Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf
PDF 354 KB Posted
- Attached to
- Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
- Solicitation number
- 36C25023B0005
About this file
This pre-solicitation notice announces the Department of Veterans Affairs' intent to issue an invitation for bids for the modernization of Building 22 at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project scope includes furnishing all labor, materials, equipment, and supervision to complete the work according to drawings and specifications. The estimated cost range for the project is between $5 million and $10 million. The NAICS code is 236220 for commercial and institutional building construction, with a small business size standard of $16.5 million. The acquisition is reserved entirely for qualified Service-Disabled Veteran Owned Small Businesses. The eventual contract award will be a firm fixed-price contract. The solicitation is expected to be released on November 30th, 2022 via the System for Award Management website. All questions must be submitted in writing to the named contracting officer by the specified due date.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTES:
PROVIDE RESTRAINING CLAMPS 2438mm [8'-0"] O.C.
SECURE TO ROOF SLAB WITH (4)
8.0mm [3/8"]⌀ EXPANSION BOLTS
OR WELD TO STEEL DECK
CONCRETE ROOF SLAB OR
STEEL ROOF DECK
WELD PLATE TO
PIPE
203x203x8.0mm [8"x8"x3/8"] STEEL PLATE
ROOF SURFACE
ROOF SYSTEM INSULATION
AND MEMBRANE
PRE-MOULDED FLEXIBLE
PIPE COUNTER FLASHING
CLAMPING RING
WELD PIPE SADDLE
SUPPORT TO PIPE. PROVIDE
WATER TIGHT CONNECTION
HIGH COMPRESSIVE
STRENGTH INSULATION
INSERT UNDER SHIELD
PROVIDE VAPOR BARRIER AS
SPECIFIED ON PIPING
CONVEYING FLUID TO
DEGREE #C° [#°F] OR LOWER
PROVIDE
ALUMINUM JACKET
PIPE AND
INSULATION
INSULATION
PROTECTION SHEILD
50mm [2"] STEEL PIPE
65mm [2-1/2"]
STEEL PIPE
SEALANT
0m m
0m m
[8
[4
0m m
[1 2"
M
IN
NOTE:
NOT REQUIRED FOR AIR
TERMINAL UNITS.
SEISMIC BRACING FOR LIGHT
SUSPENDED EQUIPMENT
FLOOR MOUNT EQUIPMENT
RESTRAINED BY RESILIENT PADS
(TYPE DS)
RESILIENT
PAD
FLOOR
BONDED STEEL
PLATE
NEOPRENE WASHER
& SLEEVE
ANCHOR
BOLT
EQUIPMENT
BASE
EQUIPMENT WEIGHT
250 LBS. [114KG] OR
LESS
LOCK
NUTS
(TYP)
HANGER
ROD
(TYP)
CLAMP
CROSS BRACING
RODS ALL FOUR
SIDES
DESIGNER'S NOTE:
GATE VALVES SHALL BE INDICATED ON EITHER SIDE OF AIR SEPARATOR AS REQUIRED BY CLOSENESS OF VALVES SERVING ADJACENT EQUIPMENT. WHERE CHARGING OF TANK IS PROPOSED PROVIDE NECESSARY TAPPINGS. PROVIDE AND SHOW A LOW WATER ALARM ON CHARGED SYSTEMS TO INDICATE NO WATER IN TANK.
D
D
MV
FLOOR MOUNTING BASE RING WITH DRAIN
ACCESS OPENING SHOWN. ANGLE IRON
LEGS MAY BE USED AS AN OPTION.
150mm [6"]
HOUSEKEEPING PAD
COLD WATER FILL LINE. SEE
EXPANSION TANK SCHEDULE FOR
SIZE
DRAIN
FROM SYSTEM
RUN DRAIN LINE TO
NEAREST FD
UNLESSINDICATED
OTHERWISE
D R
A
IN
TO PUMP
SUCTION
AIR SEPARATOR
SEE NOTES 1 & 2
HANGER RODS
(TYP)
CONNECTOR PIPE.
BLADDER EXPANSION
TANK
REDUCED PRESSURE ZONE BACKFLOW
PREVENTER
NC
BUTTERFLY OR
BALL ISOLATION
VALVE
RUN DRAIN LINE TO
NEAREST FD
AIR CHARGING
SHRAEDER VALVE
AUTO. AIR VENT TO DRAIN
PI
OMIT PRESSURE GAUGE LINE
IF STRAINER IS NOT
INCLUDED.
NOTES:
1. SEE EXPANSION TANK SYSTEM SCHEDULE FOR
COMPONENT SIZES.
2. FOR HOT WATER SYSTEMS 50mm [2"] AND SMALLER
AND CHILLED WATER SYSTEMS USE IN-LINE AIR
PURGER IN LIEU OF AIR SEPARATOR.
