Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf

PDF 346 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document contains a pre-solicitation notice and related federal contract opportunity announcement for the modernization of Building 22 at the Ann Arbor Veterans Affairs Medical Center. The Department of Veterans Affairs intends to issue an invitation for bid on or around November 30th, 2022 for construction services with a magnitude of cost between $5-10 million. The project involves furnishing all labor, materials, equipment and supervision to complete modernization in accordance with provided drawings and specifications. The work is to be performed during normal business hours excluding federal holidays. The NAICS code is 236220 and it is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. The eventual contract will be a firm fixed price award made within 120 days of bid opening. Interested parties should monitor the Contract Opportunities website for solicitation details and amendments on or after November 30th.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VSMC

See Location on Floor Plans

H

L

AI - Supply Air Static Pressure

SA

BI - High Static Shutdown

H L

AI - Supply Air Humidity

H L

AI - MERV 14 Prefilter Differential Pressure

AI - Preheat Coil Leaving Air Temp

BO - Preheating ON/OFF Control Valve

MPR

MPS

STM

IFB

OA

AI - Supply Air Temp

SF

AO - Cooling Valve

CHS

CHR

CHW

BO - Supply Fan Start/Stop

BI - Supply Fan Status

AO - Supply Fan VSMC Speed

BI - Supply Fan VSMC Fault

STM

H L

AI - MERV 7 Prefilter Differential Pressure

BO - Outside Air Damper

BI - Freezestat

30 PSIG STM

ZC

PDS PDS

AO - Humidifier Control Valve

BO - Humidifier Isolation Valve

TT TSL

NC

ZC ZC

ZC

ZC

AI - Cooling Coil Leaving Air Temp

TT

IT

MT TT

HPS

SPS

AO - IFB Damper ZC

AI - Outside Air Temperature

TT

AI - Supply Airflow

TT

AI - Cooling Coil Leaving

Water Temperature

SD

BI - Supply Air Smoke Detector

ZC

NC

BO - Smoke Damper BI - LOW Static Shutdown

L H

LPS

AIR HANDLING UNIT SEQUENCE OF OPERATION: 22-AHU-2

GENERAL

THE AIR HANDLING UNIT SHALL BE CONTROLLED WITH DIRECT DIGITAL CONTROL ACCORDING TO THE FOLLOWING

SEQUENCES. AIR HANDLING UNIT AND EXHAUST FANS SHALL RUN CONTINUOUS.

H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF", THE OUTSIDE AIR DAMPER SHALL BE FULLY CLOSED. WHEN THE UNIT IS

"ON" THE OUTSIDE AIR DAMPER SHALL BE FULLY OPEN.

INTERLOCK THE OPERATION OF 22-EF-2, 22-EF-4, 22-EF-5, AND 22-EF-6 WITH 22-AHU-2.

ALL SETPOINTS SPECIFIED IN THIS SEQUENCE SHALL BE ADJUSTABLE.

FAN OPERATION

THE SUPPLY FANS ARE PROVIDED WITH VARIABLE SPEED MOTOR CONTROLLERS (VSMC). THE SPEED OF ALL SUPPLY FANS (4) IN ARRAY SHALL RAMP UP AND DOWN TOGETHER TO MAINTAIN 1.2" (ADJUSTABLE) OF STATIC PRESSURE AT THE SUPPLY AIR STATIC PRESSURE SENSOR. AIRFLOW SHALL BE TRACKED AT EACH FAN AND INDICATED ON BMS.

FAULT OR FAILURE OF ONE FAN SHALL SEND ALARM TO BAS AND VSMC SHALL STOP FAN. THE REMAINDER FANS SHALL CONTINUE TO RAMP UP AND DOWN TOGETHER TO MAINTAIN THE STATIC PRESSURE SET POINT. ONCE FAILED FAN IS REPAIRED THE START UP OF THE FAN SHALL BE TO MINIMUM SPEEED ON VSMC AND OTHER FANS SHALL RETURN TO MINIMUM SPEED. ONCE MINIMUM SPEED IS ACIEVED, ALL FANS SHALL THEN BEGIN TO RAMP UP AND

DOWN TO MAINTAIN STATIC PRESSURE SET POINT.

THE HIGH STATIC SHUTDOWN SENSOR SHALL PREVENT THE SUPPLY FANS FROM DEVELOPING OVER 4" OF STATIC PRESSURE. IF STATIC PRESSURE EXCEEDS 4", THE SUPPLY FANS SHALL STOP AND THE UNIT SHALL BE SHUT DOWN.

