This notice of contract award and related federal contract opportunity document provide details of a construction contract awarded by the Department of Veterans Affairs to Daniels Building Co., Inc. for project 506-21-102 to modernize Building 22 at the Lieutenant Colonel Charles S. Kettles VA Medical Center in Ann Arbor, Michigan. Daniels Building Co., Inc. was awarded the firm fixed price contract in the amount of $8,500,000 to provide all necessary labor, tools, materials, equipment and supervision specified in the drawings and specifications to complete the modernization project. The contractor must furnish payment and performance bonds within five calendar days of receipt of the award. The 540-day period of performance will commence upon issuance of the notice to proceed. The pre-solicitation announcement describes the planned invitation for bids for the same modernization project, with a projected cost between $5-10 million. The eventual contract is designated as a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses.

View the file

Other files

File Type Posted
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Specifications - 506-21-102.pdf PDF
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 28, 2023

Daniels Building Co, Inc.

33900 W. Eight Mile Rd., Ste #161 Farmington Hills, MI 48336

Department of Veterans Affairs Network Contracting Office (NCO 10)

5500 Armstrong Rd Battle Creek, MI 49037

Subject: Notice of Award, Project 506-21-102 - Modernize Building 22, Contract# 36C25023C0093

Mr. Daniels, Acceptance is hereby made of your offer for the Bid Item No. 1, Base Bid dated March 15, 2023, submitted in response to Solicitation No. 36C25023B0005 (inclusive of Amendments 0001, 0002, 0003 and 0004) for Project No. 506-21-102 - Modernize Building 22 at the Lieutenant Colonel Charles S.

Kettles VA Medical Center, Ann Arbor, MI. Award is for consideration of Eight Million Five Hundred Thousand Dollars and No Cents ($8,500,000.00) in strict accordance with the contract terms, project specifications, and drawings. A fully executed copy of the contract is attached. The contract allows Five Hundred Forty (540) calendar days for completion of the project after issuance of the Notice to Proceed.

Contract number 36C25023C0093 and Purchase Order number 506C30215 have been assigned to this contract. Please reference both numbers on all correspondence, submittals, and invoices.

You are required to furnish Payment and Performance Bonds (Standard Forms 25 and 25a) in a penal sum equivalent to 100% of the contract award amount. The bonds must be executed and returned within five (5) calendar days after receipt of this award. Only the original bonds are required to be submitted – no copies are required. The bonding company used must be listed in the Department of Treasury Surety Circular TD570. In addition, a current insurance certificate showing evidence of workers compensation, general liability, and automotive liability must be furnished prior to start of work in accordance with FAR Part 52.228-5 and VA Supplemental Insurance Requirements.

Upon receipt and approval of the bonds, a preconstruction meeting will be scheduled with your company. A Notice to Proceed will be issued at this time which is necessary before any work begins or materials are ordered. Questions may be directed to Terrance Deininger at terrance.deininger@va.gov.

Sincerely, SCOTT D. BRENNAN

Contracting Officer

Enclosures:

Contract 36C25023C0093 (Copy)

VHABACBrennS Text Box Jun 29, 2023

2023-06-29T10:06:54-0400
Scott D. Brennan 250586

File details come from the government source that posted it. Updated .