3. SET PRESSURE REDUCING VALVE SO PRESSURE AT
HIGHEST POINT IN SYSTEM HAS A MINIMUM OF 28kPa
[4 PSIG].
4. PROVIDE STRAINER IN AIR SEPARATOR IF INDICATED
IN EXPANSION TANK SCHEDULE.
5. RELIEF VALVE FOR CHILLED WATER SYSTEM IS
SHOWN. OMIT WHEN RELIEF VALVE IS SHOWN ON
HEAT EXCHANGER DETAIL AND SYSTEM IS USED
ONLY FOR HOT WATER HEATING.
REFER TO PLUMBING
DRAWINGS FOR
SCOPE OF WORK
SAFETY VALVE
PROVIDE UNION UNLESS SAFETY
VALVE HAS FLANGED OUTLET
OPEN DRAIN (NOTE 3)
CONNECTION TO
PRESSURE VESSEL OR PIPE
VENT PIPE THROUGH ROOF SUPPORT AS
INDICATED PM DWGS. (NOTES 1, 2)
PIPE THREADED INTO ELBOW (SAME
SIZE AS ELBOW)
DRIP PAN ELBOW
(SECTIONAL VIEW)
FLEXIBLE CONNECTOR
D
610mm
[24" MAX]
76mm [3"] m m [1
M
IN
20mm [3/4"] DRAIN TO
FLOOR DRAIN OR OPEN
SIGHT DRAIN (NOTE 4)
ELEVATION
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM IS NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD CONTAINED IN ANSI B31.1 POWER PIPING CODE, APPENDIX II. THE VENT PIPE SHOULD GO VERTICAL THRU THE ROOF WITH NO TURNS OR ANGLES. WHERE REQUIRED THERE SHALL BE NO MORE THEN A TOTAL OR 180 DEGREES IN DIRECTIONAL CHANGES MADE WITH 45 DEG. ELBOWS.
2. VENT PIPE SHALL TERMINATE 1829mm [6"] MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN SHALL BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS WHERE PERSONNEL MAY OCCUPY.
4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.
5. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
SMACNA FIGURE 4-6 45°
LEED IN RIGID DUCT TO AIR
TERMINAL UNIT.
MAIN SUPPLY
PLAN VIEW
FLOW
F
LO
W
HOUSING WELDED
TO DUCT SECTION
ROUND OR
FLAT OVAL
DUCT SECTION
COVER WITH HANDLE
AND CHAIN RETAINER
GASKETED AND
PRESSURE SEALED
STEAM
HUMIDIFER
NOTES:
1. TRANSITION WELDED STAINLESS STEEL 4'[1.22M] UPSTREAM OF
HUMIDIFIER AND 8' [2.44M] DOWNSTREAM OF HUMIDIFIER.
2. DETAIL ONLY APPLICABLE TO AHU'S WITHOUT AFTER FILTER
DOWNSTREAM OF THE SUPPLY AIR FAN.
3. INTEGRAL STAINLESS STEEL DRAIN PAN SLOPE FROM ALL
DIRECTIONS TO DRAIN CONNECTION. SLOPE .125" PER 1'-0" [0.3
CM PER 0.3 M].
4. PROVIDE MIN. 18" [45 CM] WIDE ACCESS DOOR, DIRECTLY
UPSTREAM AND DOWNSTREAM OF HUMIDIFIER.
AIR HANDLING UNIT
NOTE 1
MPS/LPS
ACCESS
DOOR
NOTE 4
ACCESS
DOOR
NOTE 4
ROUTE TO
FLOOR SINK
NOTE 3
AIRFLOW
MPR/LPR
4'-0"
[1.22M]
8'-0"
[2.44M]
42" MAX
[106.7 CM]
FROM STEAM
TRAPS
0 - 150*C [30 - 300*F]
(TYPICAL)
0 - 100 kPa
[0 - 15 PSIG]
FLASH TANK
GRAVITY FLOW TO
CONDENSATE RETURN
PUMP SET
H P
R
M P
R
V T
R
TANGENTIAL INLET
LP
R
FLOAT AND
THERMOSTATIC
STEAM TRAP
FINISHED
FLOOR
HEATING COIL
2-POSITION
CONTROL VALVE
CABINET
SHUTOFF VALVE
HWR
HWS
PIPE HANGER SHALL
SUPPORT PIPING
INDEPENDENT OF
COIL (TYP.)
