Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf

PDF 328 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document contains a pre-solicitation notice and related federal contract opportunity for modernization work at the Veterans Affairs Medical Center in Ann Arbor, Michigan. The pre-solicitation announces the Department of Veterans Affairs' intent to issue an invitation for bids around November 30th, 2022 for project 506-20-102 to modernize Building 22 at the LTC Charles S. Kettles VAMC located in Ann Arbor. The work includes furnishing all labor, materials, equipment, tools and supervision as specified in the drawings and specifications to complete the project. The magnitude of cost is estimated between $5 million to $10 million. The acquisition is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. The eventual contract will be a firm fixed price awarded within 120 days of bid opening. All questions must be submitted in writing to the specified contracting officer by the given date.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADR-2-1

SST-2

SST-1

ADR-2-2 ADR-2-3

ADR-1-1 ADR-1-2

1st Floor

Ground Floor

Penthouse

St

St

St

EV-L1-07

DUCT PROBE

EV-L1-04

DUCT PROBE

EV-L1-03

DUCT PROBE

St St

EV-01-03

DUCT PROBE

EV-L1-08

DUCT PROBE

St

EV-L1-15

DUCT PROBE

St St

EV-L1-21

DUCT PROBE

EV-L1-10

DUCT PROBE

St St

EV-L1-09

DUCT PROBE

EV-L1-13

DUCT PROBE

AIRCUITY CONTROL

GENERAL

THE EXISTING AIRCUITY SYSTEM SHALL BE INTEGRATED INTO THE NEW LAB CONTROLLERS. THE SENSOR SUITE AND ITS ASSOCIATED SETPOINTS SHALL REMAIN. DUCT

PROBES SHALL BE INSTALLED IN THE EXHAUST AIRSTREAM IN-LINE OF THE VENTURI VALVE TAGGED BELOW AND CONNECTED TO THE AIR DATA ROUTER TAGGED BELOW.

INTEGRATE THE AIRCUITY OUTPUT SIGNAL GENERATED FROM THE AIR SAMPLES INTO THE NEW LAB CONTROLLERS.

EXHAUST FAN SEQUENCE OF OPERATION: 22-EF-5

GENERAL

THE EXHAUST FAN SHALL FUNCTION CONTINUOUSLY. THE FANS SHALL BE CONTROLLED WITH DIRECT DIGITAL

CONTROL ACCORDING TO THE FOLLOWING SEQUENCES.

H-O-A SWITCH SHALL BE KEPT IN THE "AUTO" POSITION. "HAND" AND "OFF" POSITIONS SHALL BE USED ONLY FOR

MAINTENANCE.

ALL SETPOINTS SPECIFIED IN THIS SEQUENCE SHALL BE ADJUSTABLE.

FAN OPERATION

THE EXHAUST FAN BYPASS DAMPER SHALL MODULATE OPEN TO MAINTAIN THE EXHAUST AIR STATIC PRESSURE

SETPOINT DETERMINED BY THE TEST AND BALANCE CONTRACTOR.

ALARMS

SEND ALARM TO THE OPERATOR WORKSTATION UPON FAILURE OF THE EXHAUST FAN. THE EXHAUST FAN SHALL BE

STARTED/STOPPED MANUALLY AT THE DIGITAL CONTROL PANEL.

SEND ALARM TO THE OPERATOR WORKSTATION AND SHUT DOWN THE EXHAUST FANS IF THE EXHAUST AIR STATIC

PRESSURE FALLS BELOW -3".

ITBI - Exhaust Fan 2 Status

To Segregated Compounding Pharmacy

Starter

ZC

NC

AO -Exhaust Fan Bypass Damper

SPS

See Location on Floor Plans

AI - Exhaust Air Static Pressure

Gravity Backdraft Damper

BO - Exhaust Fan Start/Stop

BI - Exhaust Fan Fault

22-EF-5 Hardware Points Software Points

Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On

Graphic

Exhaust Air Static Pressure x x x x

Exhaust Fan Bypass Damper x x x

Exhaust Fan Status x x x

Exhaust Fan Fault x x x

Exhaust Fan Start/Stop x x x

Exhaust Air Static Pressure Setpoint x x x

AIR TERMINAL UNITS Hardware Points Software Points

Point Name AI AO BI BO AV BV Loop Sched Trend Alarm Show On

Graphic

Airflow x x x x

Zone Damper x x x

Discharge Air Temperature x x x

Control Valve x x x

Room Temperature x x x

Room Humidity x x x

Airflow Setpoint x x x

ROOM THERMOSTAT/SENSOR

WALL MOUNTED

48" [1200mm] AFF.

