S02 Specifications - 506-21-102.pdf

PDF 6 MB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This is a pre-solicitation notice for a planned invitation for bids to modernize Building 22 at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project scope includes furnishing all labor, materials, equipment, and supervision specified in the drawings and specifications to complete the project. The planned solicitation will be issued on or around November 30, 2022 via SAM.gov and details regarding site visits, bid due dates and other events will be included. The acquisition is a 100% set-aside for qualified service-disabled veteran-owned small businesses. The magnitude of cost for the project is estimated between $5 million to $10 million, and the government intends to award a firm fixed price contract within 120 days of bid opening. Interested parties should monitor SAM.gov and address any questions in writing to the specified contracting officer.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF VETERANS AFFAIRS

LTC CHARLES S. KETTLES VA MEDICAL CENTER

ANN ARBOR, MI

MODERNIZE BUILDING 22

VA Project No.: 506-21-102

BID DOCUMENTS

Prepared By:

September 2, 2022

Ann Arbor VAMC - Modernize Building 22 #506-21-102

09-01-21

00 01 10-1

TABLE OF CONTENTS

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 05-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 03-20 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 07-20 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 01-21 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 01-21 02 82 13.13 Glovebag Asbestos Abatement 01-21 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 01-21 02 82 13.31 Asbestos Transite Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 01-21

DIVISION 04 – MASONRY – NOT USED

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 01-21

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

09-01-21

00 01 10-2

TABLE OF CONTENTS

SECTION NO. DIVISION AND SECTION TITLES DATE

07 21 13 Thermal Insulation 01-21 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 01-21 08 56 59 Service and Teller Window Units 01-21 08 71 00 Door Hardware 01-21 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21 08 90 00 Louvers and Vents 01-21

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 68 00 Carpeting 01-21 09 91 00 Painting 01-21

DIVISION 10 – SPECIALTIES

10 14 00 Signage 01-21 10 21 23 Cubicle Curtain Tracks 01-21 10 22 19 Demountable Partitions 01-21 10 26 00 Wall and Door Protection 01-21 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS

12 31 00 Manufactured Metal Casework 05-15 12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components 01-14

13 21 29 Constant Temperature Rooms 08-16

DIVISION 14– CONVEYING EQUIPEMENT – NOT USED

09-01-21

00 01 10-3

DIVISION 21- FIRE SUPPRESSION

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 11 00 Facility Water Distribution 05-21 22 11 23 Domestic Water Pumps 09-15 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15 22 34 00 Fuel-Fired Domestic Water Heaters 09-20 22 40 00 Plumbing Fixtures 09-15 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15 22 66 00 Chemical-Waste Systems for Laboratory and Healthcare

Facilities 09-20

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 02-20

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20 23 09 23 Direct-Digital Control System for HVAC 09-11 23 11 23 Facility Natural-Gas Piping 04-20 23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20 23 23 00 Refrigerant Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 23 40 00 HVAC Air Cleaning Devices 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 81 00 Decentralized Unitary HVAC Equipment 03-20 23 82 00 Convection Heating and Cooling Units 03-20 23 82 16 Air Coils 03-20

09-01-21

00 01 10-4

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 24 13 Distribution Switchboards 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 41 00 Facility Lightning Protection 01-17 26 43 13 Surge Protective Devices 01-17 26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 15 00 Communications Structured Cabling 01-16

