Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf
PDF 743 KB Posted
- Attached to
- Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
- Solicitation number
- 36C25023B0005
About this file
This document includes a pre-solicitation notice and description for a planned invitation for bids to modernize Building 22 at the Ann Arbor Veterans Affairs Medical Center in Michigan. The contractor shall furnish all labor, materials, equipment, and supervision to complete the project in compliance with drawings, specifications, codes and standards. Work is scheduled for daytime business hours excluding federal holidays. The NAICS code is 236220 with a small business size standard of $16.5 million. The estimated cost is between $5-10 million. The government intends to award a firm fixed price contract within 120 days of bid opening. This acquisition is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses registered in the Vendor Information Pages database. The solicitation is expected to be issued on November 30, 2022 and will include bid documents, specifications, forms and drawings available at SAM.gov. Further solicitation details and dates, including for site visits and bid submission, will be provided then.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION
WASTE PIPE VENT PIPE COLD WATER HOT WATER WASTE
FIXTURE
UNITS
COLD WATER
FIXTURE UNITS
HOT WATER FIXTURE
UNITS
WRIST BLADE
HANDLES
ELECTRIC
SENSOR
REMARKS
IN [mm] IN [mm] IN [mm] IN [mm]
P-103 WATER CLOSET, WALL HUNG 4 [ 100 ] 2 [ 50 ] 1 [ 25 ] - - 4 10 - N/A NO -
P-413 LAVATORY, BOWL INTEGRAL WITH COUNTER 1.25 [ 30 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 1 1.5 1.5 YES NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F, REFER TO EXAM SINK SECTION ON SHEET
AE500
P-415
LAVATORY, WALL MOUNTED, SINGLE LEVER
HANDLE
1.25 [ 30 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 1 1.5 1.5 NO NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F
P-502 MOP SINK, FLOOR MOUNTED 3 [ 75 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 2 3 3 NO NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F
P-516
SINK, CRS, WALL MOUNTED, SINGLE
COMPARTMENT
1.5 [ 40 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 3 1.5 1.5 YES NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F
P-530
LABORATORY SINK, INTEGRAL WITH COUNTER,
SINGLE COMPARTMENT
1.5 [ 40 ] 1.5 [ 40 ] .5 [ 15 ] .5 [ 15 ] 3 1.5 1.5 YES NO PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 110F
P-604 ELECTRIC WATER COOLER 1.25 [ 30 ] 1.5 [ 40 ] .5 [ 15 ] - - 0.5 0.25 - NO NO PROVIDE WITH BOTTLE FILLER
P-709 EMERGENCY EYE/FACE WASH - - - - .5 [ 15 ] .5 [ 15 ] - - - N/A NO COUNTER MOUNTED, DRAINS TO P-530, PROVIDE WITH TMV TO LIMIT DHW OUTPUT TO 85F
P-802 HOSE BIBB, INTERIOR - - - - .5 [ 15 ] - - - - - N/A NO -
VACUUM PUMP SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
TYPE UNIT
RECEIVER SIZE VACUUM PRESSURE
CFM DELIVERY @
VACUUM PRESSURE (SI)
ELECTRIC POWER
REMARKS
NO. PUMPS
POWER EACH
PHASE VOLT RPM
GAL [L] in Hg [kPa] SCFM
STANDARD
[L/s] HP [Kw]
VP-1 PENTHOUSE BUILDING 22
LABORATORY
VACUUM
LUBRICATED DUPLEX 80 [ 300 ] 19 [ 64 ] 22 [ 10 ] 2 2 1.5 [ 3 ] 208 1750 PROVIDE WITH CONCRETE EQUIPMENT PAD
PLUMBING PUMP SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
TYPE
CIRCULATING FLUID ELECTRICAL MOTOR
FLUID
FLOW HEAD NOMINAL POWER
PHASE VOLT
MAX
RPM
SPEED
CONTROL
REMARKS
GPM [L/s] FT [kPa] HP [kW]
DHWRP-1 PENTHOUSE BUILDING 22
DOMESTIC HOT WATER
RETURN
RECIRCULATING
DOMESTIC HOT
WATER
3 [0.19] 22 [8.96] 1/12 [0.062] 1 115 2650 CONSTANT 1
REMARKS:
1. PUMP TO RUN CONTINUOUSLY
GAS FIRED WATER HEATER SCHEDULE
MARK LOCATION
AREA AND/OR BLDG
SERVED
SYSTEM AND/OR
SERVICE
TYPE
STORAGE CAPACITY
RECOVERY @ 70 °F [21°
C] RISE
RELIEF VALVE SETTING
FUEL ELECTRICAL MOTOR
REMARKS
TYPE
INLET PRESSURE FLOW NOMINAL POWER, EA.