THE HIGH STATIC SHUTDOWN SENSOR WILL REQUIRE MANUAL RESET AT THE DEVICE.

THE LOW STATIC SHUTDOWN SENSOR SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING UNDER -2" OF STATIC ON THE INLET SIDE OF THE FAN. IF STATIC PRESSURE FALLS BELOW -2" OF STATIC, THE SUPPLY FAN STOPS AND THE UNIT SHALL BE SHUT DOWN. THE LOW STATIC SHUTDOWN SENSOR WILL REQUIRED A MANUAL RESET AT THE

DEVICE.

TEMPERATURE CONTROL

THE AIR HANDLING UNIT SHALL ENTER "COOLING MODE" WHENEVER THE OUTDOOR AIR TEMPERATURE IS ABOVE 50

DEG F AND "HEATING MODE" WHENEVER THE OUTDOOR AIR TEMPERATURE IS BELOW 50 DEG F.

IN COOLING MODE, MODULATE THE COOLING VALVE TO MAINTAIN THE COOLING COIL LEAVING AIR TEMPERATURE SETPOINT, 50 DEG F. THE PREHEATING VALVE AND HUMIDIFIER ISOLATION VALVE SHALL BE CLOSED.

IN HEATING MODE, THE PREHEATING ON/OFF CONTROL VALVE SHALL OPEN. THE IFB DAMPER SHALL BE OPEN TO THE BYPASS AND SHALL MODULATE CLOSED TO MAINTAIN THE COOLING COIL LEAVING AIR TEMPERATURE SETPOINT, 50 DEG F. THE COOLING VALVE SHALL BE CLOSED AND THE HUMIDIFIER ISOLATION VALVE SHALL BE OPEN. IF COOLING COIL LEAVING AIR TEMPERATURE SENSOR INDICATES 5 DEG F ABOVE THE SETPOINT THEN CLOSE

PREHEAT CONTROL VALVE UNTIL SENSOR READS 1 DEG F BELOW SETPOINT.

A DISCHARGE AIR TEMPERATURE RESET ROUTINE SHALL START 5 MINUTES AFTER THE DISCHARGE AIR TEMPERATURE ACHIEVES INITIAL SETPOINT OF 50 DEG F. WHEN ANY ROOM THERMOSTAT IS BELOW 72 DEG F THE SEQUENCE WILL INCREASE THE DISCHARGE AIR TEMPERATURE SET POINT BY 1°F EVERY 5 MINUTES. THE ROUTINE SHALL END WHEN DISCHARGE AIR TEMPERATURE ACHIEVES 60°F OR ALL THERMOSTATS ACHIEVE SETPOINT. WHEN A ROOM THERMOSTAT IS HIGHER THAN SETPOINT THE RESET ROUTINE SHALL STOP. WHEN TWO OR MORE ROOM THERMOSTATS IS HIGHER THAN SETPOINT AND VAV BOX IS FULL OPEN THE OPPOSITE OCCURES WITH THE DISCHARGE AIR TEMPERATURE SET POINT DECREASING BY 1°F EVERY 5 MINUTES UNIT ALL THERMOSTATS ARE AT

SETPOINT OR THE DISCHARGE AIR TEMPERATURE ACHIEVES 50 DEG F.

HUMIDITY CONTROL

THE AIR HANDLING UNIT SHALL ENTER "HUMIDIFICATION MODE" WHENEVER THE AIR HANDLING UNIT IS IN HEATING

MODE AND THE EXHAUST AIR HUMIDITY IS BELOW 30%.

IN HUMIDIFICATION MODE, OPEN THE HUMIDIFIER CONTROL VALVE UNTIL THE EXHAUST AIR HUMIDITY IS ABOVE 35%, THEN CLOSE THE HUMIDIFIER CONTROL VALVE.

ALARMS

WHEN THE PREHEAT COIL LEAVING AIR TEMPERATURE IS BELOW 40 DEG F, CLOSE THE COOLING VALVE, OPEN THE PREHEATING VALVE AND SEND AN ALARM TO THE OPERATOR WORKSTATION. IF THE FREEZESTAT SENSES A TEMPERATURE BELOW 35 DEG F, SHUT DOWN THE UNIT. THE FREEZESTAT WILL REQUIRE MANUAL RESET AT THE

DEVICE.

