Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf
PDF 507 KB Posted
- Attached to
- Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
- Solicitation number
- 36C25023B0005
About this file
This document contains a pre-solicitation announcement and description for an upcoming invitation for bid. The Department of Veterans Affairs intends to solicit fixed price bids for a construction project to modernize Building 22 at the Ann Arbor Veterans Medical Center in Michigan. Work includes furnishing all labor, materials, equipment and supervision to complete the project according to provided drawings and specifications. The project scope and estimated value range from $5 to $10 million. The solicitation is anticipated to be issued on November 30th, 2022 via the System for Award Management website. The North American Industry Classification for this procurement is commercial and institutional building construction. The contract is a 100% set aside for qualified Service-Disabled Veteran Owned Small Businesses. The agency aims to award a firm fixed price contract within 120 days of bid opening. All questions must be submitted in writing to the specified contracting officer by the specified date.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T T
T
T
T
T
T
T
T
T
T
T
TT
T
T T
T
T
T
T
T
LAB
G36
ELEVATOR
Z1
UNISEX TOILET
G16
UNISEX TOILET
G15
TELECOMM.
G13 H.A.C.
G09
CYLINDER STORAGE
G34
ELECTRIC ROOM
G18B
STAIR-1
S1-1
ELECTRIC ROOM
G18A
KITCHEN
G19A
VMU BEHAVIOR ROOM
G30
CONFERENCE ROOM
G19E
RECORDS
G10
LOBBY
C-G3
OPEN OFFICE
G08
VMU SOUND
G31
CORRIDOR
C-G7
CORRIDOR
C-G4
CORRIDOR
C-G8
CORRIDOR
TOILET
G22
RESEARCH SERVICE
G19
OPEN OFFICE
G20
OFFICE
G20B
OFFICE
G20C
EXAM
G01
EXAM
G02
OFFICE/ FUTURE EXAM
G05
OPEN OFFICE
G06 EXAM
G03
EXAM
G04
SHARED OFFICE
G20A
H.A.C.
G21
EQUIPMENT
G12
OFFICE/ FUTURE EXAM
G07
CORRIDOR
C-G5
CORRIDOR
C-G2
2 3 4 5
E
D
C
B
1" HWR
1" HWS
1" HWR
1" HWS
TU-01_01
TU-01_05
TU-01_06
TU-01_07
TU-01_04
TU-01_02
TU-01_03
RWC-02-01
RWC-02-04
RWC-02-06
RWC-02-03
TU-03_06
TU-03_07
TU-03_05
TU-03_04
TU-03_09
TU-03_08
TU-03_01
TU-03_02
TU-03_03
TU-02_03 RWC-02-02
SV-02-02 SV-02-03
SV-02-01
SV-02-04
SV-02-06
3" HPS
1 1/2" PC
OFFICE
G41
CORRIDOR
C-G10
OFFICE
G42
OFFICE
G40
STORAGE
G43
TU-02_02
1" HWS
1" HWR
1 1/2" HWR
1 1/2" HWS
3/4" HWS
3/4" HWR
1 1/4" HWS
1 1/4" HWR
7 ADR-01-01
ADR-01-02
SV-02-05
SV-02-07
RWC-02-07
RWC-02-05
MICROSCOPE
G11
EV-L1-07
EV-L1-04
EV-L1-02
EV-L1-01 EV-L1-08
EV-L1-22
EV-L1-05
EV-L1-03
ACCU-2
3/4" D
9 10
3/4" HWS
3/4" HWR
3/4" HWS
3/4" HWR
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
1 1/4" HWR
1 1/4" HWS
STAIR 1
MACHINE ROOM
ELECTRIC SERVICE ROOM
CORRIDOR
MECH ROOM
22-CP-1
E
D
C
B
1 1/2" PC
2" MPR
1 1/4" STV1
2" STV
1 1/4" LPR
3/4" HPR
22-FT-1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /A n n A rb o r
V A
M o d e rn iz e B ld g
/F
F E
A n n A rb o r
M o d e rn iz e
B
M E
P rv t
/1
/2
:2
:0
P
M
MP101
BASEMENT AND GROUND FLOOR
PIPING PLAN
09/02/2022 KF JG
MODERNIZE BUILDING 22 506-21-102
ANN ARBOR, MICHIGAN
100% BID DOCUMENTS
ANN ARBOR
VAMC
Approved: Veteran's Affairs Medical Center
N
1/8" = 1'-0"
GROUND FLOOR PIPING PLAN
D R A W I N G N O T E S :
1 PROVIDE CONTROL WIRING FROM THERMOSTAT TO TU-03_05.
2 PUMPED CONDENSATE, STEAM VENT, AND MEDIUM PRESSURE STEAM CONDENSATE DOWN CHASE TO BASEMENT.
REFER TO "BASEMENT PIPING PLAN" ON THIS SHEET FOR CONTINUATION.
3 HEATING HOT WATER SUPPLY AND RETURN, HIGH PRESSURE STEAM, STEAM VENT, HIGH PRESSURE STEAM
CONDENSATE, MEDIUM PRESSURE STEAM CONDENSATE, AND LOW PRESSURE STEAM CONDENSATE UP CHASE TO
FIRST FLOOR. REFER TO MP102 FOR CONTINUATION.
4 PROVIDE DRIP TRAP AT THE BASE OF THE HIGH PRESSURE STEAM RISER. CONNECT PIPING INTO THE HIGH PRESSURE
STEAM CONDENSATE RETURN LINE.
5 PUMPED CONDENSATE, STEAM VENT, HIGH PRESSURE STEAM CONDENSATE, MEDIUM PRESSURE STEAM CONDENSATE, AND LOW PRESSURE STEAM CONDENSATE UP TO GROUND FLOOR. REFER TO MP101 FOR CONTINUATION.
6 REINSTALL AIR DATA ROUTER AND RECONNECT STRUCTURED CABLE TO SENSOR SUITE. ROUTE STRUCTURED CABLE
FROM DUCT PROBES TO AIR DATA ROUTER. SEE DASHED LINE FOR APPROXIMATE PROBE LOCATION.
7 ROUTE STRUCTURED CABLE FROM DUCT PROBES TO EXISTING AIR DATA ROUTER. SEE DASHED LINE FOR
APPROXIMATE PROBE LOCATION.
8 INSTALL CONDENSATE PUMP ON CONCRETE EQUIPMENT BASE. PROVIDE CONDENSATE PUMP VENT SAME SIZE AS
OUTLET.
9 PROVIDE SECONDARY DRAIN PAN AND CONDENSATE PUMP FOR AIR-COOLED CONDENSING UNIT. PROVIDE DRAIN
SECONDARY DRAIN PAN FLOAT SWITCH. SEND ALARM TO THE BAS AND SHUT DOWN THE AIR-COOLED CONDENSING
UNIT.
10 DRAIN PIPING DOWN TO MOP SINK. TERMINATE PIPING 1" ABOVE MOP SINK TO MAINTAIN AIR GAP.
11 PROVIDE 2" FLASH TANK PIPE MANIFOLD.
12 IF DEDUCT ALTERNATE 1 IS ACCEPTED, REMOVE ALL WORK IN ENCLOSED REGION.
N
1/8" = 1'-0"
BASEMENT PIPING PLAN
No. Revisions: Date:
100% BID DOCUMENTS 09/02/2022
1 ADDENDUM 01 02/14/2023
09/02/2022
| Sheets |
| MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN |
File details come from the government source that posted it. Updated .