Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf

PDF 354 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation notice announces the Department of Veterans Affairs' intent to issue an invitation for bids for the modernization of Building 22 at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project scope includes furnishing all labor, materials, equipment, and supervision to complete the work according to drawings and specifications. The estimated cost range for the project is between $5 million and $10 million. The NAICS code is 236220 for commercial and institutional building construction, with a small business size standard of $16.5 million. The acquisition is reserved entirely for qualified Service-Disabled Veteran Owned Small Businesses. The eventual contract award will be a firm fixed-price contract. The solicitation is expected to be released on November 30th, 2022 via the System for Award Management website. All questions must be submitted in writing to the named contracting officer by the specified due date.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES:

PROVIDE RESTRAINING CLAMPS 2438mm [8'-0"] O.C.

SECURE TO ROOF SLAB WITH (4)

8.0mm [3/8"]⌀ EXPANSION BOLTS

OR WELD TO STEEL DECK

CONCRETE ROOF SLAB OR

STEEL ROOF DECK

WELD PLATE TO

PIPE

203x203x8.0mm [8"x8"x3/8"] STEEL PLATE

ROOF SURFACE

ROOF SYSTEM INSULATION

AND MEMBRANE

PRE-MOULDED FLEXIBLE

PIPE COUNTER FLASHING

CLAMPING RING

WELD PIPE SADDLE

SUPPORT TO PIPE. PROVIDE

WATER TIGHT CONNECTION

HIGH COMPRESSIVE

STRENGTH INSULATION

INSERT UNDER SHIELD

PROVIDE VAPOR BARRIER AS

SPECIFIED ON PIPING

CONVEYING FLUID TO

DEGREE #C° [#°F] OR LOWER

PROVIDE

ALUMINUM JACKET

PIPE AND

INSULATION

INSULATION

PROTECTION SHEILD

50mm [2"] STEEL PIPE

65mm [2-1/2"]

STEEL PIPE

SEALANT

0m m

0m m

[8

[4

0m m

[1 2"

M

IN

NOTE:

NOT REQUIRED FOR AIR

TERMINAL UNITS.

SEISMIC BRACING FOR LIGHT

SUSPENDED EQUIPMENT

FLOOR MOUNT EQUIPMENT

RESTRAINED BY RESILIENT PADS

(TYPE DS)

RESILIENT

PAD

FLOOR

BONDED STEEL

PLATE

NEOPRENE WASHER

& SLEEVE

ANCHOR

BOLT

EQUIPMENT

BASE

EQUIPMENT WEIGHT

250 LBS. [114KG] OR

LESS

LOCK

NUTS

(TYP)

HANGER

ROD

(TYP)

CLAMP

CROSS BRACING

RODS ALL FOUR

SIDES

DESIGNER'S NOTE:

GATE VALVES SHALL BE INDICATED ON EITHER SIDE OF AIR SEPARATOR AS REQUIRED BY CLOSENESS OF VALVES SERVING ADJACENT EQUIPMENT. WHERE CHARGING OF TANK IS PROPOSED PROVIDE NECESSARY TAPPINGS. PROVIDE AND SHOW A LOW WATER ALARM ON CHARGED SYSTEMS TO INDICATE NO WATER IN TANK.

D

D

MV

FLOOR MOUNTING BASE RING WITH DRAIN

ACCESS OPENING SHOWN. ANGLE IRON

LEGS MAY BE USED AS AN OPTION.

150mm [6"]

HOUSEKEEPING PAD

COLD WATER FILL LINE. SEE

EXPANSION TANK SCHEDULE FOR

SIZE

DRAIN

FROM SYSTEM

RUN DRAIN LINE TO

NEAREST FD

UNLESSINDICATED

OTHERWISE

D R

A

IN

TO PUMP

SUCTION

AIR SEPARATOR

SEE NOTES 1 & 2

HANGER RODS

(TYP)

CONNECTOR PIPE.

BLADDER EXPANSION

TANK

REDUCED PRESSURE ZONE BACKFLOW

PREVENTER

NC

BUTTERFLY OR

BALL ISOLATION

VALVE

RUN DRAIN LINE TO

NEAREST FD

AIR CHARGING

SHRAEDER VALVE

AUTO. AIR VENT TO DRAIN

PI

OMIT PRESSURE GAUGE LINE

IF STRAINER IS NOT

INCLUDED.

NOTES:

1. SEE EXPANSION TANK SYSTEM SCHEDULE FOR

COMPONENT SIZES.