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and

Security 10-18

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK – NOT USED

DIVISION 32 – EXTERIOR IMPROVEMENTS – NOT USED

DIVISION 33 – UTILITIES – NOT USED

DIVISION 34 – TRANSPORTATION – NOT USED

DIVISION 48 – ELECTRICAL POWER GENERATION – NOT USED

05-01-20

00 01 15 - 1

LIST OF DRAWING SHEETS

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

GI000 COVER SHEET

GI001 GENERAL NOTES AND ABBREVIATIONS

GI002 LIFE SAFETY PLANS

GI100 PHASING/ICRA PLANS

GI101 ASBESTOS PLANS

STRUCTURAL

S101 ROOF FRAMING PLAN AND DETAILS

ARCHITECTURE

AD101 GROUND FLOOR DEMOLITION PLAN

AD102 FIRST FLOOR DEMOLITION PLAN

AD110 ROOF DEMOLITION PLAN

AD141 GROUND FLOOR DEMOLITION REFLECTED CEILING PLAN

AD142 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN

AE101 GROUND FLOOR PLAN

AE102 FIRST FLOOR PLAN

AE100 PHASE ONE CONSTRUCTION

AE110 ROOF PLAN

AC141 GROUND FLOOR REFLECTED CEILING PLAN

AC142 FIRST FLOOR REFLECTED CEILING PLAN

AE301 BUILDING SECTIONS

AE500 ARCHITECTURAL DETAILS

AE501 ARCHITECTURAL DETAILS

AE601 DOOR SCHEDULE AND DETAILS

AI101 GROUND FLOOR FINISH PLAN

AI102 FIRST FLOOR FINISH PLAN

AW101 WAYFINDING DETAILS AND ELEVATIONS

QL101 GROUND FLOOR EQUIPMENT PLAN

QL102 FIRST FLOOR EQUIPMENT PLAN

05-01-20

00 01 15 - 2

LIST OF DRAWING SHEETS

IF101 FURNITURE PLAN

FIRE PROTECTION

FD101 GROUND FLOOR FIRE SUPPRESSION DEMOLITION PLAN

FD102 FIRST FLOOR FIRE SUPPRESSION DEMOLITION PLAN

FX101 GROUND FLOOR FIRE SUPPRESSION NEW WORK PLAN

FX102 FIRST FLOOR FIRE SUPPRESSION NEW WORK PLAN

PLUMBING

P001 PLUMBING LEGEND SHEET

PD100 BASEMENT PLUMBING DEMOLITION PLAN

PD101 GROUND FLOOR PLUMBING DEMOLITION PLAN - WASTE

PD102 FIRST FLOOR PLUMBING DEMOLITION PLAN - WASTE

PD103 PENTHOUSE PLUMBING DEMOLITION PLAN

PD111 GROUND FLOOR PLUMBING DEMOLITION PLAN - WATER

PD112 FIRST FLOOR PLUMBING DEMOLITION PLAN - WATER

PD121 GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES

PD122 FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES

PL100 BASEMENT PLUMBING NEW WORK PLAN

PL101 GROUND FLOOR PLUMBING NEW WORK PLAN - WASTE

PL102 FIRST FLOOR PLUMBING NEW WORK PLAN - WASTE

PL103 PENTHOUSE PLUMBING NEW WORK PLAN

PL111 GROUND FLOOR PLUMBING NEW WORK PLAN - WATER

PL112 FIRST FLOOR PLUMBING NEW WORK PLAN - WATER

PL121 GROUND FLOOR PLUMBING NEW WORK PLAN - GASES

PL122 FIRST FLOOR PLUMBING NEW WORK PLAN - GASES

PL501 PLUMBING DETAILS

PL601 PLUMBING SCHEDULES

PL602 PLUMBING DIAGRAMS

PL901 PLUMBING SANITARY WASTE & VENT ISOMETRICS

PL902 PLUMBING LABORATORY WASTE & VENT ISOMETRICS

PL903 PLUMBING WATER ISOMETRICS

MECHANICAL

M001 MECHANICAL LEGEND

MD101 BASEMENT AND GROUND FLOOR MECHANICAL DEMOLITION

MD102 FIRST FLOOR MECHANICAL DEMOLITION PLAN

05-01-20

00 01 15 - 3

LIST OF DRAWING SHEETS

MD103 PENTHOUSE MECHANICAL DEMOLITION PLAN

MH101 BASEMENT AND GROUND FLOOR HVAC PLAN

MH102 FIRST FLOOR HVAC PLAN

M103 PENTHOUSE MECHANICAL PLAN

MP101 BASEMENT AND GROUND FLOOR PIPING PLAN

MP102 FIRST FLOOR PIPING PLAN

M301 MECHANICAL SECTIONS

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M503 MECHANICAL DETAILS

M504 MECHANICAL DETAILS

M505 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES

M602 MECHANICAL SCHEDULES

M603 MECHANICAL SCHEDULES

M604 MECHANICAL SCHEMATICS

M701 MECHANICAL CONTROLS

M702 MECHANICAL CONTROLS

M703 MECHANICAL CONTROLS

ELECTRICAL

E001 LEGEND AND GENERAL NOTES

ED101 GROUND FLOOR DEMOLITION PLAN

ED102 FIRST FLOOR DEMOLITION PLAN

ED103 PENTHOUSE DEMOLITION PLAN

EL101 GROUND FLOOR LIGHTING PLAN

EL102 FIRST FLOOR LIGHTING PLAN

EL103 PENTHOUSE LIGHTING PLAN

EP101 GROUND FLOOR POWER PLAN

EP102 FIRST FLOOR POWER PLAN

EP103 PENTHOUSE POWER PLAN

EY101 GROUND FLOOR TECHNOLOGY PLAN

EY102 FIRST FLOOR TECHNOLOGY PLAN

EJ104 ROOF LIGHTNING PROTECTION PLAN

E500 TECHNOLOGY DETAILS

E501 SINGLE LINE DIAGRAM

E601 LIGHTING AND EQUIPMENT SCHEDULES

05-01-20

00 01 15 - 4

LIST OF DRAWING SHEETS

E602 PANELBOARD SCHEDULES

E603 PANELBOARD SCHEDULES

- - - END - - -

11-01-21

01 00 00 -1

GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

GENERAL

1.1 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the renovation of existing biomedical research laboratory environments at Ann

Arbor Michigan Veterans Affairs Medical Center Building No. 22