SEND ALARM TO THE OPERATOR WORKSTATION UPON FAILURE OF THE VSMC FOR THE SUPPLY FAN. THE SUPPLY FAN SHALL BE STARTED/STOPPED MANUALLY AT THE DIGITAL CONTROL PANEL OR THE STARTER BY-PASS. THE FAN

SHALL OPERATE AT CONSANT SPEED.

SEND ALARM TO THE OPERATOR WORKSTATION WHEN EITHER THE MERV 7 OR MERV 14 PREFILTER DIFFERENTIAL PRESSURE SENSOR READS A HIGHER DIFFERENTIAL PRESSURE THAN THE CHANGEOVER DIFFERENTIAL PRESSURE

DETERMINED BY THE FILTER MANUFACTURER.

IF COOLING MODE IS NOT ENABLED, SEND ALARM TO THE OPERATOR WORKSTATION IF THE SUPPLY AIR HUMIDITY IS

ABOVE 90% AND CLOSE THE HUMIDIFIER ISOLATION VALVE.

WHEN PRODUCTS OF COMBUSTION ARE SENSED BY THE SUPPLY AIR SMOKE DETECTOR, CLOSE THE SMOKE DAMPER, DE-ENERGIZE THE SUPPLY FAN AND SHUT DOWN THE AIR HANDLING UNIT. SEND AN ALARM TO THE

OPERATOR WORKSTATION.

CONTROLS GENERAL NOTES

1. POINTS SHOWN ARE INTENDED AS AN AID TO THE CONTRACTOR INDICATING THE MINIMUM POINTS REQUIRED FOR CONTROL AND MONITORING. ALL INPUT AND OUTPUT POINTS, AND THEIR REQUIRED INTERFACE AND ACCESSORY HARDWARE, SHALL BE PROVIDED FOR A COMPLETE AND FUNCTION CONTROL SYSTEM. IF ADDITIONAL POINTS ARE REQUIRED TO ACCOMPLISH THE SEQUENCES OF CONTROL SPECIFIED, THESE POINTS, ALONG WITH ADDITIONAL DIRECT DIGITAL CONTROL PANEL(S) (IF REQUIRED), SHALL ALSO BE PROVIDED.

2. POWER SOURCE FOR ALL CONTROLS ASSOCIATED WITH CRITICAL SPACES SHALL BE THE "CRITICAL" BRANCH OF THE EMERGENCY POWER SYSTEM.

3. DIVISION 26 SCOPE OF WORK INCLUDES A POWER SOURCE TO THE MOTOR STARTERS. ALL HVAC POWER SOURCES REQUIRED BEYOND THESE STARTERS OR BEYOND SOURCES EXPLICITLY SHOWN ON THE DIVISION 26 DRAWINGS, SHALL BE PROVIDED UNDER THE TEMPERATURE CONTROLS

WORK.

