This federal contract opportunity announcement and related amendment package provide details for an upcoming construction project at the Veterans Administration Medical Center in Ann Arbor, Michigan. The project involves modernizing Building 22 and includes renovating plumbing systems to service new medical gas and natural gas requirements. The pre-solicitation announcement specifies the project is valued between $5-10 million and will utilize a firm fixed price contract awarded within 120 days of bid opening. The 100% service-disabled veteran-owned small business set-aside solicitation is planned for issue on November 30th with bids due in early 2023. The amendment package provides answers to offeror questions, updated specifications and drawings, and the applicable Davis-Bacon wage determination.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25023B0005 0004 – Modernize Bldg. 22 – 506-21-102 – VAMC Ann Arbor, MI
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 4
03-03-2023
506-23-1-586-0009
506-21-102
Department of Veterans Affairs Network Contracting Office (NCO) 10
5500 Armstrong Rd Battle Creek MI 49037
Department of Veterans Affairs Network Contracting Office (NCO) 10 6150 Oak Tree Blvd., Suite 300
Independence OH 44131
To all Offerors/Bidders
36C25023B0005
03-03-2023
X
X X
Date and Hour of Receipt of Offers is March 15, 2023 at 1:00 PM EDT
The Purpose of the Amendment is to:
1. Extend the Date and Hour of Receipt of Offers to Wednesday, March 15, 2023 at 1:00 PM
2. Provide Answers to Additional RFI Questions
3. Provide updated Specifications and Drawings with explanation of revisions
4. Provide an updated Wage Determination
End of Amendment 0004
SCOTT D. BRENNAN
Contract Specialist
SF 30 CONTINUATION PAGE 36C25023B0005
AMENDMENT 0004
THE FOLLOWING ANSWERS TO REQUESTS FOR INFORMATION QUESTIONS ARE
HEREBY PROVIDED TO CLARIFY, UPDATE, REVISE, OR CORRECT CONTRACT
SPECIFICATIONS AND/OR DRAWINGS.
QUESTIONS AND ANSWERS
1. RFI #1 Question: Reference Drawing AC141, Note 6: There is reference to a patient lift and shown on the drawing. Who is responsible for this patient lift? No specs and no details and not indicated on the Equipment Drawings. This is the only reference to this equipment.?
Answer: Addendum 02 includes a specification for the bariatric patient lift. The lift motor will be furnished and installed by the VA. The vendor is Arjo. The support and track system will be a part of this contract for the Contractor to furnish and install.
2. RFI #2 Question: Room Finish Legends on Drawing AI102: We are missing SC 2 which is shown on the First Floor Finish Plan.
Answer: SC-2 is the same specifications as SC-1 except will be an accent color
3. RFI #3 Question: Room Finish Legend on Drawings AI101 and AI102. What is the information for SD1 as it is scheduled for use on the Floor Finish Plans. Presently it is marked TBD.
Answer: SD-1 is a static dissipative floor tile. See spec section 096536.13 Static Dissipative Resilient Flooring issued as a part of this addendum.
4. RFI #4 Question: Spec Section 10 22 19 Demountable Partitions; spec calls for 4" solid partition. Confirm Falk 4 7/8" solid partition is acceptable. Confirm Opaque, 3/4" Acrylic Resin Panels are required on the solid wall. Falk standard cladding is 3/4" MDF with 3d laminate finish. Confirm if MDF is to be fire resistant and non-formaldehyde. Confirm if solid wall is to be a smoke partition. Confirm if solid door is to have smoke seals.
Confirm if Falk Solid Pin Hinge Door and Frame are acceptable. Falk Hybrid Wall 4 7/8" and Falk Solid Pin Hinge Tech sheets are attached for review and consideration.
Answer: Falk partitions, door, and hinges are acceptable products as described in the RFI. Door and wall will not need to be a smoke partition.
5. RFI #5 Question: We assume that the hard surface material for the GS/GF Kewaunee benches and tables are to be by the bench manufacturer. Is this correct?
Answer: The mobile casework will be provided by the VA, including associated countertops. Fixed metal casework and associated countertops are provided within this Contract by the Contractor.
6. RFI #6 Question: We have been informed by Detroit Technical Equipment Company that the ceiling service panels (L13) by the General Contractor are supposed to be coordinated with the benches. These panels contain quick connect fixtures and electrical/data outlets that go to the benches. We do not find that this coordination has been done with the documents provided. Should these ceiling service panels be provided by the Government along with the benches?
Answer: See notes and detail on AC141 for more information. The ceiling panels are to be provided by the Contractor. The VA will provide the Kewaunee benches.
Coordination is required. The Basis of Design is identified in the Contract Documents.
7. RFI #7 Question: The drawings show LAB GAS - and detail copper K, brazed as copper ACR med gas pipe. On PL501 and PL602 there is a detail of this gas going to a hot water heater. Is this really natural gas pipe feeding all of this (Black Sch 40 screwed, Natural Gas)?
Answer: The piping labeled on the drawings as Lab Gas (LG) is actually natural gas piping (Black Sch 40 screwed) and will conform to spec section 23 11 13 Facility Natural Gas Piping.
A.1 ADDITIONAL ATTACHMENTS
See attached document: Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.
See attached document: Specification 000110 Table of Contents.
See attached document: Specification 096536 13 Static Dissipative Flooring.
See attached document: Specification 117300 Ceiling Mounted Patient Lift.
See attached document: Drawing 11.00_P001 - PLUMBING LEGEND SHEET.
See attached document: Drawing 11.07_PD121 - GROUND FLOOR PLUMBING
DEMOLITION PLAN - GASES.
See attached document: Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION
PLAN - GASES.
See attached document: Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK
PLAN.
See attached document: Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW
WORK PLAN - GASES.
See attached document: Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK
PLAN - GASES.
See attached document: Drawing 11.17_PL501 - PLUMBING DETAILS.
See attached document: Drawing 11.18_PL601 - PLUMBING SCHEDULES.
See attached document: Drawing 11.19_PL602 - PLUMBING DIAGRAMS.
See attached document: Wage Determination - MI20230100 - 2-3-23 - 506-21-102.
A.1 ADDITIONAL ATTACHMENTS
File details come from the government source that posted it. Updated .