Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf

PDF 507 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document contains a pre-solicitation announcement and description for an upcoming invitation for bid. The Department of Veterans Affairs intends to solicit fixed price bids for a construction project to modernize Building 22 at the Ann Arbor Veterans Medical Center in Michigan. Work includes furnishing all labor, materials, equipment and supervision to complete the project according to provided drawings and specifications. The project scope and estimated value range from $5 to $10 million. The solicitation is anticipated to be issued on November 30th, 2022 via the System for Award Management website. The North American Industry Classification for this procurement is commercial and institutional building construction. The contract is a 100% set aside for qualified Service-Disabled Veteran Owned Small Businesses. The agency aims to award a firm fixed price contract within 120 days of bid opening. All questions must be submitted in writing to the specified contracting officer by the specified date.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T T

T

T

T

T

T

T

T

T

T

T

TT

T

T T

T

T

T

T

T

LAB

G36

ELEVATOR

Z1

UNISEX TOILET

G16

UNISEX TOILET

G15

TELECOMM.

G13 H.A.C.

G09

CYLINDER STORAGE

G34

ELECTRIC ROOM

G18B

STAIR-1

S1-1

ELECTRIC ROOM

G18A

KITCHEN

G19A

VMU BEHAVIOR ROOM

G30

CONFERENCE ROOM

G19E

RECORDS

G10

LOBBY

C-G3

OPEN OFFICE

G08

VMU SOUND

G31

CORRIDOR

C-G7

CORRIDOR

C-G4

CORRIDOR

C-G8

CORRIDOR

TOILET

G22

RESEARCH SERVICE

G19

OPEN OFFICE

G20

OFFICE

G20B

OFFICE

G20C

EXAM

G01

EXAM

G02

OFFICE/ FUTURE EXAM

G05

OPEN OFFICE

G06 EXAM

G03

EXAM

G04

SHARED OFFICE

G20A

H.A.C.

G21

EQUIPMENT

G12

OFFICE/ FUTURE EXAM

G07

CORRIDOR

C-G5

CORRIDOR

C-G2

2 3 4 5

E

D

C

B

1" HWR

1" HWS

1" HWR

1" HWS

TU-01_01

TU-01_05

TU-01_06

TU-01_07

TU-01_04

TU-01_02

TU-01_03

RWC-02-01

RWC-02-04

RWC-02-06

RWC-02-03

TU-03_06

TU-03_07

TU-03_05

TU-03_04

TU-03_09

TU-03_08

TU-03_01

TU-03_02

TU-03_03

TU-02_03 RWC-02-02

SV-02-02 SV-02-03

SV-02-01

SV-02-04

SV-02-06

3" HPS

1 1/2" PC

OFFICE

G41

CORRIDOR

C-G10

OFFICE

G42

OFFICE

G40

STORAGE

G43

TU-02_02

1" HWS

1" HWR

1 1/2" HWR

1 1/2" HWS

3/4" HWS

3/4" HWR

1 1/4" HWS

1 1/4" HWR

7 ADR-01-01

ADR-01-02

SV-02-05

SV-02-07

RWC-02-07

RWC-02-05

MICROSCOPE

G11

EV-L1-07

EV-L1-04

EV-L1-02

EV-L1-01 EV-L1-08

EV-L1-22

EV-L1-05

EV-L1-03

ACCU-2

3/4" D

9 10

3/4" HWS

3/4" HWR

3/4" HWS

3/4" HWR

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

1 1/4" HWR

1 1/4" HWS

STAIR 1

MACHINE ROOM

ELECTRIC SERVICE ROOM

CORRIDOR

MECH ROOM

22-CP-1

E

D

C

B

1 1/2" PC

2" MPR

1 1/4" STV1

2" STV

1 1/4" LPR

3/4" HPR

22-FT-1

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/1

/2

:2

:0

P

M

MP101

BASEMENT AND GROUND FLOOR

PIPING PLAN

09/02/2022 KF JG

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

N

1/8" = 1'-0"

GROUND FLOOR PIPING PLAN

D R A W I N G N O T E S :

1 PROVIDE CONTROL WIRING FROM THERMOSTAT TO TU-03_05.

2 PUMPED CONDENSATE, STEAM VENT, AND MEDIUM PRESSURE STEAM CONDENSATE DOWN CHASE TO BASEMENT.

REFER TO "BASEMENT PIPING PLAN" ON THIS SHEET FOR CONTINUATION.

3 HEATING HOT WATER SUPPLY AND RETURN, HIGH PRESSURE STEAM, STEAM VENT, HIGH PRESSURE STEAM

CONDENSATE, MEDIUM PRESSURE STEAM CONDENSATE, AND LOW PRESSURE STEAM CONDENSATE UP CHASE TO

FIRST FLOOR. REFER TO MP102 FOR CONTINUATION.

4 PROVIDE DRIP TRAP AT THE BASE OF THE HIGH PRESSURE STEAM RISER. CONNECT PIPING INTO THE HIGH PRESSURE

STEAM CONDENSATE RETURN LINE.

5 PUMPED CONDENSATE, STEAM VENT, HIGH PRESSURE STEAM CONDENSATE, MEDIUM PRESSURE STEAM CONDENSATE, AND LOW PRESSURE STEAM CONDENSATE UP TO GROUND FLOOR. REFER TO MP101 FOR CONTINUATION.

6 REINSTALL AIR DATA ROUTER AND RECONNECT STRUCTURED CABLE TO SENSOR SUITE. ROUTE STRUCTURED CABLE

FROM DUCT PROBES TO AIR DATA ROUTER. SEE DASHED LINE FOR APPROXIMATE PROBE LOCATION.

7 ROUTE STRUCTURED CABLE FROM DUCT PROBES TO EXISTING AIR DATA ROUTER. SEE DASHED LINE FOR

APPROXIMATE PROBE LOCATION.

8 INSTALL CONDENSATE PUMP ON CONCRETE EQUIPMENT BASE. PROVIDE CONDENSATE PUMP VENT SAME SIZE AS

OUTLET.

9 PROVIDE SECONDARY DRAIN PAN AND CONDENSATE PUMP FOR AIR-COOLED CONDENSING UNIT. PROVIDE DRAIN

SECONDARY DRAIN PAN FLOAT SWITCH. SEND ALARM TO THE BAS AND SHUT DOWN THE AIR-COOLED CONDENSING

UNIT.

10 DRAIN PIPING DOWN TO MOP SINK. TERMINATE PIPING 1" ABOVE MOP SINK TO MAINTAIN AIR GAP.

11 PROVIDE 2" FLASH TANK PIPE MANIFOLD.

12 IF DEDUCT ALTERNATE 1 IS ACCEPTED, REMOVE ALL WORK IN ENCLOSED REGION.

N

1/8" = 1'-0"

BASEMENT PIPING PLAN

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

1 ADDENDUM 01 02/14/2023

09/02/2022

Sheets
MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN

File details come from the government source that posted it. Updated .