4. ALL SETPOINTS SHALL HAVE AN ADJUSTABLE TOLERANCE OF ± .5°F TO PREVENT HUNTING.

VSMC

See Location on Floor Plans

H

L

AI - Supply Air Static Pressure

SA

H LH L

AI - MERV 14 Prefilter Differential Pressure

AI - Preheat Coil Leaving Air Temp

BO - Preheating ON/OFF Control Valve

MPR

MPS

STM

IFB

OA

SF

AO - Cooling Valve

CHS

CHR

CHW

BO - Supply Fan Start/Stop

BI - Supply Fan Status

AO - Supply Fan VSMC Speed

BI - Supply Fan VSMC Fault

H L

AI - MERV 7 Prefilter Differential Pressure

BO - Outside Air Damper

BI - Freezestat

30 PSIG STM

ZC

PDS PDS

TT TSL

NC

ZC ZC

AI - Cooling Coil Leaving Air Temperature

TT

IT

TT

HPS

SPS

AO - IFB Damper ZC

AI - Mixed Air Temperature

TT

AI - Supply Airflow

RAREA

BO - Relief Air Damper

ZC

NC

MT

RF

VSMC

BO - Return Fan Start/Stop

AO - Return Fan VSMC Speed

BI - Return Fan VSMC Fault

IT

BO - Mixed Air Damper

ZC NO

SD

AI - Return Air Humidity

TT

BI - Return Fan Status

AI - Return Air Temp

TT

AI - Cooling Coil Leaving

Water Temperature

FT

AI - Cooling Coil Chilled

Water Flow

STM

AO - Humidifier Control Valve

BO - Humidifier Isolation Valve

ZC

ZC

MT

BI - High Static Shutdown

AI - Supply Air Temp

BI - Supply Air Smoke Detector

AI - Supply Air Humidity

PDS

Indoor Outdoor

AI - Building Differential Pressure

AI - Outside Air Flow

FT

SPS

AI - Return Plenum Static Pressure Sensor

AI - Outside Air Temp

TTMT

AI - Outside Air Humidity

AIR HANDLING UNIT SEQUENCE OF OPERATION: 22-AHU-3

GENERAL

THE AIR HANDLING UNIT SHALL BE CONTROLLED WITH DIRECT DIGITAL CONTROL ACCORDING TO THE FOLLOWING

SEQUENCES.

AIR HANDLING UNIT SHALL RUN ON AN OCCUPIED/UNOCCUPIED SCHEDULE. COORDINATE SCHEDULE WITH COR. THE

OUTSIDE AIR AND RELIEF AIR DAMPERS SHALL BE CLOSED DURING UNOCCUPIED MODE.

H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR MAINTENANCE. WHEN THE UNIT IS "OFF", THE OUTSIDE AIR DAMPER AND RELIEF AIR DAMPER SHALL BE FULLY CLOSED. WHEN THE UNIT IS "ON" THE OUTSIDE AIR DAMPER AND RELIEF AIR DAMPER SHALL BE CONTROLLED TO

THE SEQUENCE BELOW.

ALL SETPOINTS SPECIFIED IN THIS SEQUENCE SHALL BE ADJUSTABLE.

FAN OPERATION

THE SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) SHALL CONTROL THE SUPPLY FAN SPEED TO MAINTAIN 1.2" (ADJUSTABLE) OF STATIC PRESSURE AT THE SUPPLY AIR STATIC PRESSURE SENSOR.

ENABLE STATIC PRESSURE RESET LOGIC 5 MINUTES AFTER THE SUPPLY FAN IS ON. REDUCE THE STATIC PRESSURE SETPOINT BY 0.04” EVERY 2 MINUTES. AS THE STATIC PRESSURE SETPOINT DROPS, THE VAV BOXES DOWNSTREAM WILL OPEN FURTHER. ONCE 1 VAV BOX OPENS MORE THAN 95%, STOP SEQUENCE. WHEN TWO OR MORE VAV BOXES OPEN TO 95% OR MORE THEN INCREASE THE STATIC PRESSURE SETPOINT BY 0.06” EVERY 10 MINUTES UNTIL ALL VAV BOXES ARE LESS THAN 85% OPEN. BEGIN REDUCING THE STATIC PRESSURE SETPOINT BY 0.04” EVERY 5

MINUTES TO RESTART THE CONTROL LOOP.

THE HIGH STATIC SHUTDOWN SENSOR SHALL PREVENT THE SUPPLY FAN FROM DEVELOPING OVER 3" OF STATIC PRESSURE. IF STATIC PRESSURE EXCEEDS 3", THE SUPPLY FAN SHALL STOP AND THE UNIT SHALL BE SHUT DOWN.

THE HIGH STATIC SHUTDOWN SENSOR WILL REQUIRE MANUAL RESET AT THE DEVICE.

THE RETURN FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) SHALL CONTROL THE FAN SPEED TO MAINTAIN A

CONSTANT RETURN PLENUM STATIC PRESSURE OF 0.01".

TEMPERATURE CONTROL

THE AIR HANDLING UNIT SHALL ENTER "COOLING MODE" WHENEVER THE MIXED AIR TEMPERATURE IS ABOVE 50 DEG

F AND "HEATING MODE" WHENEVER THE MIXED AIR TEMPERATURE IS BELOW 50 DEG F.

IN COOLING MODE, MODULATE THE COOLING VALVE TO MAINTAIN THE LEAVING AIR TEMPERATURE SETPOINT, 55

DEG F. THE PREHEATING VALVE AND HUMIDIFIER ISOLATION VALVE SHALL BE CLOSED.

IN HEATING MODE, THE PREHEATING ON/OFF CONTROL VALVE SHALL OPEN. THE IFB DAMPER SHALL BE OPEN TO THE BYPASS AND SHALL MODULATE CLOSED TO MAINTAIN THE LEAVING AIR TEMPERATURE SETPOINT, 55 DEG F.

