This amendment to a solicitation provides additional details for a project to modernize Building 22 at the Veterans Affairs Medical Center in Ann Arbor, Michigan. The amendment extends the response deadline to March 7, 2023 at 1:00 PM EDT, provides answers to request for information questions, and includes revised bid schedules and drawings. The related opportunity posting is for a pre-solicitation notice for the project, which is estimated to cost between $5-10 million. Responses will be due on or around November 30, 2022. The awarded firm fixed price contract is expected within 120 days of bid opening. This is a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. The work must be completed according to specifications and drawings during normal daytime business hours, excluding federal holidays.
View the file
Other files for this federal contract opportunity
Show all 49
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25023B0005 0001 – Modernize Bldg. 22 – 506-21-102 – VAMC Ann Arbor, MI
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
02-24-2023
506-23-1-586-0009
506-21-102
Department of Veterans Affairs Network Contracting Office (NCO) 10
5500 Armstrong Rd.
Battle Creek MI 49037
Same as Block 6
To all Offerors/Bidders
36C25023B0005
02-24-2023
X
X X
Date and Hour of Receipt of Offers is March 7, 2023 at 1:00 PM EDT
The purpose of this Amendment is to:
1. Extend the Date and Hour of Receipt of Offers to Tuesday, March 7, 2023 at 1:00 PM
2. Provide Answer to Additional RFI Questions
3. Provide a Revised Bid Schedule
4. Provide Additional Drawings
End of Amendment 0003
SCOTT D. BRENNAN
Contract Specialist
SF 30 CONTINUATION PAGE 36C25023B0005
AMENDMENT 0003
THE FOLLOWING ANSWERS TO REQUESTS FOR INFORMATION QUESTIONS ARE
HEREBY PROVIDED TO CLARIFY, UPDATE, REVISE, OR CORRECT CONTRACT
SPECIFICATIONS AND/OR DRAWINGS.
QUESTIONS AND ANSWERS
1. RFI #1 Question: Regarding the Bid Schedule wording & Specification wording, please clarify if bidders are to enter the “Deduct” amount on the bid schedule or a “New Total” of the Base minus the deduct?
Answer: Bidders are to enter the “New Total”. An updated Bid Schedule is attached to this Amendment for submission of Bids.
2. RFI #2 Question: In Amendment 0002, the attached Addendum 1 document lists changes to the specs and drawings, and references documents for Building 31, Building 1E and Building 15, but the reference drawings were not included in Amendment.
Answer: The Drawings are attached to this Amendment.
A.1 ADDITIONAL ATTACHMENTS
See attached document: BID SCHEDULE 506-21-102 - Revised.
See attached document: 01E-A.100 - BASEMENT FLOOR PLAN.
See attached document: 15-A.101 - FIRST FLOOR PLAN.
See attached document: 31-A.100 - BASEMENT FLOOR PLAN.
See attached document: 31-A.101 - FIRST FLOOR PLAN.
See attached document: 31-A.102 - SECOND FLOOR PLAN.
See attached document: 31-A.103 - PENTHOUSE FLOOR PLAN.
A.1 ADDITIONAL ATTACHMENTS