S02 J-A - Siemens HVAC and BMS Components - 506-21-102.pdf

PDF 228 KB Posted

Attached to
Z1DA--Modernize Building 22 506-21-102
Solicitation number
36C25023B0005
Issued by

About this file

This document contains a single source justification and related federal contract opportunity announcement. The single source justification approves a sole source award to Siemens Industry Inc. for installation of HVAC controls and proprietary equipment as part of the Modernize Building 22 project at the LTC Charles S. Kettles VA Medical Center in Ann Arbor, Michigan. Siemens currently holds the maintenance contract for the existing HVAC and building management system, requiring use of Siemens equipment to ensure compatibility. The federal contract opportunity is a pre-solicitation notice for an invitation for bids to be issued on or around November 30th, 2022 for construction services on the same Modernize Building 22 project. The project magnitude is estimated between $5-10 million. The acquisition is reserved as a 100% set-aside for qualified Service-Disabled Veteran Owned Small Businesses. The response due date and other solicitation details will be provided in the forthcoming invitation for bids to be posted at SAM.gov.

View the file

Other files

File Type Posted
C08 NOTICE OF CONTRACT AWARD - CONTRACT 36C25023C0093.pdf PDF
Addendum 02 - List of Updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
Drawing 11.16_PL122 - FIRST FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.07_PD121 - GROUND FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Specification 117300 Ceiling Mounted Patient Lift.pdf PDF
Specification 096536 13 Static Dissipative Flooring.pdf PDF
Specification 000110 Table of Contents.pdf PDF
Wage Determination - MI20230100 - 2-3-23 - 506-21-102.pdf PDF
Drawing 11.19_PL602 - PLUMBING DIAGRAMS.pdf PDF
Drawing 11.17_PL501 - PLUMBING DETAILS.pdf PDF
Drawing 11.12_PL103 - PENTHOUSE PLUMBING NEW WORK PLAN.pdf PDF
Drawing 11.08_PD122 - FIRST FLOOR PLUMBING DEMOLITION PLAN - GASES.pdf PDF
Drawing 11.15_PL121 - GROUND FLOOR PLUMBING NEW WORK PLAN - GASES.pdf PDF
Drawing 11.00_P001 - PLUMBING LEGEND SHEET.pdf PDF
S06 36C25023B0005 0004 - 506-21-102.pdf PDF
S06 Drawing 01E-A.100 - BASEMENT FLOOR PLAN.pdf PDF
S06 Drawing 31-A.102 - SECOND FLOOR PLAN.pdf PDF
S06 Drawing 31-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 BID SCHEDULE 506-21-102 - Revised.docx DOCX document
S06 36C25023B0005 0003.pdf PDF
S06 Drawing 15-A.101 - FIRST FLOOR PLAN.pdf PDF
S06 Drwaing 31-A.103 - PENTHOUSE FLOOR PLAN.pdf PDF
S06 Drawing 31-A.100 - BASEMENT FLOOR PLAN.pdf PDF
Drawing - 14.16_E602 - PANELBOARD SCHEDULES.pdf PDF
Specifications - Complete Set Revised - 506-20-102.pdf PDF
List of updated Specifications and Drawings with explanation of revisions.pdf PDF
Drawing - 13.13_M504 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.09_PL100 - BASEMENT PLUMBING NEW WORK PLAN.pdf PDF
36C25023B0005 0002 - 506-21-102.pdf PDF
Drawing - 13.21_M703 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.19_M701 - MECHANICAL CONTROLS.pdf PDF
Drawing - 13.14_M505 - MECHANICAL DETAILS.pdf PDF
Drawing - 11.01_PD100 - BASEMENT PLUMBING DEMOLITION PLAN.pdf PDF
Drawing - 09.02_QL102 - FIRST FLOOR EQUIPMENT PLAN.pdf PDF
Drawing - 13.12_M503 - MECHANICAL DETAILS.pdf PDF
Drawing - 13.07_MP101 - BASEMENT AND GROUND FLOOR PIPING PLAN.pdf PDF
Drawing - 11.18_PL601 - PLUMBING SCHEDULES.pdf PDF
S06 36C25023B0005 0001 - 506-21-102.pdf PDF
S06 Pre-Bid Site Visit Agenda - 506-20-102.pdf PDF
S06 Pre Bid Site Survey Attendance list - 506-21-102.pdf PDF
S02 J-A - JCI Simplex-Fire Alarm System - 506-21-102.pdf PDF
S02 RFI Form - 506-21-102.doc DOC document
S02 Contractor EMR Certification Form - 506-21-102.docx DOCX document
S02 Wage Determination - MI20230100 - 1-6-23 - 506-21-102.pdf PDF
S02 Drawings - 506-21-102.pdf PDF
S02 Specifications - 506-21-102.pdf PDF
S02 Solicitation 36C25023B0005_1 - 506-21-102.pdf PDF
36C25023B0005.docx DOCX document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHAPG Part 813.106 Simplified Acquisition Procedures: Soliciting from a Single Source Attachment 1: Single Source Justification for SAP under the SAT

Last Updated: 02/01/22 Page 1 of 1

DEPARTMENT OF VETERANS AFFAIRS

Justification for Single Source Awards IAW FAR 13.106-1 For

Over Micro-Purchase Threshold but Not Exceeding the SAT ($250K)

Acquisition Plan Action ID: 36C250-22-AP-6808 2237: 506-23-1-586-0009

1. Contracting Activity: Department of Veterans Affairs, VISN 10, LTC Charles S. Kettles VA Medical Center.

2. Brief Description of Supplies/Services required and the intended use/Estimated Amount:

Work includes general construction, demolition, and new construction for the Modernize Building 22, Project # 506-21-102. This project completely remodels Building 22. Building 22 is a 1970’s era Research facility and it will be fully updated to modern standards. For this J&A, VA Engineering requires the installation of Siemens Building Management System Components and Programming for the project. Provisions to update the existing site Building Management System and HVAC system controls are included in the new work. The installation will include furnishing and installing new sump pump control panels, energy recovery ventilators, and mini-split system DX cooling units.

3. Unique characteristics that limit availability to only one source, with the reason no other supplies or services can be used:

The installation of the HVAC controls and proprietary equipment will be awarded as a new contract to match the compatibility with the existing site HVAC system control system and programming.

4. Description of market research conducted and results or statement why it was not conducted: The qualified installation contractor will install a HVAC system compatible with the current facility HVAC system. The existing HVAC system is comprised of Siemens equipment, including the Building Management and monitoring system. Use of an alternate control system or vendor would require stocking of different types of equipment that are incompatible with the current operating system.

This would pose a potential risk of inoperable system control, downtime, and cost to the facility, resulting in safety issues and patient care concerns. Siemens Industry Inc. is the HVAC controls company that holds the maintenance contract for the proprietary equipment throughout facility.

5. Contracting Officer's Certification: Purchase is approved in accordance with FAR13.106-1(b). I certify that the foregoing justification is accurate and complete to the best of my knowledge and belief.

SCOTT D. BRENNAN Date Contracting Officer

Scott D.

Brennan 250586

Digitally signed by Scott D. Brennan 250586 Date: 2022.12.28 16:36:14 -05'00'

File details come from the government source that posted it. Updated .