THE COOLING VALVE SHALL BE CLOSED AND THE HUMIDIFIER ISOLATION VALVE SHALL BE OPEN. IF LEAVING AIR TEMPERATURE SENSOR INDICATES 5 DEG F ABOVE THE SETPOINT THEN CLOSE PREHEAT CONTROL VALVE UNTIL

SENSOR READS 1 DEG F BELOW SETPOINT.

DAMPER OPERATION

THE OUTDOOR AIR DAMPER SHALL MODULATE TO MAINTAIN AN OUTDOOR AIRFLOW THAT IS EQUAL TO THE MINIMUM

OUTDOOR AIRFLOW SETPOINT IN THE AIR HANDLING UNIT SCHEDULE ON SHEET M601.

THE RELIEF AIR DAMPER SHALL MODULATE TO MAINTAIN A BUILDING DIFFERENTIAL PRESSURE SETPOINT OF 0.02".

ECONOMIZER OPERATION

THE AIR HANDLING UNIT SHALL ENTER "ECONOMIZER MODE" WHENEVER THE OUTDOOR AIR ENTHALPY IS BELOW

THE RETURN AIR ENTHALPY AND THE OUTDOOR AIR TEMPERATURE IS BELOW 75 DEG F.

IN ECONOMIZER MODE, MODULATE THE OUTSIDE AND MIXED AIR DAMPERS TO MAINTAIN THE ECONOMIZER MIXED AIR TEMPERATURE SETPOINT, 50 DEG F. THE OUTSIDE AIR DAMPER SHALL NOT MODULATE BELOW MINIMUM

POSITION.

HUMIDITY CONTROL

THE AIR HANDLING UNIT SHALL ENTER "HUMIDIFICATION MODE" WHENEVER THE AIR HANDLING UNIT IS IN HEATING MODE AND THE RETURN AIR HUMIDITY IS BELOW 30%. THE HUMIDIFIER ISOLATION VALVE SHALL OPEN FULLY.

IN HUMIDIFICATION MODE, MODULATE THE HUMIDIFIER CONTROL VALVE OPEN UNTIL THE RETURN AIR HUMIDITY IS

ABOVE 35%, THEN CLOSE THE HUMIDIFIER CONTROL VALVE.

ALARMS

WHEN THE PREHEAT COIL LEAVING AIR TEMPERATURE IS BELOW 40 DEG F, CLOSE THE OUTDOOR AIR DAMPER, CLOSE THE COOLING VALVE, OPEN THE PREHEATING VALVE AND SEND AN ALARM TO THE OPERATOR WORKSTATION. IF THE FREEZESTAT SENSES A TEMPERATURE BELOW 35 DEG F, SHUT DOWN THE UNIT. THE

FREEZESTAT WILL REQUIRE MANUAL RESET AT THE DEVICE.

SEND ALARM TO THE OPERATOR WORKSTATION UPON FAILURE OF THE VSMC FOR THE SUPPLY OR RETURN FAN.

THE SUPPLY OR RETURN FAN SHALL BE STARTED/STOPPED MANUALLY AT THE DIGITAL CONTROL PANEL OR THE

STARTER BY-PASS. THE FAN SHALL OPERATE AT CONSANT SPEED.

SEND ALARM TO THE OPERATOR WORKSTATION WHEN EITHER THE MERV 7 OR MERV 14 PREFILTER DIFFERENTIAL PRESSURE SENSOR READS A HIGHER DIFFERENTIAL PRESSURE THAN THE CHANGEOVER DIFFERENTIAL PRESSURE

DETERMINED BY THE FILTER MANUFACTURER.

IF COOLING MODE IS NOT ENABLED, SEND ALARM TO THE OPERATOR WORKSTATION IF THE SUPPLY AIR HUMIDITY IS

ABOVE 90% AND CLOSE THE HUMIDIFIER ISOLATION VALVE.

WHEN PRODUCTS OF COMBUSTION ARE SENSED BY THE SUPPLY AIR SMOKE DETECTOR, DE-ENERGIZE THE SUPPLY AND RETURN FAN AND SHUT DOWN THE AIR HANDLING UNIT. SEND AN ALARM TO THE OPERATOR WORKSTATION.

EXISTING LAB EXHAUST FAN CONTROL

GENERAL

THE EXISTING LAB EXHAUST FAN AND ITS CONTROLS AND SEQUENCES OF OPERATION SHALL

REMAIN. INTEGRATE NEW EXHAUST AIR STATIC PRESSURE SENSOR INTO THE EXISTING CONTROL

SYSTEM. EXHAUST AIR STATIC PRESSURE SETPOINT SHALL BE DETERMINED BY THE TEST AND

BALANCE CONTRACTOR.