2. FOR HOT WATER SYSTEMS 50mm [2"] AND SMALLER

AND CHILLED WATER SYSTEMS USE IN-LINE AIR

PURGER IN LIEU OF AIR SEPARATOR.

3. SET PRESSURE REDUCING VALVE SO PRESSURE AT

HIGHEST POINT IN SYSTEM HAS A MINIMUM OF 28kPa

[4 PSIG].

4. PROVIDE STRAINER IN AIR SEPARATOR IF INDICATED

IN EXPANSION TANK SCHEDULE.

5. RELIEF VALVE FOR CHILLED WATER SYSTEM IS

SHOWN. OMIT WHEN RELIEF VALVE IS SHOWN ON

HEAT EXCHANGER DETAIL AND SYSTEM IS USED

ONLY FOR HOT WATER HEATING.

REFER TO PLUMBING

DRAWINGS FOR

SCOPE OF WORK

SAFETY VALVE

PROVIDE UNION UNLESS SAFETY

VALVE HAS FLANGED OUTLET

OPEN DRAIN (NOTE 3)

CONNECTION TO

PRESSURE VESSEL OR PIPE

VENT PIPE THROUGH ROOF SUPPORT AS

INDICATED PM DWGS. (NOTES 1, 2)

PIPE THREADED INTO ELBOW (SAME

SIZE AS ELBOW)

DRIP PAN ELBOW

(SECTIONAL VIEW)

FLEXIBLE CONNECTOR

D

610mm

[24" MAX]

76mm [3"] m m [1

M

IN

20mm [3/4"] DRAIN TO

FLOOR DRAIN OR OPEN

SIGHT DRAIN (NOTE 4)

ELEVATION

NOTES:

1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN ANSI B31.1 POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO VERTICAL THRU THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL BE NO MORE THEN A TOTAL OR 180 DEGREES IN DIRECTIONAL CHANGES MADE WITH 45 DEG. ELBOWS.

2. VENT PIPE SHALL TERMINATE 1829mm [6"] MIN. ABOVE FINISHED ROOF.

3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHERE PERSONNEL MAY OCCUPY.

4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.

5. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

SMACNA FIGURE 4-6 45°

LEED IN RIGID DUCT TO AIR

TERMINAL UNIT.

MAIN SUPPLY

PLAN VIEW

FLOW

F

LO

W

HOUSING WELDED

TO DUCT SECTION

ROUND OR

FLAT OVAL

DUCT SECTION

COVER WITH HANDLE

AND CHAIN RETAINER

GASKETED AND

PRESSURE SEALED

STEAM

HUMIDIFER

NOTES:

1. TRANSITION WELDED STAINLESS STEEL 4'[1.22M] UPSTREAM OF

HUMIDIFIER AND 8' [2.44M] DOWNSTREAM OF HUMIDIFIER.

2. DETAIL ONLY APPLICABLE TO AHU'S WITHOUT AFTER FILTER

DOWNSTREAM OF THE SUPPLY AIR FAN.

3. INTEGRAL STAINLESS STEEL DRAIN PAN SLOPE FROM ALL

DIRECTIONS TO DRAIN CONNECTION. SLOPE .125" PER 1'-0" [0.3

CM PER 0.3 M].

4. PROVIDE MIN. 18" [45 CM] WIDE ACCESS DOOR, DIRECTLY

UPSTREAM AND DOWNSTREAM OF HUMIDIFIER.

AIR HANDLING UNIT

NOTE 1

MPS/LPS

ACCESS

DOOR

NOTE 4

ACCESS

DOOR

NOTE 4

ROUTE TO

FLOOR SINK

NOTE 3

AIRFLOW

MPR/LPR

4'-0"

[1.22M]

8'-0"

[2.44M]

42" MAX

[106.7 CM]

FROM STEAM

TRAPS

0 - 150*C [30 - 300*F]

(TYPICAL)

0 - 100 kPa

[0 - 15 PSIG]

FLASH TANK

GRAVITY FLOW TO

CONDENSATE RETURN

PUMP SET

H P

R

M P

R

V T

R

TANGENTIAL INLET

LP

R

FLOAT AND

THERMOSTATIC

STEAM TRAP

FINISHED

FLOOR

HEATING COIL

2-POSITION

CONTROL VALVE

CABINET

SHUTOFF VALVE

HWR

HWS

PIPE HANGER SHALL

SUPPORT PIPING

INDEPENDENT OF

COIL (TYP.)