PITCH COIL DOWN 8mm
[1/4"] PER FOOT TO
CONDENSATE OUTLET
FULL SIZE
TAPPING
PRESSURE GAGE
SCALE POCKET
SEE NOTE
NO. 4
STEAM CONDENSATE
RETURN
15mm [1/2"] C
HECK
VALVE VACUUM
BREAKER
INCREASER,
IF REQUIRED
REDUCER, IF
REQUIRED
STEAM SUPPLY
0m m
[6
M
IN
0m m
[1 2"
M
IN
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION
ISOLATOR UNITS, THE RUNOUT PIPING FOR CONNECTIONS TO
COIL SHALL BE INSTALLED WITH SWING JOINTS TO ALLOW FOR
THE VIBRATION.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT
BLOCK THE SWING OR USE OF ACCESS DOORS OR PANELS;
NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALVES,
OR EQUIPMENT.
3. TRAP EACH COIL SEPARATELY WHEN INSTALLED IN A BANK OF
TWO OR MORE HIGH. ALSO PROVIDE SEPARATE VACUUM
BREAKER FOR EACH COIL.
4. TWO TRAP ASSEMBLIES IN PARALLEL ARE SHOWN. TWO TRAPS
REQUIRED WHEN CONDENSATE LOAD IS 2400 KG/HR [5,000
LBS/HR] OR GREATER.
5. SUPPLY & RETURN PIPES ARE SHOWN FROM SAME END. REHEAT
COIL MAY HAVE SUPPLY & RETURN PIPES FROM OPPOSITE ENDS.
DESIGNER'S NOTE:
FOR VACUUM RETURN SYSTEMS CONNECT 15mm [1/2"] CHECK VALVE
VACUUM BREAKER INTO DISCHARGE SIDE OF TRAP SET. CHANGE F &
T TRAP SET TO SHOW PIPING LOCATION CONNECTION.
12"
MAX
12"
MAX
12"
MAX
12"
MAX
REHEAT COIL.
(REFER TO M503 FOR
DETAIL ON TERMINAL
UNIT WATER COILS -
PIPING CONNECTION)
RECTANGULAR
TRANSITION
SINGLE VALVE
DRAWBAND CLAMPS
SINGLE VALVE
DRAWBAND CLAMPS
PROVIDE CORROSION
RESISANT MATERIAL
BETWEEN DRAWBAND
AND DUCTWORK
VAV ACTUATOR.
PIVOT ARM
CONNECTION
HANGER STOCK
ATTACHED TO
DUCTWORK
HANGER SHOULD BE
NO MORE THAN
12 in AWAY MAX.
HANGER STOCK
ATTACHED TO
DUCTWORK
HANGER SHOULD BE
NO MORE THAN
12 in AWAY MAX.
VAV ACTUATOR.
PIVOT ARM CONNECTION
WELDED STAINLESS
STEEL DUCT
DIRECTION OF
AIRFLOW
DIRECTION OF
AIRFLOW
ALLOW 9" OF UNOBSTRUCTED
SPACE IN THE INLET SIDE OF
THE DUCT FOR THE SHAFT TO
REACH THE MAXIMUM FLOW
POSITION.
ALLOW 9" OF UNOBSTRUCTED
SPACE IN THE INLET SIDE OF
THE DUCT FOR THE SHAFT TO
REACH THE MAXIMUM FLOW
POSITION.
SUPPLY VENTURI VALVE
EXHAUST VENTURI VALVE
MAINTAIN ACCESS TO CONTROLLER,
ACTUATOR, AND LINKAGE.
MAINTAIN ACCESS TO CONTROLLER,
ACTUATOR, AND LINKAGE.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /A n n A rb o r
V A
M o d e rn iz e B ld g
/F
F E
A n n A rb o r
M o d e rn iz e
B
M E
P rv t
/1
/2
:2
:0
P
M
M504
MECHANICAL DETAILS
09/02/2022 KF JG
MODERNIZE BUILDING 22 506-21-102
ANN ARBOR, MICHIGAN
100% BID DOCUMENTS
ANN ARBOR
VAMC
Approved: Veteran's Affairs Medical Center
NTS
DETAIL FOR SUPPORTING PIPE ON ROOF
NTS
SEISMIC BRACING FOR EQUIPMENT
NTS
FLOOR MOUNTED EXPANSION TANK - PIPING CONNECTIONS
NTS
STEAM SAFETY VALVE
NTS
ALTERNATE SUPPLY DUCT TAKEOFF - AIR TERMINAL UNITS
NTS
ACCESS SECTION FOR ROUND/OVAL DUCT
NTS
DUCT MOUNTED HUMIDIFIER
NTS
FLASH TANK
NTS
CONVECTOR - HOT WATER PIPING CONNECTION
NTS
STEAM COIL - PIPING CONNECTIONS
NTS
SUPPLY AND EXHAUST VENTURI VALVE CONNECTION
No. Revisions: Date:
100% BID DOCUMENTS 09/02/2022
1 ADDENDUM 01 02/14/2023
09/02/2022
| Sheets |
| M504 - MECHANICAL DETAILS |