Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf

PDF 1 MB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102
Solicitation number
36C25023B0005
Issued by

About this file

This pre-solicitation notice and related documents outline requirements for a construction project to modernize Building 22 at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project involves furnishing all labor, materials, equipment, and supervision to complete construction work according to provided drawings and specifications, with work scheduled during normal business hours excluding federal holidays. The construction magnitude is estimated between $5 million to $10 million. The solicitation is planned for release on November 30th, 2022 via SAM.gov as a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses. The contract type will be firm-fixed price with an anticipated award within 120 days of bid opening. Offerors must register in SAM and Vendor Information Pages and have an active VETS-4212 report if applicable to be eligible for consideration.

View the file

Other files

File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Specifications - 506-21-102.pdf PDF
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(E) 1 1/2" G

1 1/2" G

3/4" LA

1 1/2" LVC

1" LVC

3/4" LA

1" G

1 1/4" G

3/4" LA

1 1/4" LVC

1" LVC UP

3/4" LA UP

3/4" LVC

3/4" G

3/4" LA

1" LVC

3/4" LA

1" G

1 1 1

2 3 4 5

E

D

C

B

1 1/4" G

3/4" LA

1 1/4" LVC

1 1/4" G

3/4" LA

1 1/4" LVC

1/2" LVC

1/2" LA

1/2" G

1" LVC

3/4" LA

1" G

1/2" LVC UP

1/2" LA UP

1/2" G UP

1/2" LVC UP

1/2" LA UP

1/2" G UP

1/2" G UP

1/2" LA UP

1/2" LVC UP

1/2" G UP

1/2" LA UP

1/2" LVC UP

1/2" LVC UP

1/2" LA UP

1/2" G UP

1/2" LVC UP

1/2" LA UP

1/2" G UP

1/2" LVC UP

1/2" LA UP

1/2" G UP

1/2" LVC UP

1/2" LA UP

1/2" G UP

1/2" G UP

1/2" LA UP

1/2" LVC UP

1/2" G UP

1/2" LA UP

1/2" LVC UP1

(E) GAS METER

(E) UG 1 1/2" G

LAB

G06

COLD ROOM

G07

STORAGE

G07A

CORRIDOR

GG04

LAB

G08 OFFICE

G08A

OFFICE

G9

STORAGE

G08B

LAB

G10

CONFERENCE ROOM

G19E

SHARED OFFICE/STORAGE

G19D

COPY ROOM

G19C

OFFICE

G20

LAV

G22

STORAGE

G19B

H.A.C.

G21

STORAGE

G20A

CORRIDOR

CG05

RESEARCH SERVICE

G19

KITCHEN

G19A

STAIR #1

G18

ELEC.

G18B

STORAGE

G17

CORE FACILITIES

G17A

CELL CULTURE

G13A

CORRIDOR

CG3

LAV

G16

LAV

G15

GLASSWASH &

STERILIZATION

G14

ASSOC. CHIEF OF STAFF

G13

ADMIN ASST SEC'T'Y FILE

G12

CORRIDOR

CG01

ELEVATOR

H.A.C.

G11

LOBBY

CG1

DATA

G18A

CORRIDOR

CGP02

STORAGE

G05A

STORAGE

G04A

USP-800

G05

LAB

G04

LAB

G03

LAB

G02

OFFICE

G01B

OFFICE

G01A

OFFICE

G01

OFFICE

G20

OFFICE

G20D

OFFICE

G20C

OFFICE

G20B

OFFICE

G20A

G E N E R A L N O T E S:

A. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE ATTENTION OF THE COR IN WRITING ANY

DISCREPANCIES THAT MAY IMPACT THE PROGRESS OF WORK.

B. REFER TO SHEET P100 FOR LEGEND AND ABBREVIATIONS.

C. REMOVE ALL LAB VACUUM, LAB AIR, AND NATURAL GAS PIPING SHOWN ON THIS DRAWING EXCEPT FOR PIPING LABLED WITH (E) PREFIX. PATCH FLOOR TO MATCH EXISTING AFTER REMOVAL OF PIPING PENETRATING FLOOR

SLAB.

D. ALL WORK SHOWN ON THIS DRAWING IS TO BE COMPLETED DURING PHASE 2 OF CONSTRUCTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/2

/2

:4

:5

A M

PD121

GROUND FLOOR PLUMBING

DEMOLITION PLAN - GASES

09/02/2022 PP GP

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

N

1/8" = 1'-0"

GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES

D R A W I N G N O T E S :

1 REMOVE LAB GAS OUTLETS AND ASSOCIATED PIPING.

2 REMOVE PIPING TO FUME HOOD.

3 REMOVE ZONE VALVE.

4 REMOVE NATURAL GAS PIPING BACK TO POINT SHOWN AND CAP.

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

2 ADDENDUM 02 03/02/2023

09/02/2022

ALL PIPING LABELED AND REFERENCES TO

LABORATORY GAS (LG) HAVE BEEN CHANGED TO

NATURAL GAS (G)

Sheets
PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES

File details come from the government source that posted it. Updated .