum Specific Optical Density of 450 or less
096536.13 - 4
3. CAN/ULC-S102.2 – Flame Spread Rating and Smoke Developed – Results as tested.
D. Provide flooring material to meet the following electrical properties when installed according to manufacturer’s instructions with the required adhesive, copper strips and SDT floor finish:
1. ANSI/ESD STM 7.1 Floor Materials—Resistive Characterization of Materials results between 106 and 109 ohms, point-to-point and point-to-ground.
2. ASTM F 150 Electrical Resistance of Flooring between 106 and 109 ohms, point-to-point and point-to-ground.
3. ANSI/ESD STM 97.1: Floor Materials and Footwear—Resistance in Combination with a Person results between 106 and 109 ohms
(average) with dissipative footware and when using heel straps.
4. ANSI/ESD STM 97.2: Floor Materials and Footwear Voltage Measurement in Combination with a Person – 30 volts (average) with dissipative footwear at 12% relative humidity.
5. Static Dissipation @ 12% RH: Flooring in combination with a person wearing dissipative footwear – 1000 to 100 volts: 0.2 seconds maximum.
1.6 DELIVERY, STORAGE AND HANDLING
A. Comply with Division 1 Product Requirements Sections B. Comply with manufacturer's ordering instructions and lead time requirements to avoid construction delays.
C. Deliver materials in good condition to the jobsite in the manufacturer's original unopened containers that bear the name and brand of the manufacturer, project identification, and shipping and handling instructions.
D. Store materials in a clean, dry, enclosed space off the ground, protected from harmful weather conditions and at temperature and humidity conditions recommended by the manufacturer. Protect adhesives from freezing. Store flooring, adhesives and accessories in the spaces where they will be installed for at least 48 hours before beginning installation.
1.7 PROJECT CONDITIONS
A. Maintain a minimum temperature in the spaces to receive the flooring and accessories of 65ºF (18ºC) and a maximum temperature of 85ºF
(29ºC) for at least 48 hours before, during, and for not less than
48 hours after installation. During the service life of the floor,
096536.13 - 5 the temperature should never rise above 100°F (38°C) nor fall below
55°F (13°C). The performance of the flooring material and adhesives can be adversely affected outside this temperature range. Protect all materials from the direct flow of heat from hot-air registers, radiators, or other heating fixtures and appliances.
1.8 WARRANTY
A. Construction Warranty: Comply with FAR clause 52.246-21, “Warranty of Construction”.
B. Manufacturer’s warranty: Minimum 10 years.
PART 2 - PRODUCTS
2.1 MANUFACTURER
A. Resilient tile flooring, wall base, adhesives and subfloor preparation products and accessories:
1. Manufacturer must have a headquarters in the United States of America
2.2 RESILIENT TILE FLOORING MATERIALS
A. Basis of Design:
1. Description: Static dissipative vinyl tile composed of polyvinyl chloride resin, plasticizers, fillers, pigments, and antistatic additive with colors and texture dispersed uniformly throughout its thickness.
2. Tile shall meet size, thickness, indentation, impact, deflection, dimensional stability, resistance to chemicals, squareness, and resistance to heat requirements of ASTM F 1066
Standard Specification for Vinyl Composition Tile, Class 2, through pattern.
3. Pattern and Color: in color selected from the range currently available from manufacturer’s standard range of colors.
4. Size: 12 in. x 12 in.
5. Thickness: 1/8"/0.125 in. (3.2mm)
2.4 WALL BASE MATERIALS
A. For top set wall base: Provide 1/8 in. (3.18 mm) thick, 4 in. (10.16
cm) high Color-Integrated Wall Base with a matte finish, conforming to ASTM F 1861, Type TP - Rubber, Thermoplastic, Group 1 - Solid, Style B – Cove.
2.5 ADHESIVES
A. Provide Static Dissipative Tile Adhesive with 2 in. (5.08 cm) wide x 24 in. (60.96 cm) long copper ground-connection strips for under the
096536.13 - 6 tile and Wall Base Adhesive at the wall base as recommended by the flooring manufacturer.
2.5 ACCESSORIES
A. Provide Static Dissipative Tile Polish for application as initial and on-going static dissipative maintenance finish.
B. For patching, smoothing, and leveling monolithic subfloors (concrete, terrazzo, quarry tile, ceramic tile, and certain metals), provide Fast-Setting Cement-Based Patch and Underlayment as recommended by manufacturer.
C. For priming porous substrates to aid in adhesive bond strength and reducing subfloor porosity, provide acrylic primer for porous substrates as recommended by manufacturer. For non-porous substrates, provide acrylic primer for non-porous substrates as recommended by manufacturer.
D. For creating a moisture barrier, provide two part moisture mitigation system as recommended by manufacturer.
E. For sealing joints between the top of wall base or integral cove cap and irregular wall surfaces such as masonry, provide plastic filler applied according to the manufacturer's recommendations.