Ground Floor and First Floor. The project is anticipated to re-develop approximately 15,443 NSF of research space which includes improved space layout distribution, physical security upgrades, architectural, finish upgrades, and modernization of the mechanical, electrical, plumbing, and technology systems.

B. A priority for the project includes the replacement of the existing Hot Deck/Cold Deck Air Handling Unit (AHU) with a new modern AHU and Variable Air Volume (VAV) distribution system.

Laboratories with fume hoods shall have the room air systems fully integrated such that the room air balance is maintained as the fume hood sash position changes or when the fume hood is in idle mode. Air Valves shall modulate fume hood exhaust, room supply air and exhaust maintaining proper relative air balance for the lab per VA HVAC Design Guide.

C. Visits to the site by Bidders shall be made only by appointment with the Contracting Officer Representative (COR).

D. Offices of FFE, Inc., as Architect-Engineers, shall render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the

Government without affirmations by COR.

11-01-21

01 00 00 -2

GENERAL REQUIREMENTS

E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, necessary removal of existing structures and construction and certain other items as indicated in the construction documents.

1. Demolition of existing partitions, cold rooms and related infrastructure to accommodate new space distribution of laboratory environments, outpatient clinic space and administrative areas. New space distribution is supported by

MEPT infrastructure appropriate for the diverse environments.

The project includes the replacement of the existing Hot

Deck/Cold Deck Air Handling Unit (AHU) with a new modern AHU and Variable Air Volume (VAV) distribution system.

2. Work associated with BASE BID shall be constructed within 540 calendar days.

B. ALTERNATE NO.1: BASE BID except delete renovation of administrative spaces as indicated in the construction documents.

1. Work associated with ALTERNATE NO. 1 shall be constructed within 500 calendar days.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies shall be at

Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that shall remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

11-01-21

01 00 00 -3

GENERAL REQUIREMENTS

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give three week’s notice to the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the COR. Patients and staff are not to be photographed at any time.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor shall return to the site only with the written approval of the

COR.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See

Section 08 71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub

Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor shall be responsible for safekeeping of all drawings, project manual and other project information.

11-01-21

01 00 00 -4

GENERAL REQUIREMENTS

This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the COR upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of COR.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the

VA.

6. Notify COR immediately when there is a loss or compromise of

“sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an

Engineering Document Management Software (EDMS).

Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

“Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted

24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. Permits shall be issued for General Contractor and its employees for parking in designated areas only. Contractor shall coordinate with VA Medical Center COR. NOTE: Two (2) parking passes for vehicles will be provided. Coordinate parking passes with COR.

11-01-21

01 00 00 -5

GENERAL REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities shall be erected by the Contractor only with the approval of the COR and shall be built with labor and materials furnished by the Contractor without expense to the Government.

The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the COR, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the COR.

When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the COR.

E. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, shall not permitted in buildings that are occupied, during construction, jointly by patients or medical

11-01-21

01 00 00 -6

GENERAL REQUIREMENTS

personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

F. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

All such actions shall be coordinated with the COR.