PITCH COIL DOWN 8mm

[1/4"] PER FOOT TO

CONDENSATE OUTLET

FULL SIZE

TAPPING

PRESSURE GAGE

SCALE POCKET

SEE NOTE

NO. 4

STEAM CONDENSATE

RETURN

15mm [1/2"] C

HECK

VALVE VACUUM

BREAKER

INCREASER,

IF REQUIRED

REDUCER, IF

REQUIRED

STEAM SUPPLY

0m m

[6

M

IN

0m m

[1 2"

M

IN

NOTES:

1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION

ISOLATOR UNITS, THE RUNOUT PIPING FOR CONNECTIONS TO

COIL SHALL BE INSTALLED WITH SWING JOINTS TO ALLOW FOR

THE VIBRATION.

2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT

BLOCK THE SWING OR USE OF ACCESS DOORS OR PANELS;

NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALVES,

OR EQUIPMENT.

3. TRAP EACH COIL SEPARATELY WHEN INSTALLED IN A BANK OF

TWO OR MORE HIGH. ALSO PROVIDE SEPARATE VACUUM

BREAKER FOR EACH COIL.

4. TWO TRAP ASSEMBLIES IN PARALLEL ARE SHOWN. TWO TRAPS

REQUIRED WHEN CONDENSATE LOAD IS 2400 KG/HR [5,000

LBS/HR] OR GREATER.

5. SUPPLY & RETURN PIPES ARE SHOWN FROM SAME END. REHEAT

COIL MAY HAVE SUPPLY & RETURN PIPES FROM OPPOSITE ENDS.

DESIGNER'S NOTE:

FOR VACUUM RETURN SYSTEMS CONNECT 15mm [1/2"] CHECK VALVE

VACUUM BREAKER INTO DISCHARGE SIDE OF TRAP SET. CHANGE F &

T TRAP SET TO SHOW PIPING LOCATION CONNECTION.

12"

MAX

12"

MAX

12"

MAX

12"

MAX

REHEAT COIL.

(REFER TO M503 FOR

DETAIL ON TERMINAL

UNIT WATER COILS -

PIPING CONNECTION)

RECTANGULAR

TRANSITION

SINGLE VALVE

DRAWBAND CLAMPS

SINGLE VALVE

DRAWBAND CLAMPS

PROVIDE CORROSION

RESISANT MATERIAL

BETWEEN DRAWBAND

AND DUCTWORK

VAV ACTUATOR.

PIVOT ARM

CONNECTION

HANGER STOCK

ATTACHED TO

DUCTWORK

HANGER SHOULD BE

NO MORE THAN

12 in AWAY MAX.

HANGER STOCK

ATTACHED TO

DUCTWORK

HANGER SHOULD BE

NO MORE THAN

12 in AWAY MAX.

VAV ACTUATOR.

PIVOT ARM CONNECTION

WELDED STAINLESS

STEEL DUCT

DIRECTION OF

AIRFLOW

DIRECTION OF

AIRFLOW

ALLOW 9" OF UNOBSTRUCTED

SPACE IN THE INLET SIDE OF

THE DUCT FOR THE SHAFT TO

REACH THE MAXIMUM FLOW

POSITION.

ALLOW 9" OF UNOBSTRUCTED

SPACE IN THE INLET SIDE OF

THE DUCT FOR THE SHAFT TO

REACH THE MAXIMUM FLOW

POSITION.

SUPPLY VENTURI VALVE

EXHAUST VENTURI VALVE

MAINTAIN ACCESS TO CONTROLLER,

ACTUATOR, AND LINKAGE.

MAINTAIN ACCESS TO CONTROLLER,

ACTUATOR, AND LINKAGE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/1

/2

:2

:0

P

M

M504

MECHANICAL DETAILS

09/02/2022 KF JG

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

NTS

DETAIL FOR SUPPORTING PIPE ON ROOF

NTS

SEISMIC BRACING FOR EQUIPMENT

NTS

FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS

NTS

STEAM SAFETY VALVE

NTS

ALTERNATE SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS

NTS

ACCESS SECTION FOR ROUND/OVAL DUCT

NTS

DUCT MOUNTED HUMIDIFIER

NTS

FLASH TANK

NTS

CONVECTOR - HOT WATER PIPING CONNECTION

NTS

STEAM COIL - PIPING CONNECTIONS

NTS

SUPPLY AND EXHAUST VENTURI VALVE CONNECTION

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

1 ADDENDUM 01 02/14/2023

09/02/2022

Sheets
M504 - MECHANICAL DETAILS