F. Provide transition/reducing strips tapered to meet abutting materials.
G. Provide threshold of thickness and width as shown on the drawings.
H. Provide resilient edge strips of width shown on the drawings, of equal gauge to the flooring, homogeneous vinyl or rubber composition, tapered or bullnose edge, with color to match or contrast with the flooring, or as selected by the Architect from standard colors available.
I. Provide metal edge strips of width shown on the drawings and of required thickness to protect exposed edges of the flooring. Provide units of maximum available length to minimize the number of joints.
Use butt-type metal edge strips for concealed anchorage, or overlap-type metal edge strips for exposed anchorage. Unless otherwise shown, provide strips made of extruded aluminum with a mill finish.
PART 3 - EXECUTION
3.1 MANUFACTURER’S INSTRUCTIONS
A. Compliance: Comply with manufacturer’s product data, including technical bulletins, product catalog, installation instructions, and
096536.13 - 7 product carton instructions for installation and maintenance procedures as needed.
3.2 EXAMINATION
A. Site Verification of Conditions: Verify substrate conditions (which have been previously installed under other sections) are acceptable for product installation in accordance with manufacturer's instructions (i.e. moisture tests, bond test, pH test, etc.).
B. Visually inspect flooring materials, adhesives and accessories prior to installation. Flooring material with visual defects shall not be installed and shall not be considered as a legitimate claim.
C. Examine subfloors prior to installation to determine that surfaces are smooth and free from cracks, holes, ridges, and other defects that might prevent adhesive bond or impair durability or appearance of the flooring material.
D. Inspect subfloors prior to installation to determine that surfaces are free from curing, sealing, parting and hardening compounds;
residual adhesives; adhesive removers; and other foreign materials that might prevent adhesive bond. Visually inspect for evidence of moisture, alkaline salts, carbonation, dusting, mold, or mildew.
E. Report conditions contrary to contract requirements that would prevent a proper installation. Do not proceed with the installation until unsatisfactory conditions have been corrected.
F. Failure to call attention to defects or imperfections will be construed as acceptance and approval of the subfloor. Installation indicates acceptance of substrates with regard to conditions existing at the time of installation.
3.3 PREPARATION
A. Subfloor Preparation: Smooth concrete surfaces, removing rough areas, projections, ridges, and bumps, and filling low spots, control or construction joints, and other defects with Fast-Setting
Cement-Based Patch and Underlayment as recommended by the flooring manufacturer. Refer to ASTM F 710 Standard Practice for Preparing
Concrete Floors to Receive Resilient Flooring for additional information on subfloor preparation.
B. Subfloor Preparation Moisture Mitigation: Smooth concrete surfaces, removing rough areas, projections, ridges, and bumps, and filling low spots, control or construction joints, mitigate moisture and other defects with Fast-Setting Cement-Based Patch and Underlayment
096536.13 - 8 as recommended by the flooring manufacturer. Refer to ASTM F 710
Standard Practice for Preparing Concrete Floors to Receive Resilient
Flooring for additional information on subfloor preparation.
C. Subfloor Cleaning: The surface shall be free of dust, solvents, varnish, paint, wax, oil, grease, sealers, release agents, curing compounds, residual adhesive, adhesive removers and other foreign materials that might affect the adhesion of resilient flooring to the concrete or cause a discoloration of the flooring from below.
Remove residual adhesives as recommended by the flooring manufacturer. Remove curing and hardening compounds not compatible with the adhesives used, as indicated by a bond test or by the compound manufacturer's recommendations for flooring. Avoid organic solvents. Spray paints, permanent markers and other indelible ink markers must not be used to write on the back of the flooring material or used to mark the concrete slab as they could bleed through, telegraphing up to the surface and permanently staining the flooring material. If these contaminants are present on the substrate they must be mechanically removed prior to the installation of the flooring material. Refer to the ASTM F 710
Standard Practice for Preparing Concrete Floors to Receive Resilient
Flooring for additional information on subfloor preparation.
D. Perform subfloor moisture testing in accordance with ASTM F 2170, “Standard Test Method for Determining Relative Humidity in Concrete
Slabs Using in-situ Probes” or ASTM F 1869,Standard Test Method for
Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using
Anhydrous Calcium Chloride and Bond Tests as described in the manufacturer’s installation instructions, to determine if surfaces are dry; free of curing and hardening compounds, old adhesive, and other coatings; and ready to receive flooring. Relative humidity shall not exceed 75%. MVER shall not exceed 3 lbs./1000 sq. ft./24 hrs. On installations where both the Percent Relative Humidity and the Moisture Vapor Emission Rate tests are conducted, results for both tests shall comply with the allowable limits listed above. Do not proceed with flooring installation until results of moisture tests are acceptable. All test results shall be documented and retained.
