Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf

PDF 834 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation notice and related drawing file provide details for an upcoming invitation for bids to modernize Building 22 at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project scope includes furnishing all necessary labor, materials, equipment, and supervision specified in the drawings and specifications to complete plumbing upgrades in the building basement. The estimated value is between $5-10 million. The contract type will be firm-fixed-price. The solicitation is designated as a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. The invitation for bids is expected to be issued on November 30th, 2022 via the System for Award Management website. All questions must be submitted in writing to the named contracting specialist by the specified due date.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MACHINE ROOM

STAIR 1

CORRIDOR

ELECTRIC SERVICE ROOM

MECH ROOM

(E) SUMP PUMP

(E) FD

2 3 4 5

E

D

C

B

(E) 3" LW UP

3" SAN UP

3" SAN UP

3" LW UP

3" LW UP

3" LW UP

4" SW UP

3" LW UP

3" LW UP

(E) UG 4" SAN

4" LW UP

3" SW UP

3" LW UP

3" LW UP

4" SAN UP

4" SAN UP 4" LW UP 3" SAN UP

3" SW UP

3" LW UP

3" SAN UP

4" SW UP

3" LW UP

3" LW UP

3" LW UP

3" LW UP

3" LW UP

(E) UG 6" SW

(E) UG 4" LW

UG 6" SWUG 5" SW

UG 3" SW

UG 6" SW

UG 4" SANUG 4" SANUG 4" SAN

UG 4" SAN

UG 3" SAN

UG 4" LW

UG 4" LW

UG 3" LW

UG 4" LW

UG 3" LW

UG 3" LW

UG 4" LW

UG 4" LW

UG 4" LW

(E) UG 3" LW

UG 3" SW

UG 4" LW

C

B

(E) 3" SW

(E) 4" LW

3" LW UP3

(E) 4" SAN

(E) 4" LW

(E) 4" LW

UG 3" LW

G E N E R A L N O T E S:

A. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE ATTENTION OF THE COR IN WRITING ANY

DISCREPANCIES THAT MAY IMPACT THE PROGRESS OF WORK.

B. REFER TO SHEET P100 FOR LEGEND AND ABBREVIATIONS.

C. SAW CUT GROUND FLOOR SLAB AS NECESSARY FOR INSTALLATION OF UNDERGROUND PIPING. BACKFILL AND PATCH FLOOR TO MATCH EXISTING. REFER TO SLAB INFILL DETAIL ON SHEET S101. GROUND FLOOR SLAB IS 5"

THICK CONCRETE.

D. ALL UNDERSLAB DRAINAGE PIPING TO BE MINIMUM 3" IN SIZE.

E. ROUTE PIPING TO AVOID COLUMNS AND FOOTERS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/1

/2

:4

:5

P

M

PL100

BASEMENT PLUMBING NEW WORK

PLAN

09/02/2022 PP GP

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

N

1/8" = 1'-0"

BASEMENT PLUMBING NEW WORK PLAN - PHASE 2

N

1/8" = 1'-0"

BASEMENT PLUMBING NEW WORK PLAN - PHASE 1

D R A W I N G N O T E S :

1 CONNECT NEW LAB WASTE PIPING TO EXISTING AT POINT SHOWN.

2 CONNECT NEW STORM WATER PIPING TO EXISTING AT POINT SHOWN.

3 CORE DRILL THROUGH FLOOR SLAB FOR INSTALLATION OF PIPING THROUGH FLOOR.

4 MINIMIZE INOPERABLE TIME FOR SINK IN USP-800.

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

1 ADDENDUM 01 02/14/2023

09/02/2022

Sheets
PL100 - BASEMENT PLUMBING NEW WORK PLAN