G. Phasing:

1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service shall be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It shall be the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used and their proposed storage locations, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

2. To ensure such executions, Contractor shall mobilize 120 days after notice to proceed (NTP) and furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR three weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure

11-01-21

01 00 00 -7

GENERAL REQUIREMENTS

accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows and as described in the Drawings:

Phase I:

1. No Ground Floor scope on Phase 1.

2. New USP-800 Room built on First Floor with associated ceiling work for future connection prepared.

a. Temporary fan coil unit and duct, final supply duct (prepped for connection during Phase 2) and exhaust duct and fan.

3. Associated north corridor finishes remodel from USP-800 to exterior door.

4. Temporary partitions and doors

b. Contractor shall maintain access to Ground Floor USP-800 during Phase 1.

c. Contractor shall construct and maintain access to First Floor USP-800 after Phase 1 completion.

5. Coordinate with Contractor-hired third-party testing firm to perform certification testing of the new USP-800 Hazardous

Compounding suite operating under temporary conditions.

Phase II:

1. Transition First Floor USP-800 supply air from temporary AHU unit to newly commissioned AHU unit in coordination with COR.

2. Ground Floor demolition and new work.

3. Remaining spaces on First Floor in this phase scope.

4. Coordinate with Contractor-hired third-party testing firm to perform certification testing of the new USP-800 Hazardous

Compounding suite after the suite transitions from temporary operating conditions to permanent operating conditions.

H. Building 22 will be vacated by Government in accordance with above phasing beginning immediately after date of receipt of

Notice to Proceed and turned over to Contractor.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so

11-01-21

01 00 00 -8

GENERAL REQUIREMENTS

that equipment and affected areas to be used in the Medical

Centers operations shall not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by

Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

I. When a building and/or construction site is turned over to

Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C

(40 degrees F) in construction areas at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

J. Utilities Services: Maintain existing utility services for

Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut

11-01-21

01 00 00 -9

GENERAL REQUIREMENTS

and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR.

Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11

REQUIREMENTS FOR COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption shall cause least inconvenience to operations of Medical

Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system shall be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service shall be interrupted on approval of COR. Such approval shall be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

11-01-21

01 00 00 -10

GENERAL REQUIREMENTS

K. Abandoned Lines: There shall be no abandoned lines without prior and specific written approval of the COR. All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

L. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

Wherever excavation for new utility lines cross existing roads, at least one lane shall be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

M. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF

ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a signed report, to the COR. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

11-01-21

01 00 00 -11

GENERAL REQUIREMENTS

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by

Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled

"DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by

Contractor to such flooring and other surfaces, despite protection measures; and, shall form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.

D. Protection: Provide the following protective measures:

11-01-21

01 00 00 -12

GENERAL REQUIREMENTS

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work shall be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that shall remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by

COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work shall be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

11-01-21

01 00 00 -13

GENERAL REQUIREMENTS

1.9 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems

(including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"

(FAR 52.236-2).

1.10 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which shall be kept current during construction of the project, to include all contract changes, modifications and clarifications.

11-01-21

01 00 00 -14

GENERAL REQUIREMENTS

B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.11 WARRANTY MANAGEMENT

A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of

Construction in at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan.

Include within the warranty management plan all required actions and documents to assure that the Government receives all warranties to which it is entitled. The General Contractor shall provide an electronic format of the Warranty Management Plan through Submittal exchange. The General Contractor shall host an electronic cloud-based file exchange system (example: Submittal

Exchange, Procore) or approved equal for all construction documentation including but not limited to drawings, specification, and manuals for the life of the project. The plan shall be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below shall include due date and whether item has been submitted or was approved. Warranty information made available during the construction phase shall be submitted to the

Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the COR upon acceptance of the work. The construction warranty period shall begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and

11-01-21

01 00 00 -15

GENERAL REQUIREMENTS

9 month warranty inspection shall be conducted, measured from time of acceptance, by the Contractor and the Contracting

Officer. Include in the warranty management plan, but not limited to, the following:

1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.

2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.

3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.