PHASE VOLT
GAL [L] GAL/HR [L/HR] PSIG [kPa] IN WG [Pa] CFH [L/H] HP [kW]
GWH-1 PENTHOUSE BUILDING 22 DOMESTIC HOT WATER STORAGE 100 [ 380 ] 255 [ 970 ] 150 [ 1000 ] NATURAL GAS 14 [ 3500 ] 150 [ 4200 ] .25 [ 190 ] 1 120 1, 2
REMARKS:
1. SET OUTLET TEMPERATURE TO 140 DEG F.
2. PROVIDE WITH CONCRETE EQUIPMENT PAD.
DOMESTIC WATER THERMAL EXPANSION TANK SCHEDULE
MARK LOCATION TYPE
SYSTEM TEMPERATURE RANGE
INITIAL PRESSURE IN
TANK
MAX OPERATING
PRESSURE
RELIEF VALVE PSIG [kPA] MIN TANK VOLUME MIN ACCEPT VOLUME PIPE SIZE TO TANK
REMARKSMIN MAX
°F [°C] °F [°C] PSIG [kPa] PSIG [kPa] PSIG [kPa] GAL [L] GAL [L] IN [mm]
ET-1 PENTHOUSE
POTABLE THERMAL
EXPANSION TANK
40 [ 4 ] 180 [ 82 ] 60 [ 410 ] 80 [ 550 ] 150 [ 1000 ] 9.21 [ 35 ] 5.25 [ 20 ] 3/4 [20] -----
GAS PRESSURE REGULATOR
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM AND/OR
SERVICE
TYPE
CAPACITY INLET PRESSURE INLET SIZE OUTLET PRESSURE OUTLET SIZE
REMARKSSERVES
CFH [L/HR] PSIG [kPa] IN [mm] PSIG IN WG [kPa] IN [mm]
GPR-1 EXTERIOR BUILDING 22 NATURAL GAS MAIN SUPPLY LINE LINE 964 [ 27000 ] 2 [ 14 ] 1.5 [40] 1.0 28.0 [7] 1.5 [40] 1, 2
GPR-2 LAB G36 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-3 LAB G36 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-4 LAB G36 BUILDING 22
CEILING PANELS &
FUME HOOD
SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-5 PRIVATE LAB G36A BUILDING 22 FUME HOOD SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-6 LABORATORY 120 BUILDING 22
CEILING PANELS &
FUME HOOD
SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-7 LABORATORY 120 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-8 LABORATORY 120 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-9
LABORATORY
120/124 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-10 LABORATORY 124 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-11 LABORATORY 124 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-12 LABORATORY 124 BUILDING 22
CEILING PANELS &
FUME HOOD
SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-13 LABORATORY 104 BUILDING 22
CEILING PANELS &
FUME HOOD
SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-14 LABORATORY 104 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-15
LABORATORY
103/104 BUILDING 22 CEILING PANELS SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-16 LABORATORY 103 BUILDING 22
CEILING PANELS &
FUME HOOD
SERVICE 116 [ 3300 ] 1 [ 7 ] 0.5 [15] 0.5 14.0 [3.5] 0.5 [15] 1
GPR-17 PENTHOUSE BUILDING 22 GWH-1 SERVICE 242 [ 6900 ] 1 [ 7 ] 0.75 [20] 0.5 14.0 [3.5] 0.5 [15] 1
REMARKS:
1. REFER TO NATURAL GAS SCHEMATIC DIAGRAM ON SHEET PL-602 FOR MORE INFORMATION.
2. PROVIDE WITH INTERNAL RELIEF.
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
NATURAL GAS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /A n n A rb o r
V A
M o d e rn iz e B ld g
/F
F E
A n n A rb o r
M o d e rn iz e
B
M E
P rv t
/2
/2
:4
:4
A M
PL601
PLUMBING SCHEDULES
09/02/2022 PP GP
MODERNIZE BUILDING 22 506-21-102
ANN ARBOR, MICHIGAN
100% BID DOCUMENTS
ANN ARBOR
VAMC
Approved: Veteran's Affairs Medical Center
No. Revisions: Date:
100% BID DOCUMENTS 09/02/2022
1 ADDENDUM 01 02/14/2023
2 ADDENDUM 02 03/02/2023
09/02/2022
| Sheets |
| PL601 - PLUMBING SCHEDULES |
File details come from the government source that posted it. Updated .