This document contains a justification for a single source award and details of a related federal contract opportunity for construction services. The justification is for awarding a contract to Johnson Controls, Inc. (JCI) to provide a Simplex fire alarm system for a project to remodel Building 22 at the LTC Charles S. Kettles VA Medical Center in Ann Arbor, Michigan. The existing fire alarm system is Simplex and only a JCI Simplex system can ensure 100% integration with the hardware and software of the existing system. The related federal contract opportunity is a pre-solicitation notice for an invitation for bids for the construction project, estimated between $5-10 million. The solicitation is planned for release on November 30th and is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. The award is intended within 120 days of bid opening.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT

Last Updated: 02/01/22 Page 1 of 1

DEPARTMENT OF VETERANS AFFAIRS

Justification for Single Source Awards IAW FAR 13.106-1 For

Over Micro-Purchase Threshold but Not Exceeding the SAT ($250K)

Acquisition Plan Action ID: 36C250-22-AP-6808 2237: 506-23-1-586-0009

1. Contracting Activity: Department of Veterans Affairs, VISN 10, LTC Charles S. Kettles VA Medical Center.

2. Brief Description of Supplies/Services required and the intended use/Estimated Amount:

Work includes general construction, demolition, and new construction for the Modernize Building 22, Project # 506-21-102. This project completely remodels Building 22. Building 22 is a 1970’s era Research facility and it will be fully updated to modern standards. For this J&A, the fire Alarm system for this building is required to b Simplex as manufactured and provided by JCI. This fire alarm system for this building must be 100% integral with the facility fire alarms system to ensure full compliance with all applicable codes and standards as they apply to this Tier 1 Medical Facility.

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:

The brand name only requirement is for the JCI Simplex Fire Alarm System. This project is adding onto the facilities existing Fire Alarm System and all elements of the new fire alarm systems to be provided shall integrate 100% in all ways feasible with the existing system. This is true for both hardware and software. The only known way to ensure 100% integration is to utilize software and key components of the control’s hardware as manufactured, installed, and programmed by JCI Simplex.

4. Description of market research conducted and results or statement why it was not conducted: The existing fire alarm system is comprised of Simplex Grinnell equipment including the master annunciation panel and monitoring systems. Use of an alternate system components or vendor would require different types of equipment that are incompatible with the current fire alarm system. This would pose a potential risk of inoperable life safety system control, downtime, and cost to the facility. A second vendor working on the same system could result in downtime to the system, resulting in a safety issue.

5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

SCOTT D. BRENNAN Date Contracting Officer

Scott D. Brennan 250586

Digitally signed by Scott D. Brennan 250586 Date: 2022.12.28 16:37:08 -05'00'