NO SUPPLEMENTAL HEATING

A

IR

F

LO

W

(C F

M

ROOM TEMPERATURE (°F)

HEATING

MINIMUM

VAV BOX CONTROL SEQUENCE

SP

TU

RHC

HWS

HWR

V-1

REHEAT

COIL

AIR

TERMINAL

UNIT

AIR

FLOW

TE

ATU

CONTROLLER

PC

TE

ROOM TEMPERATURE (°F)

SP

NO DEADBAND

VAV BOX CONTROL SEQUENCE

W/DEADBAND

100%

REHEAT FLO

W VAV A

IR

F

LO

W

A. UPON FALL IN SPACE TEMPERATURE THE VAV

DAMPER WILL MODULATE TO MINIMUM POSITION.

B. UPON FURTHER DROP IN SPACE TEMPERATURE

VALVE V-1 WILL MODULATE TO MAINTAIN SET POINT

± .5°F. THE ADJUSTABLE TOLERANCE OF ± .5°F HAS

BEEN SELECTED TO PREVENT VALVE HUNTING

C. THE REVERSE SHALL OCCUR ON THE RISE IN SPACE

TEMPERATURE.

A. SET POINTS SHALL BE SET AS FOLLOWS:

COOLING 75°F (ADJ)

HEATING 70°F (ADJ)

DEADBAND OF 5°F BETWEEN HEATING AND COOLING

SET POINTS WILL BE MAINTAINED.

B. UPON FALL IN SPACE TEMPERATURE THE VAV

DAMPER WILL MODULATE TO MINIMUM POSITION.

C. UPON FURTHER DROP IN SPACE TEMPERATURE

VALVE V-1 WILL MODULATE TO MAINTAIN SET POINT

± .5°F. THE ADJUSTABLE TOLERANCE OF ± .5°F HAS

BEEN SELECTED TO PREVENT VALVE HUNTING.

D. THE REVERSE SHALL OCCUR ON THE RISE IN SPACE

TEMPERATURE.

FE

A

IR

F

LO

W

(C F

M

100%

HEATING

MINIMUM

R

EH

EAT FLO

W

VA

V

AI

R

F

LO

W

NEW EMCS

SPACE

T

HVAC

MS

SPLIT SYSTEM SECONDARY

DRAIN PAN (TYP)

RETURN

DAMPER

M

VAV-124

M

CONTROLS SEQUENCE:

CONTROLS FOR UNITARY EQUIPMENT SERVING ROOM ARE STAND ALONE

TYPE. CONTRACTOR SHALL PROVIDE PROGRAMMABLE THERMOSTAT (WALL

MOUNTED) TO CONTROL TO THE SETPOINTS AND SCHEDULES LISTED BELOW.

THE CONTROL DIAGRAM AND POINTS LISTED ON THIS SHEET SHOWS SENSORS

USED FOR CENTRAL MONITORING AND ALARMS. SENSORS AND POINTS ARE IN

ADDITION TO CONTROLS REQUIRED FOR OPERATION OF THE UNITARY

CONDITIONING EQUIPMENT.

EQUIPMENT SETPOINTS:

COOLING (ACCU-1): 73 DEG F

ANALOG ALARM SETPOINT:

TEMPERATURE LOW: 62 DEG F

TEMPERATUER HIGH: 83 DEG F

OPEN VAV AND MOTORIZED RETURN DAMPER.

POINT TYPE ALARMS

POINT DESCRIPTION

G R

A P

H

IC

H A

R D

W A

R E

IN

P U

T

H A

R D

W A

R E

O U

T P

U T

S O

F T

W A

R E

P O

IN

T

D E

F A

U L

T V

A L

U E

H

IG

H A

N A

L O

G L

IM

IT

L O

W A

N A

L O

G L

IM

IT

B

IN

A R

Y

L A

T C

H D

IA

G

N O

S T

IC

S E

N S

O R

F A

IL

C O

M M

U N

IC

A

T

IO

N F

A

IL

D

IA

G N

O S

T

IC

S

NOTES

EMCS UNITARY AIR CONDITIONING UNITS - ALARM

MONITORING

ZONE SENSOR

ZONE TEMPERATURE X AI X X X SENSOR FAILURE 1, 2

DRAIN PAN MOISTURE X BI X X X SENSOR FAILURE 1

TERMINAL UNIT X AO X X 2

MOTORIZED RETURN DAMPER X BO X X

BAS COMMUNICATION STATE X X X

KEY:

A = ANALOG, B = BINARY, I = INPUT, O = OUTPUT

NOTES:

1. SENSOR FOR MONITORING AND ALARMS ONLY.

2. SENSOR TO ACTIVATE RETURN DAMPER AND TERMINAL UNIT. TERMINAL UNIT SHALL OPERATE IN CONSTANT VOLUME MODE BASED ON AIR TERMINAL

UNIT SEQUENCE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/1

/2

:2

:5

P

M

M703

MECHANICAL CONTROLS

09/02/2022 KF JV

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

NTS

SIMPLIFIED CONTROL DIAGRAM - OIT 161, TR G13

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

1 ADDENDUM 01 02/14/2023

09/02/2022

NTS

POINTS LIST - OIT 161, TR G13

Sheets
M703 - MECHANICAL CONTROLS

File details come from the government source that posted it. Updated .