3 AF Form 3052.pdf
Air Force Form PDF 37 KB Posted
- Attached to
- Repair Facility 131
- Solicitation number
- FA487721B0003
About this file
This document contains a construction cost estimate breakdown for repair work at Facility 131 at Davis Monthan Air Force Base in Arizona. The cost estimate includes line items for substructure, superstructure, exterior closure, roofing, interior construction, interior finishes, conveying systems, plumbing, HVAC, fire protection systems, electrical power and lighting, special electrical systems, equipment, furnishings, special construction, selective building demolition, site preparation, site improvements, site mechanical utilities, and site electrical utilities. The total proposed contract price is to be provided by the contractor. The related federal contract opportunity is a solicitation to reconfigure and renovate existing restrooms and showers, consolidate communications equipment, reconfigure the facility entrance, remove extraneous materials from exterior surfaces, clean and paint exterior walls, provide a new wet sprinkler system including a fire water service line and connection, replace the existing fire alarm system, install a new HVAC system, provide a new electrical service and interior electrical system, and make repairs to address life safety code and ADA deficiencies at Facility 131 at Davis Monthan Air Force Base in Arizona.
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
GOVERNMENT ESTIMATE
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
Rpr Facility 131
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
FBNV 150006 Davis Monthan AFB, AZ
MATERIAL COST LABOR COSTS
UNIT OTHER
LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
COST TO PRIME
OVERHEAD- FIELD AND OFFICE -$
PROFIT -$
TAX -$
BOND -$
TOTAL COST -$
AF Form 3052 JAN 88 PREVIOUS EDITION IS OBSOLETE PROJECT SUMMARY FOR OFFICIAL USE ONLY Page 1
CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTOR ADDRESS
GOVERNMENT ESTIMATE
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
Rpr Facility 131
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
FBNV 150006 Davis Monthan AFB, AZ
MATERIAL COST LABOR COSTS
UNIT OTHER
LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
ADDITION
1 Substructure -$
2 Superstructure -$
3 Exterior Closure -$ -$
4 Roofing -$ -$
5 Interior Construction -$ -$
6 Interior Finishes -$ -$
7 Conveying Systems -$ -$
8 Plumbing -$ -$
9 HVAC -$ -$
10 Fire Protection Systems -$ -$
11 Electrical Power and Lighting -$ -$
12 Special Electrical Systems -$ -$
13 Equipment -$ -$
14 Furnishings -$ -$
15 Special Construction -$ -$
16 Selective Building Demolition -$ -$
17 Site Preparation -$ -$
18 Site Improvements -$ -$
19 Site Mechanical Utilities -$ -$
20 Site Electrical Utilities -$
SHEET TOTAL -$ -$ -$
AF Form 3052 JAN 88 PREVIOUS EDITION IS OBSOLETE SYSTEM SUMMARY FOR OFFICIAL USE ONLY Page 2