Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf

PDF 809 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation notice and related documents outline requirements for a construction project to modernize Building 22 at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The project includes mechanical, plumbing, and architectural work, with an estimated value between $5-10 million. The solicitation is scheduled for release on November 30th, 2022 via SAM.gov as an 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses. The contract type will be firm-fixed-price, with a period of performance ending 120 days from bid opening. The pre-solicitation provides prospective offerors with advance notice to register in SAM and Vendor Information Pages in preparation for responding to the forthcoming solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL PENTHOUSE

R01

(E) 3" VTR

(E) AIR COMPRESSOR

2 3 4 5

E

D

C

B

(E) 4" RD

(E) 4" RD

(E) 3" VTR

(E) 3" VTR

(E) 4" VTR

(E) 3/4" LA DN

1 1/2" LVC DN

VP-1

2" DCW DN2" DCW DN

1 1/2" LVC

2" LVC EXHAUST

THRU ROOF

GWH-1

DHWRP-1

ET-1

(E) 3" VTR

(E) LABORATORY AIR

COMPRESSOR

3/4" G DN

3" FD-E

1 1/2" DHW DN

3/4" DHWR DN

1 1/2" DHW

3/4" DHWR

1 1/2" DCW

3/4" DCW

P-802

3" SAN DN

3" CO

(E) 3" V UP

1 1/2" V DN

3" SAN DN3" CO

3" FD-E

3" FD-E

3" FD-E

3/4" DCW

3" V

GPR-17

G E N E R A L N O T E S:

A. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE ATTENTION OF THE COR IN WRITING ANY

DISCREPANCIES THAT MAY IMPACT THE PROGRESS OF WORK.

B. REFER TO SHEET P100 FOR LEGEND AND ABBREVIATIONS.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/2

/2

:4

:1

A M

PL103

PENTHOUSE PLUMBING NEW

WORK PLAN

09/02/2022 PP GP

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

N

1/8" = 1'-0"

PENTHOUSE PLUMBING NEW WORK PLAN

D R A W I N G N O T E S :

1 CORE DRILL THROUGH FLOOR SLAB FOR INSTALLATION OF PIPING THROUGH FLOOR.

2 INSTALL NEW WATER METER AND REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER WITH STRAINER. WATER METER TO HAVE REMOTE READOUT CONNECTED TO EXISTING BUILDING MANAGEMENT SYSTEM AND ADDED TO VA METERING PAGE. BACKFLOW PREVENTER DISCHARGE TO CONNECT INDIRECTLY TO NEAREST FLOOR DRAIN.

3 INSTALL NEW LABORATORY VACUUM PUMP. PROVIDE CONCRETE EQUIPMENT PAD.

4 CONNECT VENT PIPING TO EXISTING AT POINT SHOWN.

5 INSTALL 3/4" REDUCED PRESSURE BACKFLOW PREVENTER FOR SERVICE TO HVAC SYSTEM PIPING. REFER TO HVAC

DRAWINGS FOR CONTINUATION OF WATER PIPING.

6 REFER TO NATURAL GAS WATER HEATER DETAIL FOR PIPING TO GWH-1, ET-1, AND DHWRP-1.

7 ROUTE 4" EXHAUST VENT AND INTAKE DUCT THROUGH ROOF TO EXTERIOR. EXHAUST AND INTAKE TERMINALS TO BE

MINIMUM 48" APART. TERMINALS TO BE POINTED DOWNWARD MINIMUM 18" ABOVE ROOF.

8 INSTALL NEW CONCRETE HOUSEKEEPING PAD FOR NEW EQUIPMENT. REFER TO CONCRETE EQUIPMENT BASE DETAIL

ON SHEET S101.

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

2 ADDENDUM 02 03/02/2023

09/02/2022

ALL PIPING LABELED AND REFERENCES TO

LABORATORY GAS (LG) HAVE BEEN CHANGED TO

NATURAL GAS (G)

Sheets
PL103 - PENTHOUSE PLUMBING NEW WORK PLAN