Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf

PDF 742 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation announcement provides details for an upcoming Invitation for Bid for modernization work at the Veterans Administration Medical Center in Ann Arbor, Michigan. The project involves furnishing all labor, materials, equipment, and supervision specified in drawings and specifications to complete modernization of Building 22. The work must be performed according to manufacturer recommendations and applicable codes. The project has an estimated value between $5-10 million. The contract will be a firm fixed price awarded within 120 days of bid opening. Only Service-Disabled Veteran Owned Small Businesses registered in the Vendor Information Pages database will be considered for this 100% set-aside acquisition. Interested parties should monitor the Contract Opportunities website for solicitation release planned for November 30, 2022, which will include further details on site visits, bid due date, and other events. Questions may be directed to the specified contracting officer by email only.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLUMBING FIXTURE SCHEDULE

MARK DESCRIPTION

WASTE PIPE VENT PIPE COLD WATER HOT WATER WASTE

FIXTURE

UNITS

COLD WATER

FIXTURE UNITS

HOT WATER FIXTURE

UNITS

WRIST BLADE

HANDLES

ELECTRIC

SENSOR

REMARKS

IN [mm] IN [mm] IN [mm] IN [mm]

P-103 WATER CLOSET, WALL HUNG 4 [ 100 ] 2 [ 50 ] 1 [ 25 ] - - 4 10 - N/A NO -

P-413 LAVATORY, BOWL INTEGRAL WITH COUNTER 1.25 [ 30 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 1 1.5 1.5 YES NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F, REFER TO EXAM SINK SECTION ON SHEET

AE500

P-415

LAVATORY, WALL MOUNTED, SINGLE LEVER

HANDLE

1.25 [ 30 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 1 1.5 1.5 NO NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F

P-502 MOP SINK, FLOOR MOUNTED 3 [ 75 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 2 3 3 NO NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F

P-516

SINK, CRS, WALL MOUNTED, SINGLE

COMPARTMENT

1.5 [ 40 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 3 1.5 1.5 YES NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F

P-530

LABORATORY SINK, INTEGRAL WITH COUNTER,

SINGLE COMPARTMENT

1.5 [ 40 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 3 1.5 1.5 YES NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F

P-604 ELECTRIC WATER COOLER 1.25 [ 30 ] 1.5 [ 40 ] .5 [ 15 ] - - 0.5 0.25 - NO NO PROVIDE WITH BOTTLE FILLER

P-709 EMERGENCY EYE/FACE WASH - - - - .5 [ 15 ] .5 [ 15 ] - - - N/A NO COUNTER MOUNTED, DRAINS TO P-530, PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 85F

P-802 HOSE BIBB, INTERIOR - - - - .5 [ 15 ] - - - - - N/A NO -

VACUUM PUMP SCHEDULE

MARK LOCATION

AREA AND/OR

BLDG SERVED

SYSTEM AND/OR

SERVICE

TYPE UNIT

RECEIVER SIZE VACUUM PRESSURE

CFM DELIVERY @

VACUUM PRESSURE (SI)

ELECTRIC POWER

REMARKS

NO. PUMPS

POWER EACH

PHASE VOLT RPM

GAL [L] in Hg [kPa] SCFM

STANDARD

[L/s] HP [Kw]

VP-1 PENTHOUSE BUILDING 22

LABORATORY

VACUUM

LUBRICATED DUPLEX 80 [ 300 ] 19 [ 64 ] 22 [ 10 ] 2 2 1.5 [ 3 ] 208 1750 PROVIDE WITH CONCRETE EQUIPMENT PAD

PLUMBING PUMP SCHEDULE

MARK LOCATION

AREA AND/OR

BLDG SERVED

SYSTEM AND/OR

SERVICE

TYPE

CIRCULATING FLUID ELECTRICAL MOTOR

FLUID

FLOW HEAD NOMINAL POWER

PHASE VOLT

MAX

RPM

SPEED

CONTROL

REMARKS

GPM [L/s] FT [kPa] HP [kW]

DHWRP-1 PENTHOUSE BUILDING 22

DOMESTIC HOT WATER

RETURN

RECIRCULATING

DOMESTIC HOT

WATER

3 [0.19] 22 [8.96] 1/12 [0.062] 1 115 2650 CONSTANT 1

REMARKS:

1. PUMP TO RUN CONTINUOUSLY

GAS FIRED WATER HEATER SCHEDULE

MARK LOCATION

AREA AND/OR BLDG

SERVED

SYSTEM AND/OR

SERVICE

TYPE

STORAGE CAPACITY

RECOVERY @ 70 °F [21°

C] RISE

RELIEF VALVE SETTING

FUEL ELECTRICAL MOTOR

REMARKS

TYPE

INLET PRESSURE FLOW NOMINAL POWER, EA.

PHASE VOLT

GAL [L] GAL/HR [L/HR] PSIG [kPa] IN WG [Pa] CFH [L/H] HP [kW]

GWH-1 PENTHOUSE BUILDING 22 DOMESTIC HOT WATER STORAGE 100 [ 380 ] 255 [ 970 ] 150 [ 1000 ] NATURAL GAS 14 [ 3500 ] 150 [ 4200 ] .25 [ 190 ] 1 120 1, 2

REMARKS:

1. SET OUTLET TEMPERATURE TO 140 DEG F.

2. PROVIDE WITH CONCRETE EQUIPMENT PAD.

DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE

MARK LOCATION TYPE

SYSTEM TEMPERATURE RANGE

INITIAL PRESSURE IN

TANK

MAX OPERATING

PRESSURE

RELIEF VALVE PSIG [kPA] MIN TANK VOLUME MIN ACCEPT VOLUME PIPE SIZE TO TANK

REMARKSMIN MAX

°F [°C] °F [°C] PSIG [kPa] PSIG [kPa] PSIG [kPa] GAL [L] GAL [L] IN [mm]

ET-1 PENTHOUSE

POTABLE THERMAL

EXPANSION TANK

40 [ 4 ] 180 [ 82 ] 60 [ 410 ] 80 [ 550 ] 150 [ 1000 ] 9.21 [ 35 ] 5.25 [ 20 ] 3/4 [20] -----

GAS PRESSURE REGULATOR

MARK LOCATION

AREA AND/OR

BLDG SERVED

SYSTEM AND/OR

SERVICE

TYPE

CAPACITY INLET PRESSURE INLET SIZE OUTLET PRESSURE OUTLET SIZE

REMARKSSERVES

CFH [L/HR] PSIG [kPa] IN [mm] PSIG IN WG [kPa] IN [mm]

GPR-1 EXTERIOR BUILDING 22

LAB GAS (NATURAL

GAS)

MAIN SUPPLY LINE LINE 964 [ 27000 ] 2 [ 14 ] 1.5 [40] 1.0 28.0 [7] 1.5 [40] 1, 2

GPR-2 LAB G36 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-3 LAB G36 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-4 LAB G36 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS &

FUME HOOD

SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-5 PRIVATE LAB G36A BUILDING 22

LAB GAS (NATURAL

GAS)

FUME HOOD SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-6 LABORATORY 120 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS &

FUME HOOD

SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-7 LABORATORY 120 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-8 LABORATORY 120 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-9

LABORATORY

120/124

BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-10 LABORATORY 124 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-11 LABORATORY 124 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-12 LABORATORY 124 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS &

FUME HOOD

SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-13 LABORATORY 104 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS &

FUME HOOD

SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-14 LABORATORY 104 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-15

LABORATORY

103/104

BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-16 LABORATORY 103 BUILDING 22

LAB GAS (NATURAL

GAS)

CEILING PANELS &

FUME HOOD

SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1

GPR-17 PENTHOUSE BUILDING 22

LAB GAS (NATURAL

GAS)

GWH-1 SERVICE 242 [ 6900 ] 1 [ 7 ] 0.75 [20] 0.5 14.0 [3.5] 0.5 [15] 1

REMARKS:

1. REFER TO NATURAL GAS SCHEMATIC DIAGRAM ON SHEET PL-602 FOR MORE INFORMATION.

2. PROVIDE WITH INTERNAL RELIEF.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/1

/2

:4

:0

P

M

PL601

PLUMBING SCHEDULES

09/02/2022 PP GP

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

1 ADDENDUM 01 02/14/2023

09/02/2022

Sheets
PL601 - PLUMBING SCHEDULES