EXISTING LAB EXHAUST FAN

See Location on Floor Plans

SPS

AI - Exhaust Air Static Pressure

AI - Exhaust Air Humidity

MT

1-AHU-3 Hardware Points Software Points

Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On

Graphic

MERV 7 Prefilter Differential Pressure x x x

MERV 14 Prefilter Differential Pressure x x x

Outside Air Humidity x x x

Outside Air Temperature x x x

Outside Airflow x x x

Return Air Temperature x x x

Outside Airflow x x x

Mixed Air Temperature x x x

Preheat Coil Leaving Air Temp x x x

Cooling Coil Leaving Water Temp x x x

Cooling Coil Chilled Water Flow x x x

Cooling Coil Leaving Air Temp x x x

Supply Air Humidity x x x

Supply Air Temp x x x

Supply Airflow x x x

Building Differential Pressure x x x

Return Plenum Static Pressure Sensor x x x

Cooling Valve x x x

IFB Damper x x x

Humidifier Control Valve x x x

Supply Fan VSMC Speed x x x

Return Fan VSMC Speed x x x

Outside Air Damper x x x

Mixed Air Damper x x x

Relief Air Damper x x x

Freezestat x x x x

High Static Shutdown x x x x

Supply Air Smoke Detector x x x x

Supply Fan Status x x x

Supply Fan VSMC Fault x x x

Return Fan Status x x x

Return Fan VSMC Fault x x x

Supply Fan Start/Stop x x x

Return Fan Start/Stop x x x

Humidifier Isolation Valve x x x

Preheating ON/OFF Control Valve x x x

Supply Staitc Pressure Setpoint x x x

Leaving Air Temperature Setpoint x x x

Mixed Air Temperature Setpoint x x x

Return Air Humidity Setpoint x x x

Minimum Outdoor Airflow Setpoint x x x

Building Differential Pressure Setpoint x x x

Schedule x

High Return Air Humidity x

High Supply Air Static Pressure x

MERV 7 Prefilter Change Required x x

MERV 14 Prefilter Change Required x x

Supply Fan Failure x

Supply Fan in Hand x

Return Fan Failure x

Return Fan in Hand x

22-AHU-2 Hardware Points Software Points

Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On

Graphic

MERV 7 Prefilter Differential Pressure x x x

MERV 14 Prefilter Differential Pressure x x x

Preheat Coil Leaving Air Temp x x x

Cooling Coil Leaving Water Temperature x x x

Cooling Coil Leaving Air Temp x x x

Supply Air Humidity x x x

Exhaust Air Humidity x x x

Supply Air Static Pressure x x x

Supply Air Temp x x x

Supply Airflow (Qty 4) x x x

Outside Air Temperature x x x

Cooling Valve x x x

Humidifier Control Valve x x x

IFB Damper x x x

Supply Fan VSMC Speed (Qty 4) x x x

Freezestat x x x x

High Static Shutdown x x x x

Low Static Shutdown x x x x

Supply Fan Status (Qty 4) x x x

Supply Fan VSMC Fault (Qty 4) x x x

Supply Air Smoke Detector x x x

Supply Air Smoke Damper x x x

Outside Air Damper x x x

Preheating ON/OFF Control Valve x x x

Humidifier Isolation Valve x x x

Supply Fan Start/Stop (Qty 4) x x x

Space Humidity Setpoint x x

Supply Air Static Pressure Setpoint x x

Cooling Coil Leaving Air Temperature Setpoint x x

Mixed Air Temperature Setpoint x x

Emergency Shutdown x x

High Supply Air Humidity x

High Supply Air Static Pressure x

MERV 7 Supply Prefilter Change Required x x

MERV 14 Supply Prefilter Change Required x x

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/1

/2

:2

:5

P

M

M701

MECHANICAL CONTROLS

09/02/2022 KF JG

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

22-AHU-2 CONTROLS DIAGRAM

22-AHU-3 CONTROLS DIAGRAM

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

1 ADDENDUM 01 02/14/2023

09/02/2022

4 FAN ARRAY, PROVIDE VFD FOR

EACH FAN.

Sheets
M701 - MECHANICAL CONTROLS

File details come from the government source that posted it. Updated .