096536.13 - 9
E. Concrete pH Testing: Perform pH tests on concrete floors regardless of their age or grade level. All test results shall be documented and retained.
3.4 INSTALLATION OF FLOORING
A. Install flooring in strict accordance with the latest edition of manufacturer’s installation instructions. Failure to comply may result in voiding the manufacturer’s warranty listed in this
Section.
B. Install flooring wall to wall before the installation of floor-set cabinets, casework, furniture, equipment, movable partitions, etc.
Extend flooring into toe spaces, door recesses, closets, and similar openings as shown on the drawings.
C. If required, install flooring on pan-type floor access covers.
Maintain continuity of color and pattern within pieces of flooring installed on these covers. Adhere flooring to the subfloor around covers and to covers.
D. Scribe, cut, and fit to permanent fixtures, columns, walls, partitions, pipes, outlets, and built-in furniture and cabinets.
E. Install flooring with adhesives, tools, and procedures in strict accordance with the manufacturer's written instructions. Observe the recommended adhesive trowel notching, open times, and working times.
3.5 INSTALLATION OF ACCESSORIES
A. Apply top set wall base to walls, columns, casework, and other permanent fixtures in areas where top-set base is required. Install base in lengths as long as practical, with inside corners fabricated from base materials that are mitered or coped. Tightly bond base to vertical substrate with continuous contact at horizontal and vertical surfaces.
B. Fill voids with plastic filler along the top edge of the resilient wall base or integral cove cap on masonry surfaces or other similar irregular substrates.
C. Place resilient edge strips tightly butted to flooring, and secure with adhesive recommended by the edge strip manufacturer. Install edge strips at edges of flooring that would otherwise be exposed.
D. Apply metal edge strips before flooring installation. Secure units to the substrate, complying with the edge strip manufacturer's recommendations.
096536.13 - 10
3.6 CLEANING
A. Perform initial and on-going maintenance according to the latest edition of the maintenance recommendations for Static Dissipative
Tile.
3.7 PROTECTION
A. Protect installed flooring as recommended by the flooring manufacturer against damage from rolling loads, other trades, or the placement of fixtures and furnishings.
- - - E N D - - -
| SECTION 09 65 36.13 |
| STATIC DISSIPATIVE RESILLENT RESILIENT FLOORING |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SYSTEM DESCRIPTION |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE AND HANDLING |
| 1.7 PROJECT CONDITIONS |
| 1.8 LIMITED WARRANTY |
| Resilient Flooring: Submit a written warranty executed by the manufacturer, agreeing to repair or replace resilient flooring that fails within the warranty period. |
| Limited Warranty Period: 5 years |
| Limited Warranty shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and will be in addition to and run concurrent with other warranties made by the Contractor under the requirements of the C... |
| For the Limited Warranty to be valid, this product is required to be installed using the appropriate Armstrong Flooring Guaranteed Installation System. Product installed not using the specific instructions from the Guaranteed Installation System will... |
| 1.9 EXTENDED SYSTEM LIMITED WARRANTY |
| Resilient Flooring System: Submit a written warranty executed by the manufacturer, agreeing to repair or replace system (subfloor preparation products, adhesive, and floor covering) that fails within the warranty period. |
| Limited Warranty Period: 10 years on top of the Resilient Flooring Limited Warranty |
| S-453 Level Strong™ cement based self-leveling compound. |
| The installation of an Armstrong Flooring product along with the recommended Armstrong Flooring adhesive, as well as any one of the Strong System subfloor preparation products listed above, provides 10 additional years of limited warranty coverage. T... |
| For the System Limited Warranty to be valid, this product is required to be installed using the appropriate Armstrong Flooring Guaranteed Installation System. Product installed not using the specific instructions from the Guaranteed Installation Syst... |
| When Armstrong Flooring Strong System subfloor preparation products are used with other manufacturers’ floor coverings, adhesives, or other subfloor preparation products, Armstrong Flooring warrants our products to be free from manufacturing defects f... |
| PART 2 - PRODUCTS |
| 2.1 MANUFACTURER |
| A. Resilient tile flooring, wall base, adhesives and subfloor preparation products and accessories: |
| 2.2 RESILIENT TILE FLOORING MATERIALS |
| 2.4 WALL BASE MATERIALS |
| 2.05 ADHESIVES |
| 2.5 ACCESSORIES |
| PART 3 - EXECUTION |
| 3.1 MANUFACTURER’S INSTRUCTIONS |
| A. Compliance: Comply with manufacturer’s product data, including technical bulletins, product catalog, installation instructions, and product carton instructions for installation and maintenance procedures as needed. |
| 3.02 EXAMINATION |
| 3.03 PREPARATION |
| 3.04 INSTALLATION OF FLOORING |
| 3.05 INSTALLATION OF ACCESSORIES |
| 3.06 CLEANING |
| 3.07 PROTECTION |