4. A list for each warranted equipment item, feature of construction or system indicating:

a. Name of item.

b. Model and serial numbers.

c. Location where installed.

d. Name and phone numbers of manufacturers and suppliers.

e. Name and phone numbers of manufacturers or suppliers.

f. Names, addresses and phone numbers of sources of spare parts.

g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties shall be indicated with separate warranty expiration dates.

h. Starting point and duration of warranty period.

i. Summary of maintenance procedures required to continue the warranty in force.

j. Cross-reference to specific pertinent Operation and Maintenance manuals.

11-01-21

01 00 00 -16

GENERAL REQUIREMENTS

k. Organizations, names and phone numbers of persons to call for warranty service.

l. Typical response time and repair time expected for various warranted equipment.

5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.

6. Procedure and status of tagging of all equipment covered by extended warranties.

7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.

B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period.

1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the

Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the

Government while performing the work, including, but not limited to administrative expenses.

2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.

3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the

Contracting Officer to proceed against the Contractor.

C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section.

Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the

11-01-21

01 00 00 -17

GENERAL REQUIREMENTS

type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the

Contractor. This point of contract shall be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement shall not relieve the

Contractor of any of its responsibilities in conjunction with other portions of this provision.

D. Contractor’s Response to Construction Warranty Service

Requirements:

E. Following oral or written notification by the Contracting

Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction

Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the

Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.

1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.

2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.

11-01-21

01 00 00 -18

GENERAL REQUIREMENTS

3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.

4. The “Construction Warranty Service Priority List” is as follows:

a) Code 1-Life Safety Systems

Fire suppression systems.

Fire alarm system(s).

b) Code 1-Air Conditioning Systems Air conditioning leak in part of the building, if causing damage.

Air conditioning system not cooling properly.

c) Code 1 Doors

1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.

d) Code 3-Doors Interior/exterior personnel doors or hardware not functioning properly.

e) Code 1-Electrical Power failure (entire area or any building operational after 1600 hours).

Security lights.

Smoke detectors.

f) Code 2-Electrical Power failure (no power to a room or part of building).

Receptacle and lights not operational (in a room or part of building).

g) Code 1-Gas Leaks and pipeline breaks.

h) Code 1-Heat Power failure affecting heat.

i) Code 1-Plumbing Hot water heater failure.

2) Leaking water supply pipes

11-01-21

01 00 00 -19

GENERAL REQUIREMENTS

j) Code 2-Plumbing Flush valves not operating properly Fixture drain, supply line or any water pipe leaking.

Toilet leaking at base.

k) Code 3- Plumbing Leaky faucets.

l) Code 3-Interior Floors damaged.

Paint chipping or peeling.

Casework damaged.

m) Code 1-Roof Leaks Damage to property is occurring.

n) Code 2-Water (Exterior) No water to facility.

o) Code 2-Water (Hot) No hot water in portion of building listed.

p) Code 3 All work not listed above.

F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the

Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature shall remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.

Warranty Tags

Type of product/material

Model number

Serial number

Contract number

Warranty period from/to

Inspector’s signature

11-01-21

01 00 00 -20

GENERAL REQUIREMENTS

Warranty Tags

Construction Contractor

Address

Telephone number

Warranty Contact

Address

Telephone number

Warranty response time priority code

1.12 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on

Medical Center property.

1.13 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system shall be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2020 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly

11-01-21

01 00 00 -21

GENERAL REQUIREMENTS

cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations shall be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use shall be repaired replaced by the contractor at the contractor’s expense.

1.14 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevator for handling building materials and

Contractor's personnel shall be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Contractor shall use elevator in Building No. 22 for daily use and for special nonrecurring time intervals when

11-01-21

01 00 00 -22

GENERAL REQUIREMENTS

permission is granted. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a) Entrance jambs, heads soffits and threshold plates.

b) Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c) Finish flooring.

3. Place elevator in condition equal, less normal wear, to that existing at time it was placed in service of Contractor as approved by COR.

1.15 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workers) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies and all connections and appliances connected therewith shall be removed prior to completion of contract, and premises left perfectly clean.

1. Contractor may have for use of Contractor's workers, such toilet accommodations as may be assigned to Contractor by

Medical Center . Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workers. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.

1.16 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract.

B. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:

11-01-21

01 00 00 -23

GENERAL REQUIREMENTS

1. Obtain heat by connecting to Medical Center heating distribution system.

a) Steam is available at no cost to Contractor.

C. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. Electricity is available at no cost to the Contractor.

D. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .