Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf

PDF 947 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102
Solicitation number
36C25023B0005
Issued by

About this file

This pre-solicitation announcement provides details for an upcoming Invitation for Bid for modernization services at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project scope includes furnishing all necessary labor, tools, materials, equipment, and supervision specified in drawings and specifications to complete the modernization of Building 22. The anticipated cost is between $5 million and $10 million. The government intends to award a firm fixed price contract within 120 days of bid opening. This acquisition is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. Offers will only be accepted from verified SDVOSBs registered in the Vendor Information Pages database. Interested parties should monitor the Contract Opportunities website for solicitation release planned for November 30, 2022, which will include further details on requirements, site visits, and the bid due date.

View the file

Other files

File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Specifications - 506-21-102.pdf PDF
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VMU BEHAVIOR ROOM

G30

CYLINDER STORAGE

G34

LAB

G36

VMU SOUND

G31

CORRIDOR

C-G8

CORRIDOR

C-G7

UNISEX TOILET

G16

UNISEX TOILET

G15

TELECOMM.

G13

RECORDS

G10

ELEVATOR

Z1

H.A.C.

G09

LOBBY

C-G3

ELECTRIC ROOM

G18A

STAIR-1

S1-1

KITCHEN

G19A

RESEARCH SERVICE

G19

CONFERENCE ROOM

G19E

OPEN OFFICE

G20

TOILET

G22

CORRIDOR

ELECTRIC ROOM

G18B

OPEN OFFICE

G08

OFFICE/ FUTURE EXAM

G05

EXAM

G04

EXAM

G01

EXAM

G02

EXAM

G03

OPEN OFFICE

G06

CORRIDOR

C-G4

(E) 1 1/2" G

2 3 4 5

E

D

C

B

EQUIPMENT

G12

OFFICE

G20C

OFFICE

G20B

SHARED OFFICE

G20A

CORRIDOR

C-G5

CORRIDOR

C-G2

OFFICE/ FUTURE EXAM

G07

1 1/2" G

3/4" LA

1" LVC

1 1/2" G

1/2" LA

1" LVC

1" LVC

1/2" LA

1 1/2" G UP

CONTROLLED TEMPERATURE

ROOM

G32

1 1

1 1/2" G

51 1/2" G

3 3/4" LA UP

1" LVC UP 1/2" G

PRIVATE LAB

G36A

GPR-2

GPR-3

GPR-4

GPR-5

CORRIDOR

C-G1

H.A.C.

G21

OFFICE

G40

OFFICE

G42

STORAGE

G43

CORRIDOR

C-G10

OFFICE

G41

VMU HOLDING

G33

MICROSCOPE

G11

CORRIDOR

C-G9

CORRIDOR

C-G6

(E) GAS METER

GPR-1

(E) UG 1 1/2" G

G E N E R A L N O T E S:

A. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE ATTENTION OF THE COR IN WRITING ANY

DISCREPANCIES THAT MAY IMPACT THE PROGRESS OF WORK.

B. REFER TO SHEET P100 FOR LEGEND AND ABBREVIATIONS.

C. REFER TO SPECIFICATION SECTIONS 226200 VACUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES, 226300 GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES, AND 231123 FACILITY NATURAL GAS PIPING

FOR TESTING PROCEDURES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/2

/2

:4

:1

A M

PL121

GROUND FLOOR PLUMBING NEW

WORK PLAN - GASES

09/02/2022 PP GP

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

N

1/8" = 1'-0"

GROUND FLOOR PLUMBING NEW WORK PLAN - GASES - PHASE 2

D R A W I N G N O T E S :

1 ROUTE 1/2" LA, 1/2" G, AND 3/4" LVC PIPING TO CEILING LAB GAS QUICK CONNECTS IN CEILING SERVICE PANEL. EACH CEILING SERVICE PANEL TO HAVE (4) LA, (4) G, AND (4) LVC CONNECTIONS. REFER TO SHEET AC142 FOR CEILING

SERVICE PANEL DETAIL.

2 ROUTE 1/2" LA, 1/2" G, AND 3/4" LVC PIPING DOWN IN WALL TO FUME HOOD.

3 CORE DRILL THROUGH FLOOR SLAB FOR INSTALLATION OF PIPING THROUGH FLOOR.

4 REPLACE EXTERIOR NATURAL GAS PRESSURE REGULATOR WITH GPR-1. REFER TO GAS PRESSURE REGULATOR

SCHEDULE ON SHEET PL601.

5 CONNECT NATURAL GAS PIPING TO EXISTING AT POINT SHOWN.

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

2 ADDENDUM 02 03/02/2023

09/02/2022

ALL PIPING LABELED AND REFERENCES TO

LABORATORY GAS (LG) HAVE BEEN CHANGED TO

NATURAL GAS (G)