Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf

PDF 997 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102 Federal contract opportunity
Solicitation number
36C25023B0005
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document provides details for a federal construction contract opportunity to modernize Building 22 at the LTC Charles S. Kettles Veterans Administration Medical Center in Ann Arbor, Michigan. The solicitation will be for construction services with a magnitude of cost estimated between $5 million and $10 million. The contract type will be firm fixed price with an anticipated award within 120 days of bid opening. The acquisition is reserved as a 100% set-aside for verified Service-Disabled Veteran Owned Small Businesses. Offerors must be registered in the System for Award Management and Vendor Information Pages databases. The Department of Veterans Affairs intends to issue the solicitation on November 30th, with the bid due date and other event details to be provided then. All questions must be submitted in writing to the specified contracting officer by the date indicated in the forthcoming solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Modernize Building 22 506-21-102, newest first.
File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LABORATORY

UNISEX TOILET

UNISEX TOILET

DATA/IT ROOM

COMMON EQUIPMENT

COMMON EQUIPMENT

PENTHOUSE STAIR

S2

ELEVATOR

Z2

PERCHLORIC ACID ROOM

LOBBY

C-101

STAIR-2

S1-2

ELECTRIC ROOM

USP-800

LABORATORY

COMMON EQUIPMENT

2 3 4 5

E

D

C

B

COMPUTER LAB

READING ROOM

SCINTILLATION COUNTER

AND FREEZER LAB

CORRIDOR

C-102

H.A.C.

109A

CORRIDOR

C-103

CELL/TISSUE CULTURE

ELECTRIC ROOM

1 1/2" G DN

3/4" LA DN

1" LVC DN

(E) 3/4" LA UP

1 1/2" LVC UP 2

1 1/4" G

3/4" LA

1" LVC

1" G

3/4" LA

1" LVC

1" G

3/4" LA

1" LVC

3/4" G

1/2" LA

1" LVC 3/4" LVC

1/2" LA

1/2" G

1 1/2" LVC

3/4" LA

3/4" G

3/4" LVC

1/2" LA

1/2" G

1/2" G

1/2" LA

3/4" LVC

H.A.C.

3/4" G UP 2

LABORATORY

LABORATORY

1" G

1" LVC

3/4" LA

3/4" G 3/4" G

1/2" LA

1" LVC

GPR-6

GPR-7 GPR-8

GPR-9

GPR-10

GPR-11

GPR-12

GPR-13 GPR-14

GPR-15 GPR-16

3/4" G

B

USP-800

LAB

G E N E R A L N O T E S:

A. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS AND BRING TO THE ATTENTION OF THE COR IN WRITING ANY

DISCREPANCIES THAT MAY IMPACT THE PROGRESS OF WORK.

B. REFER TO SHEET P100 FOR LEGEND AND ABBREVIATIONS.

C. REFER TO SPECIFICATION SECTIONS 226200 VACUUM SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES, 226300 GAS SYSTEMS FOR LABORATORY AND HEALTHCARE FACILITIES, AND 231123 FACILITY NATURAL GAS PIPING

FOR TESTING PROCEDURES.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

A u to d e s k D o c s /A n n A rb o r

V A

M o d e rn iz e B ld g

/F

F E

A n n A rb o r

M o d e rn iz e

B

M E

P rv t

/2

/2

:4

:2

A M

PL122

FIRST FLOOR PLUMBING NEW

WORK PLAN - GASES

09/02/2022 PP GP

MODERNIZE BUILDING 22 506-21-102

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

ANN ARBOR

VAMC

Approved: Veteran's Affairs Medical Center

N

1/8" = 1'-0"

FIRST FLOOR PLUMBING NEW WORK PLAN - GASES - PHASE 2

D R A W I N G N O T E S :

1 INSTALL 1/2" LA, 1/2" G, AND 3/4" LVC ROUGH-INS FOR FUTURE FUME HOOD.

2 CORE DRILL THROUGH FLOOR SLAB FOR INSTALLATION OF PIPING THROUGH FLOOR.

3 ROUTE 1/2" LA, 1/2" G, AND 3/4" LVC PIPING TO CEILING LAB GAS QUICK CONNECTS IN CEILING SERVICE PANEL. EACH CEILING SERVICE PANEL TO HAVE (4) LA, (4) G, AND (4) LVC CONNECTIONS. REFER TO SHEET AC142 FOR CEILING

SERVICE PANEL DETAIL.

4 ROUTE 1/2" LA, 1/2" G, AND 3/4" LVC PIPING DOWN IN WALL TO FUME HOOD.

5 CONNECT LABORATORY AIR PIPING TO EXISTING AT POINT SHOWN.

6 CONNECT LA, G, AND LVC PIPING TO EXISTING AT POINT SHOWN.

N

1/8" = 1'-0"

FIRST FLOOR PLUMBING NEW WORK PLAN - GASES - PHASE 1

No. Revisions: Date:

100% BID DOCUMENTS 09/02/2022

2 ADDENDUM 02 03/02/2023

09/02/2022

ALL PIPING LABELED AND REFERENCES TO

LABORATORY GAS (LG) HAVE BEEN CHANGED TO

NATURAL GAS (G)

Sheets
PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES

File details come from the government source that posted it. Updated .